Your SlideShare is downloading. ×
Strategic Action Planning for Revival of Bangalore Lakes_KSPCB
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Strategic Action Planning for Revival of Bangalore Lakes_KSPCB

278
views

Published on

Published in: Technology, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
278
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. WorkshopStrategic Action Planning for Revival of Bangalore Lakes Presentation by Chairman, KSPCB 04-04- 2013 Hotel Taj West End Bangalore
  • 2. Lakes/Tank Rejuvenation initiatives Series of Stakeholders consultation meets on Rejuvenation of lakes/tanks Insisting Industries/Developers to take up Tanks for improvement under Corporate Social Responsibility View of Stakeholders consultation-Hennagara Gram Panchayat 2
  • 3. Criteria for lake rejuvenation projects• Lake should be small.• Lake should be situated in semi urban areas.• It should have less litigation & encroachments.• There shall not be entry of sewage.• The rejuvenation budget should be small approx 50Lakhs• It should be possible to complete in 6 months• The ownership of the lake will be with ULB’s• There will be a board of the sponsorers 3
  • 4. Finance for Lake Rejuvenation Projects• Karnataka State Pollution Control Board Cess Funds• Industries, Developers & other stakeholders as a part of Corporate Social Responsibilities• Donors from different organizations of the society 4
  • 5. Action taken with BWSSB & Suggestion given• Collected water cess arrears and amount will be invested in the projects taken by BWSSB for rejuvenation of lakes.• Insisted to discharge sewage water into lake after treatment.• A proposal for pumping of treated water to Bangalore University campus.• Initiated action on diversion of waste water from open drain to manhole, which ultimately joins to nearest treatment system, then to lakes. 5
  • 6. Construction of silt trap in stages will reduce the flow of sewage in thedrain gradually.Action not yet taken to utilise the full capacity of V.Valley STP(only 30%being used).Entire BBMP area has to be covered by the BWSSB and any directdischarge from the erstwhile CMC area into any lakes has to beprevented.BWSSB has to enter into an agreement with horticultureDepartment, Forest Department, BDA for programmes such as stonepitching, beautification by gardening, making walkway etc.Sewage in its septic condition to the tune of about 12 to 15 MLD(Peenya and other area) is bypassed from Madavara lake and the samefurther joins T.G.Halli Catchment. The same can be uploaded intoNagasandra STP which is operating at 30% its capacity.The sewage treatment/diversion at V.Valley region is below par.
  • 7. Lakes/Tank Water Quality improvement interventions Taken up issue of arresting sewage flow into lakes with BWSSB –Inflow to STPs reached 63% as on 28-2-2013 of installed capacity (721 MLD) Improved sewage inflow into K.R.Puram STP by diverting sewage from the near by open drain thereby augmenting flow from 6 MLD to 10 MLD• Diversion Dyke made of SSM-Sewage flowing into STP(1 ft depth trench beneath has been made) 7
  • 8. Lakes/Tank Water Quality improvement interventions• Date of Completion 22-01-2013• Board adopted policy not to permit discharge of treated effluent into water body & to promote use of same for agriculture /Recycle for the secondary purpose• Board is monitoring water quality of 66 lakes in Bangalore View of Clear Treated Sewage 8 Entering the K.R.Puram lake
  • 9. Lakes/Tank Water Quality improvement interventionsView of Clear Treated SewageEntering the K.R.Puram lake 9
  • 10. B.Hosahalli lake Before & After Rejuvenation 10
  • 11. Bisleri InternationalLake and Lake Type Borewell Recharging Unit
  • 12. Status of Pushkarni’s at Chitradurga 12
  • 13. Status of Pushkarni’s at Chitradurga 13
  • 14. Thank You