Turbine on left is on the East End of St. CroixSt Croix Reform Church breaksground for 10Kw Wind Turbine
St. Croix Reform Church isthinking of the future. PastorRod Koopmans overlooksyoungsters Nov. 13 atgroundbreaking ceremony...
The groundbreaking ceremony was a festive occasion
The church is advertising its efforts
The church’s relationship with renewable energy         is becoming part of its image
Sometimes theyoungstersneeded somehelp
Sometimes itwas fun just towatch
Church members gathered on the hill top to watch        groundbreaking and sing hymns
The Energy Office’s DonBuchanan was there Sundaymorning to turn a little dirt.
Somerefreshmentswere part ofthecelebration.
Pastor                                               Koopmans gives                                               thanks f...
Photos by Carol BuchananSt. Croix Reform Church , November 2011, Groundbreaking for wind turbine
Upcoming SlideShare
Loading in …5
×

Church groundbreaking

11,309 views

Published on

Published in: Technology, Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
11,309
On SlideShare
0
From Embeds
0
Number of Embeds
10,232
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Church groundbreaking

  1. 1. Turbine on left is on the East End of St. CroixSt Croix Reform Church breaksground for 10Kw Wind Turbine
  2. 2. St. Croix Reform Church isthinking of the future. PastorRod Koopmans overlooksyoungsters Nov. 13 atgroundbreaking ceremonyfor a new 10 Kw windturbine at the church on topof Kings Hill.
  3. 3. The groundbreaking ceremony was a festive occasion
  4. 4. The church is advertising its efforts
  5. 5. The church’s relationship with renewable energy is becoming part of its image
  6. 6. Sometimes theyoungstersneeded somehelp
  7. 7. Sometimes itwas fun just towatch
  8. 8. Church members gathered on the hill top to watch groundbreaking and sing hymns
  9. 9. The Energy Office’s DonBuchanan was there Sundaymorning to turn a little dirt.
  10. 10. Somerefreshmentswere part ofthecelebration.
  11. 11. Pastor Koopmans gives thanks for a good wind reading.The turbine project is expected to be completed by Christmas.Funds saved on energy costs is to be allocated to church missionprojects.
  12. 12. Photos by Carol BuchananSt. Croix Reform Church , November 2011, Groundbreaking for wind turbine

×