Your SlideShare is downloading. ×
2. analisis precios unitarios - sello asfaltico y señalizacion
2. analisis precios unitarios - sello asfaltico y señalizacion
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

2. analisis precios unitarios - sello asfaltico y señalizacion

7,952

Published on

Published in: Design
0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
7,952
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
287
Comments
0
Likes
2
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. S10 Página : 1Empresa no registrada Análisis de precios unitariosPresupuesto 0101010 MEJORAMIENTO DE LA AVENIDA ESPAÑA DE LA CIUDAD DE TRUJILLO - SELLO ASFALTICO Y SEÑALIZACION.Subpresupuesto 001 SELLO ASFALTICO Y SEÑALIZACION Fecha presupuesto 31/05/2008Partida 01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPORendimiento MO. 8.0000 EQ. 8.0000 Costo unitario directo por : GLB 1,280.00Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/. Equipos0348040013 CAMION PLATAFORMA 4x2 178-210 HP 12 TON. hm 1.0000 1.0000 1,280.00 1,280.00 1,280.00Partida 01.02 DESVIO Y MANTENIMIENTO DE TRAFICORendimiento MO. 1.0000 EQ. 1.0000 Costo unitario directo por : GLB 1,720.44Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/. Mano de Obra0147010001 CAPATAZ hh 0.5000 4.0000 11.27 45.080147010002 OPERARIO hh 6.0000 48.0000 10.25 492.000147010004 PEON hh 12.0000 96.0000 8.16 783.36 1,320.44 Materiales0230990001 CONOS, SEÑALES PARA TRANSITO GLB 1.0000 200.00 200.000244910001 TRANQUERAS GLB 1.0000 200.00 200.00 400.00Partida 01.03 CARTEL DE OBRA DE 6.00 x 3.60 m.Rendimiento MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 1,357.96Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/. Mano de Obra0147010001 CAPATAZ hh 0.1000 0.8000 11.27 9.020147010002 OPERARIO hh 2.0000 16.0000 10.25 164.000147010003 OFICIAL hh 1.0000 8.0000 9.07 72.560147010004 PEON hh 1.0000 8.0000 8.16 65.28 310.86 Materiales0202010061 CLAVOS CON CABEZA DE 21/2", 3" Y 4" kg 1.5000 4.87 7.310202050002 PERNO 5/8" x 8" C/TUERCA Y ANILLO und 12.0000 3.50 42.000205000010 PIEDRA MEDIANA MAX. 4" m3 0.2835 21.85 6.190221000000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 2.4638 15.55 38.310230770001 AGUA m3 0.1080 6.00 0.650238000000 HORMIGON m3 0.6548 20.17 13.210243010003 MADERA TORNILLO p2 205.0000 3.50 717.500244030021 TRIPLAY DE 4x8x 4 mm pln 7.5000 22.69 170.180254110090 PINTURA ESMALTE gln 1.5000 32.50 48.750254110092 PINTURA BASE SINOLIT BOL 0.6000 5.00 3.00 1,047.10Partida 02.01 TRATAMIENTO DE FISURASRendimiento MO. 200.0000 EQ. 200.0000 Costo unitario directo por : m 2.37Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/. Mano de Obra0147010001 CAPATAZ hh 0.1000 0.0040 11.27 0.050147010003 OFICIAL hh 1.0000 0.0400 9.07 0.360147010004 PEON hh 1.0000 0.0400 8.16 0.33 0.74 Materiales0204000000 ARENA FINA m3 0.0015 21.00 0.030213030001 EMULSION ASFALTICA CSE (INCLUYE FLETE) gln 0.0700 15.00 1.05 1.08 Equipos0348050003 CAMIONETA SIMPLE TRACCION GLB 0.0025 20.00 0.050349020007 COMPRESORA NEUMATICA 76 HP 125-175 PCM hm 0.2500 0.0100 50.00 0.50 0.55Partida 03.01 BARRIDO Y LIMPIEZAC/EQUIPO PARA EL SELLADORendimiento MO. 5,600.0000 EQ. 5,600.0000 Costo unitario directo por : m2 0.16Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/. Mano de Obra
  • 2. 0147010023 CONTROLADOR (OFICIAL) hh 1.0000 0.0014 9.07 0.01 0.01 Equipos0349020007 COMPRESORA NEUMATICA 76 HP 125-175 PCM hm 2.0000 0.0029 50.00 0.15 0.15Partida 03.02 SELLO ASFALTICO C/EQUIPO.Rendimiento MO. 6,150.0000 EQ. 6,150.0000 Costo unitario directo por : m2 4.33Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/. Mano de Obra0147010001 CAPATAZ hh 1.0000 0.0013 11.27 0.010147010004 PEON hh 6.0000 0.0078 8.16 0.060147010023 CONTROLADOR (OFICIAL) hh 1.0000 0.0013 9.07 0.01 0.08 Materiales0205010004 ARENA GRUESA m3 0.0120 21.00 0.250205010033 CONFITILLO 3/8" m3 0.0080 35.29 0.280213000006 ASFALTO RC-250 gln 0.4000 8.55 3.42 3.95 Equipos0349030043 RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T hm 1.0000 0.0013 100.00 0.130349130004 CAMION IMPRIMADOR 6x2 178-210 HP 1,800 G hm 1.0000 0.0013 130.00 0.17 0.30Partida 03.03 BARRIDO Y ELIMINACION DE ARENA SOBRANTERendimiento MO. 1,500.0000 EQ. 1,500.0000 Costo unitario directo por : m2 0.20Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/. Mano de Obra0147010001 CAPATAZ hh 0.1000 0.0005 11.27 0.010147010004 PEON hh 2.0000 0.0107 8.16 0.09 0.10 Materiales0230730001 ESCOBAS und 0.0020 6.00 0.01 0.01 Equipos0348040023 CAMION VOLQUETE 4x2 140-210 HP 6 M3. hm 0.2000 0.0011 80.00 0.09 0.09Partida 04.01 SEÑALIZACION HORIZONTAL, PINTURA BLANCA.Rendimiento MO. 75.0000 EQ. 75.0000 Costo unitario directo por : m2 11.50Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/. Mano de Obra0147010001 CAPATAZ hh 0.1000 0.0107 11.27 0.120147010002 OPERARIO hh 1.0000 0.1067 10.25 1.090147010004 PEON hh 2.0000 0.2133 8.16 1.74 2.95 Materiales0254440003 DISOLVENTE PARA PINTURA DE TRAFICO gln 0.0500 35.00 1.750254450002 PINTURA PARA TRAFICO gln 0.0750 55.00 4.13 5.88 Equipos0349020012 COMPRESORA hm 0.5000 0.0533 50.00 2.67 2.67Partida 04.02 SEÑALIZACION HORIZONTAL, PINTURA AMARILLA.Rendimiento MO. 75.0000 EQ. 75.0000 Costo unitario directo por : m2 11.50Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/. Mano de Obra0147010001 CAPATAZ hh 0.1000 0.0107 11.27 0.120147010002 OPERARIO hh 1.0000 0.1067 10.25 1.090147010004 PEON hh 2.0000 0.2133 8.16 1.74 2.95 Materiales0254440003 DISOLVENTE PARA PINTURA DE TRAFICO gln 0.0500 35.00 1.750254450002 PINTURA PARA TRAFICO gln 0.0750 55.00 4.13 5.88 Equipos0349020012 COMPRESORA hm 0.5000 0.0533 50.00 2.67 2.67

×