• Like
Hendre ifan goch farm hydro web
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

Hendre ifan goch farm hydro web

  • 198 views
Published

 

Published in Business , Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
198
On SlideShare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Hendre Ifan Goch Farm 5.5 Kw Hydro Generator
  • 2. Stages in development •Feasibility Study by Roberto Sotgiu – Hydrolite Ltd •Planning •Environment Agency approval •Installation •MCS registration •FIT registration
  • 3. Measurements on site
  • 4. INSTALLATION OF PIPES
  • 5. 180mm SDR black Pipe 100 m coils
  • 6. Pipe uncoiled and stretched
  • 7. Pipes into Generator House Installation of Generator
  • 8. New Filter Fitted June 2013
  • 9. Facts & Figures Feasibility Report £ 287.70 Cost £15,590.00
  • 10. Intake, Catchment & turbine house location • Both intakes will require adequate screening to prevent the ingress of debris,frogs or stones • Estimated annual rainfall runoff within Catchment is 1431mm • An estimated annual yield of 16.7 MWh = reduction of carbon emission of roughly 8 tonnes /year
  • 11. Costs Estimated Cost & PayBack Item Details Cost Intake 2 x St/steel wire remveable Filter £ 500.00 Penstock Cable & Pipe Trench Penstock upgrade Existing Self Fit 350m 180mm black SDR 17 10 bar HPPL Pipex Coils 5 no Fusion Connectors £ 3,460.00 £ 100.00 Tubine Housing Existing £ 8,800.00 Turbine Manifold st/steel manifold with st/steel flexi houses etc Turbine Casing Med st/Steel Case, 1 window Turbine & Arbour 20 orange cups Nozzles 1 x SV3 Mechanical Installation Turbine, Manifold Assy Generator & Controller Grid Linking Controller & Induction Generator Electrical Installation Metering ,disconnects,safety test certificate,cable handling Signal Cabling 400m of 3 core 1.5mm armoured , glands etc £ 1,130.00 Export Cabling 320m of 3 core 35mm armoured, glands etc Transformer upgrade if required £ - Design Turbine house layout,turbine design,intake design,onsite work,scheduling deliveries & contract labour; liasing with suppliers;DNO Application;Ofgem consultationProject Management £ 1,000.00 Travel £ 300.00 Licensing EA & Planning £ 300.00 Total Cost £ 15,590.00 EST Annual Revenue Actual 1st year £5423.19 £ 4,003.00 Pay Back Time 4 years