Integrated Geologic Hazard Management System - August 2010
Upcoming SlideShare
Loading in...5
×
 

Integrated Geologic Hazard Management System - August 2010

on

  • 1,423 views

ODOT presentation from the 10th Annual Technical Forum (http://www.marshall.edu/cegas/geohazards/)...

ODOT presentation from the 10th Annual Technical Forum (http://www.marshall.edu/cegas/geohazards/)
Geohazards section of the GeoMS, which is the overlying 'umbrella' in which all parts are included.

Statistics

Views

Total Views
1,423
Views on SlideShare
1,245
Embed Views
178

Actions

Likes
0
Downloads
16
Comments
0

1 Embed 178

http://www.earthsoft.com 178

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Integrated Geologic Hazard Management System - August 2010 Integrated Geologic Hazard Management System - August 2010 Presentation Transcript

  • INTEGRATED GEOLOGICAL HAZARD MANAGEMENT SYSTEM
    Kirk D. Beach
    Ohio Department of Transportation
    Robert Y. Liang, Ph.D., P.E.
    University of Akron
    Frank Feng
    Acetek Ltd.
  • Ohio’s Geological Hazards
    Abandoned Underground Mines
    Rockfalls
    Landslides
    Karst
    Shoreline Erosion
  • Development of a Geologic Hazard Management System
    History
    1998
    Abandoned Underground Mine Inventory & Risk Assessment
    2000
    Developed a database application for AUMIRA
    Initiated inventory of AUMIRA sites
    2001
    Research work conducted to develop the Rockfall Inventory
    2003
    Research work began on the Landslide Inventory
    2004
    Development of a Remediation Cost Database Application
  • Development of a Geologic Hazard Management System
    History
    2005
    Implemented statewide Rockfall Inventory
    2008
    Initiated an inventory of Landslide sites across the state
    2009
    Integrated the Geohazard Inventories with the RCDA and DocMS
    2010
    Completed the statewide inventory of AUMIRA sites
    Completed the Integration of the Geological Hazard Management System
  • Xplore ix104c
  • Field Data Input
    Consistency
    Project location information
    Functionality
    Equipment compatibility
    Multiple data input modes
    Bluetooth
    Serial ports
    Other manual methods
  • Field & Office Data Collection
    6.2-hrs
    5.17-hrs
    1.58-hrs
    0.83-hrs
  • Bluetooth…
  • Pictures
  • Server
    Field Operations
    Office
  • Geological Hazard Management System
    Data Management
    Part A
    Part B
    Part C
    GIS Map
    Data Management
    System Management
    User Management
    Group Management
    Role Management
    User Approval
    System Tools
  • Geological Hazard Management System
    Data Management Extension
    Exports
    Generating Reports
    Documents and Pictures
    Cost of Remediation
    Inspection
    Validation Settings
    User Forum
    Reporting Bugs
    Providing Suggestions
    Notification
    Geohazard Report
  • Status of Statewide Inventories
    Abandoned Underground Mine Inventory
    Complete with 1776 site reviews with 1171 Inventoried Sites
    Represents 495 lane miles
    Estimated remediation cost of $875 Million for 555 Priority Sites
    Rockfall Inventory
    47% complete
    5000 sites
    Estimate 1.5-yrs to complete
    Landslide Inventory
    23% complete
    5100 sites
    Estimate 3-yrs to complete