Proyectos de Energías Renovables en Marruecos

1,464

Published on

Presentación en inglés

Presentación en inglés

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,464
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
36
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. THE KINGDOM OF MOROCCO NATIONAL OFFICE OF ELECTRICITY " ONE " Renewable Energy Projects in Morocco
  • 2.
    • Introduction
    • Integrated Wind Program
    • Moroccan Solar Project
    • Hydraulic Projects
    SUMMARY
  • 3. More than 4 million customers Public industrial and commercial establishment created in 1963 Turnover around 19,5 billion DH in 2010 (1700 Million € approx.) An investment of 3,8 milliards DH in 2010 (330 Million € approx.) Installed Capacity of 6372 MW at the end of 2010 ONE IN FIGURES More than 8 900 employees nationalwide
  • 4. Coal power plants 1 785 Fuel power plants 600 Natural Gas Combined-Cycle (Tahaddart) 380 Thermosolar power plant (Aïn Beni Mathar) 470 Gas turbines 915 Diesel Units 202 Hydraulic 1 306 Wind Power 253 Pump Storage Station (Afourer) 464 TOTAL 6375 Centrale Mohammedia Installed power (MW) at the end of 2010 Parc éolien de Tanger Centrale thermosolaire
  • 5. Lines Lenght HV & VHV 20 877 km MV 63 310 km LV 162 385 km Interconnection Morocco - Spain 1400 MW Interconnection Morocco - Algeria 1400 MW
  • 6. EVOLUTION INJECTED ENERGY (GW/h)
  • 7. DISTRIBUTION INJECTED ENERGY IN 2010
  • 8.
    • The kingdom of Morocco has been experiencing an accelerated economic and social development, resulting in a sustained growth of demand in electrical energy of around 6,5% .
    • To meet this challenge, an investment plan has been developed to provide among others, an electricity mix, where Renewable Energies play an important role (wind, solar and hydro energy).
    THE BIG CHALLENGE 6,5%
  • 9. 42% In 2020, the share of Renewables will reach 42% of the total installed capacity ENERGY MIX 2020
  • 10. INTEGRATED WIND PROGRAM
  • 11. MOROCCO WIND ATLAS
  • 12.
    • Installed Capacity by 2020 2000 MW
        • Projects realized or in progress 1000 MW
        • Complementary program 1000 MW
    • Annual Production 6600 GW/h
    • Investment 3,5 billion US $
    • Economizing 1,5 millions TEP/year
    • Reducing CO 2 emissions by 5,6 millions t / year
    INTEGRATED WIND PROGRAM - CHARACTERISTICS
  • 13.
    • Realized Wind farms
    • - Abdelkhalek Torres (IPP) 50 MW
    • - Essaouira (EPC) 60 MW
    • - Tanger (EPC) 140 MW
    • - Lafarge (self production) 32 MW
    • - CIMAR (self production) 5 MW
    • Wind farms in progress
    • - Tarfaya (IPP) 300 MW
    • - Koudia Baida (IPP)* 300 MW
    • - Wind projects (law 13-09) 420 MW
    • * The project consists in :
    • 1. Repowering of A. Torres : 100MW
    • 2. Exstension of A. Torres : 200 MW
    WIND FARMS REALISED AND IN PROGRESS
  • 14. SITES DE PARCS EOLIENS A. Torres : 50 MW Tanger : 140 MW Laayoune : 50 MW REALIZED AND IN PROGRESS WIND FARMS Wind farms realised Wind farms in progress Essaouira : 60 MW Haouma : 50 MW Akhfénir : 200 MW Khalladi : 120 MW Tarfaya : 300 MW CIMAR : 5 MW Lafarge : 32 MW Koudia Baida : 300 MW
  • 15.
    • The complementary integrated wind program :
        • Taza 150 MW
        • Tanger II 150 MW
        • Tiskrad 300 MW
        • Boujdour 100 MW
        • Midelt 150 MW
        • Jbel Al Hadid 150 MW
    • The program will be carried out within the framework of public-private partnerships where ONE , SIE and Hassan II Fund will be associated with one or more strong strategic partners in the wind energy industry and the electricity production sector.
    COMPLEMENTARY INTEGRATED WIND PROGRAM
  • 16. SITES DE PARCS EOLIENS LOCATIONS OF THE COMPLEMENTARY PROGRAM WIND PROJECTS Taza : 150 MW Tanger II : 150 MW Tiskrad : 300 MW Boujdour: 100 MW Midelt : 150 MW Jbel Al Hadid : 150 MW
  • 17. PREQUALIFIED COMPANIES : ENEL - MITSUI /EDF - IP/NAREVA FIRST PROJECT – TAZA : KEY MILESTONES Mid 2014 Commissioning June 2010 Integrated Wind program launch December 2010 Tenders prequalification process May 2011 Call for tenders December 2011 Tenders Opening February 2012 Tenders Evaluation
  • 18. March 2012 Call for tenders November 2011 Prequalification Launching Late 2013 Tenders Opening Late 2015 Commissioning of the1 st park KEY MILESTONES OF THE OTHER PROJECTS
  • 19. MORROCAN SOLAR PROJECT
  • 20. MOROCCAN SOLAR PROJECT
    • M oroccan A gency for S olar En ergy “MASEN” Developer
    • Project Total power 2000 MW
    • Five plants
      • Ouarzazate 500 MW
      • Aïn Beni Mathar 400 MW
      • Sebkhate Tah 500 MW
      • Foum Al Wad 500 MW
      • Boujdour 100 MW
    • Estimated annual production 4500 GW/h
    • Estimated cost 9 Billion US $
    • Commissioning dates
      • First plant 2015
      • The whole plants 2019
  • 21. PROJECTS LOCALIZATIONS Aïn Beni Mathar 400 MW Ouarzazate 500 MW Sebkhate Tah 500 MW Foum Al Wad 500 MW Boujdour 100 MW
  • 22. OUARZAZATE Project – First part CSP (125 MW) December 2010 Prequalification January 2010 Creation of MASEN
    • ABEINSA ICI / ABENGOA SOLAR / MITSUI / ABU DHABI NEC
    • ENEL / ACS SCE
    • INTERNATIONAL COMPANY FOR WATER AND POWER (ACWA) / ARIES IS / TSK EE
    • ORASCOM CI / SOLAR MILLENIUM / EVONIK STEAG
    April 2011 Call for tenders August 2011 Tenders Opening December 2011 Announcement of the selected bidder
  • 23. OBJETIVES OF THE INTEGRATED PROGRAM Electricity production Industrial Integration Training Research & Dévelopment Creation of competitive socio-economic sectors
  • 24.
    • Creation of IRESEN “Institute for Research in Solar Energy and New Energies” on February 2011.
    • IRESEN is positioned at the level of applied and technological research in solar and new energies sector in order to :
      • Accelerate technological transfer and
      • Transposition of research results into innovative products
    • IRESEN will also be a projects agency by executing and participating in the funding of R&D projects.
    • The progressive extension of IRESEN’s intervention and infrastructure area will be done according to the industries needs and demand for R&D .
    • IRESEN’s main objectives:
      • To carry out the R&D in solar and new energies at a national scale
      • To ensure the definition of the research axis
      • To coordinate and reinforce efficiency in research
      • To develop innovation and encourage networking
    THE NATIONAL R&D STRATEGY IN THE RENEWABLE ENERGY SECTOR
  • 25. IRESEN MASEN * ONEE * Universities & Engineer Schools MANAGEM OCP * CNRST MASCIR ONHYM * CNESTEN * Industries ADEREE *
    • Founding members
    FOUNDING MEMBERS AND PARTNERS OF IRESEN
  • 26.
    • A sectorial study has been done in 2010-2011 to specify the potential needs in human resources for Renewable Energies and Energy Efficiency sectors .
    • This research allowed :
      • To identify the labor market trends in these sectors
      • To define the specific job positions in these sectors
      • To diagnose current training offer, its correspondence to the requirements of job positions and training needs projections for 2020
    • Creation of Training Institutes for RE and EE jobs “IFMEREE” in Oujda, Ouarzazate and Tangier.
    • The Oujda institute will be operational by January 2013.
    • The Ouarzazate and Tangier institutes opening will be planned according to the services and industries development and needs in these areas.
    THE NATIONAL TRAINING STRATEGY IN RENEWABLES & ENERGY EFFICIENCY SECTORS
  • 27.
    • These Training Institutes will have to ensure to the companies staff :
      • Training before and during hiring
      • Improvement courses while working
    • They will have to become a regional reference in employees training and qualification.
    • The trainings offered by these institutes will qualify to the following jobs :
      • Wind Power Maintainer Installer
      • Solar Power Maintainer Installer (PV and thermal)
      • Energy Efficiency Technician
      • Biomass Technician
      • HVAC Technician
    TRAINING INSTITUTES MISSION
  • 28. HYDRAULIC PROJECTS
  • 29. EXISTING HYDRAULIC PLANTS 1700MW   Beginning of production Pi (MW) Prod (GWh) TANAFNIT – EL BORJ 2009 -2010 40 220 STEP AFOURER 2005 464 720 AIT MESSOUD 2003 6 34 AHMED EL HANSALI 2003 92 400 AL WAHDA 1998 240 220 ALLAL EL FASSI 1994 240 265 HASSAN I 1991 67 115 AL MASSIRA 1980 128 240 OUED EL MAKHAZINE 1979 36 72 IDRISS I 1978 41 54 M. DAHBI 1974 10 30 MOULEY YOUSSEF 1974 24 60 MOHAMMED V 1967 23 70 AFOURER 1954 94 473 BINE EL OUIDANE 1953 135 250 IMFOUT 1947 31 54 LALLA TAKERKOUST 1938 12 22 EL KANSARA 1935 14 29 AUTRES - 72 -
  • 30. OCEAN ATLANTIQUE Existing Hydraulic Plants STEP Centrales hydrauliques classiques TANGER MER MÉDITERRANÉE Tarfaya Boujdour Lagouira Projets en cours de MES EXISTING HYDRAULIC PLANTS LOCALIZATIONS
  • 31. Factory RIVER P i (MW) Prod (GWh) Current Stage Imezdilfane OER 63 90 Studied Projects (274MW) Taskdert 38 55 Tajemout 28 40 Merija OER 30 40 Mechra Sfa 30 40 Tarmast OER 14 25 SidiDriss Lakhdar 3 17 Asfalou Asfalou 20 30 Boutchilit Issen 28 46 Tilougguit Ahan ç al 20 69 STEP Ifahsa - 300 700 Projects being studied (320MW) Ouljet Essoltane Beht 20 33 M ’ dez Sebou 45 35 Projects in Launching Stage (520MW) El Menzel 125 265 STEP Abdelmoumen Issen 350 612 CURRENT PROJECTS PORTFOLIO
  • 32. MER MÉDITERRANÉE Tarfaya Boujdour Lagouira Projets en cours de MES HYDRAULIC PROJECTS BEING DEVELOPED CURRENTLY
  • 33. THANK YOU

×