Hedge End sub station - Rainwater Harvesting case study

by on Oct 08, 2012

  • 155 views

The system is designed on the assumption the rainwater demand is low enough so the tank does not run dry. No mains water back-up is available for WC flushing and hand basin applications.

The system is designed on the assumption the rainwater demand is low enough so the tank does not run dry. No mains water back-up is available for WC flushing and hand basin applications.

Accessibility

Categories

Upload Details

Uploaded via SlideShare as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

Cancel

4 Embeds 28

http://www.harvestingrainwater.co.uk 9
http://www.building-services-resource.co.uk 9
http://www.industrytoday.co.uk 7
http://feeds.feedburner.com 3

Statistics

Likes
0
Downloads
0
Comments
0
Embed Views
28
Views on SlideShare
127
Total Views
155
Post Comment
Edit your comment

Hedge End sub station - Rainwater Harvesting case study Hedge End sub station - Rainwater Harvesting case study Presentation Transcript