• Email
  • Favorite
  • Download
  • Embed
  • Private Content

Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

Building Harvest Wind Project

by Eugene Water & Electric Board on May 28, 2010

  • 742 views

Watch the construction of the Harvest Wind project from start to finish. EWEB owns 20 percent of the Glendale, Wash. project, which can generate almost 100 megawatts of electricity.

Watch the construction of the Harvest Wind project from start to finish. EWEB owns 20 percent of the Glendale, Wash. project, which can generate almost 100 megawatts of electricity.

Accessibility

Categories

Tags

eugene water & electric board wind power harvest wind renewable energy eweb

More...

Upload Details

Uploaded via SlideShare as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

Cancel

4 Embeds 270

http://www.eweb.org 206
http://eweb.org 49
http://www.slideshare.net 9
http://eweborgtest.ewebnetwork.net 6

Statistics

Favorites
0
Downloads
2
Comments
0
Embed Views
270
Views on SlideShare
472
Total Views
742
Post Comment
Edit your comment Cancel

Building Harvest Wind Project — Presentation Transcript