Japan’s renewable energy revolution
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Japan’s renewable energy revolution

on

  • 172 views

Presentation to Hokkaido International Business Association, March 21, 2013

Presentation to Hokkaido International Business Association, March 21, 2013

Statistics

Views

Total Views
172
Views on SlideShare
172
Embed Views
0

Actions

Likes
0
Downloads
4
Comments
0

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Japan’s renewable energy revolution Presentation Transcript

  • 1. ``Japan’s Renewable Energy Revolution: What it Means For Hokkaido Businesses`` Eric Johnston Hokkaido International Business Association March 21st, 2013
  • 2. Japan and Renewable Energy: The Fundamental Facts  Proportion of Japan’s electricity generated by renewable energy, including hydro, in 2011: 9.1 percent  Proportion of electricity generated by renewable energy, excluding hydro, that same year: 1 percent  Official estimate of how much power solar energy could ``feasibly’’ generate: 100- 150GW  No. of homes one GW of energy will supply: 243,000
  • 3. Japan and Renewable Energy: The Fundamental Facts  Japan’s potential onshore wind power capacity: 30GW  No. of installed wind turbines (Sept. 2011): 1,807  Total wind energy generating capacity: 2.4GW  Est. geothermal generating capacity: 23.5GW  No. of geothermal plants: 19  Total generating capacity: 535MW
  • 4. The New Tariff means businesses in five different renewable energy industries can sell their power at a guaranteed fixed rate over a fixed period of time
  • 5. THE NEW FEED-IN TARIFFS SOLAR POWER Output Range ABOVE 10 KW BELOW 10KW Basic Tariff (per kilowatt/hour) 42 yen 42 yen PERIOD 20 years 10 years
  • 6. THE NEW FEED-IN TARIFFS WIND POWER Output Range ABOVE 20 KW BELOW 20KW Basic Tariff (per kilowatt/hour) 23.10 yen 57.75 yen PERIOD 20 years
  • 7. THE NEW FEED-IN TARIFFS GEOTHERMAL POWER Output Range ABOVE 15 KW BELOW 15KW Basic Tariff (per kilowatt/hour) 27.30 yen 42 yen PERIOD 15 years
  • 8. THE NEW FEED-IN TARIFFS MINI-HYDRO Output Range 1mW-30mW 200kW-1mW Under 200kW Basic Tariff (per kilowatt hour) 25.20 yen 30.45 yen 35.70 yen PERIOD 20 years
  • 9. THE NEW FEED-IN TARIFFS BIOMASS Sector Methane Gas Unused Wood Products General Wood Waste-related Biomass Recycled Wood Products Type Sewer Sludge Gas Household Waste Unused Wood Products General Wood Solid General Waste Solid Sludge “ Basic Tariff (per kwH) 40.95 yen 33.60 yen 25.20 yen 17.85 yen 13.65 yen Period 20 years
  • 10.  From April to October 2012, the number of renewable energy power facilities approved as targets by electricity purchasing schemes was 146,899, generating 2,557 megawatts (MW)  Electricity output from approved renewable sources: 86% was from solar power  Output from solar power facilities that generate 10 kW or more (non- residential), including mega solar power facilities, accounted for 64% of the total renewable energy sources.  Although a large quantity of the total approved power will
  • 11. GENERAL PROBLEMS AND CHALLENGES
  • 12. PROBLEMS AND CHALLENGES: SOLAR POWER Unlike many other countries, the FIT for solar power is strict, either under or over 10kW. Different FITs for 10, 20, 50, and 100 kW plants are desired. More flexibility with FIT period is needed. FIT critics charge that it is designed to benefit a few large
  • 13. PROBLEMS AND CHALLENGES: WIND POWER  FIT needs to be based on wind conditions of location, not a fixed amount of power generation for all locations.  Noise: Local communities complain about loud windmills  Birds: Bird strikes and migratory patterns mean strict environmental regulations on wind farm development in places like the area in and around the Kushiro Wetlands.  Remoteness: On-shore windmills often
  • 14. PROBLEMS AND CHALLENGES: GEOTHERMAL POWER  Vast majority of Japan’s geothermal resources in National Park areas: Strict Environmental regulations.  Many ideal geothermal locations on, or beside, onsens, whose politically- connected owners oppose geothermal development for business reasons.  Geothermal requires heavy initial investment. High cost to maintain and repair plants.
  • 15. PROBLEMS AND CHALLENGES: MINI- HYDRO POWER  Requires rivers and streams with regular flows of water at ideal speeds.  Strict gradation requirements often means construction work is needed, creating further environmental damage.  Remote areas of many ideal mini-hydro spots means increased costs to deliver generated electricity.
  • 16. PROBLEMS AND CHALLENGES: BIOMASS POWER  For Wood Products, responsibility is divided between Forestry Agency (under MAFF) and METI. Bureaucratic turf wars means bureaucratic headaches for Biomass producers.  Utilities very cold toward biomass power; grid connections are often extremely expensive.  Biomass seen more as heat, rather than electricity, generating resource.
  • 17. HOKKAIDO?
  • 18. Renewable Energy Projects Are Moving Forward, Especially in Solar and Wind  Japan’s largest solar power plant to date will be built in Hokkaido: 200MW-20 times the capacity of the country’s currently largest plant in Sakai, Osaka Pref.  Softbank’s Masayoshi Son has targeted Tomakomai and Obihiro for both solar and wind farm development. Projects are generating hundreds of megawatts.
  • 19. HOKKAIDO’S POTENTIAL (SOURCE: Renewable Energy Organization Hokkaido)
  • 20. HOKKAIDO’S POTENTIAL TOTAL ESTIMATED POTENTIAL OF RENEWABLE ENERGY IN HOKKAIDO: 5.7 billion kilowatts (55,682.8万kW) THIS IS THE EQUIVALENT OF 556 NUCLEAR POWER PLANTS–
  • 21. HOKKAIDO’S MAIN ADVANTAGES FOR EMBRACING RENEWABLES  Nuclear Power Lobby is extremely weak in Hokkaido, compared to Tokyo and especially Kansai.  Environmental conservation and awareness high.  Climate, topography, geography, population spread more favorable toward smaller, independent renewable energy projects than in large cities.  Conditions for offshore wind and
  • 22. CHALLENGES HOKKAIDO MUST OVERCOME FOR RENEWABLES  Tendency of local politicians and bureaucrats, and major corporations, to not take initiative and to leave all major decisions affecting Hokkaido to Tokyo.  Skepticism among many in Hokkaido, especially older generations running the prefecture, about technical feasibility of renewable energy.  Ensuring that weather extremes do not interrupt renewable energy supplies, especially in winter.