• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Aug 23, 2010 entrips evaluation presentation.ppt
 

Aug 23, 2010 entrips evaluation presentation.ppt

on

  • 278 views

 

Statistics

Views

Total Views
278
Views on SlideShare
278
Embed Views
0

Actions

Likes
0
Downloads
1
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Aug 23, 2010 entrips evaluation presentation.ppt Aug 23, 2010 entrips evaluation presentation.ppt Presentation Transcript

    • Eastern Neighborhood TRIPS Community Task Force meetingEVALUATION FRAMEWORK ROADMAP & TOOLKIT 08 | 23 | 2010 | SAN FRANCISCO, CALIFORNIA
    • Agenda•  Schedule Timeline•  Proposed Evaluation Framework Methodology•  Rights of way Toolkits•  Project Sorting•  Next Steps 2
    • DRAFT Project Development Work Flow TRACK 1 - Network Circulation Projects EVALUATIO EN TRIPS N Existing Develop/ FRAMEWO Conditions Model Model Refine MAJOR RK Circulation NETWORK Conceptual Environmental Analysis Traffic (No Alternatives Traffic Corridor Design Review Project) (Project) Project PROJECT Concepts PACKAGES Existing System TRACK 2 – Neighborhood-ScaleDeficiencie Projects Fast Track Future s Future System Included in Improvements/ Conditions Deficiencies another PilotsUniverse of Modal / Universe plan? Potential Analysis of Potential Projects Projects NEIGHBORHO Prioritized List EN TRIPS OD SCALE of Future Potential PROJECT Investments StreetEN Area Plans BSP Street Projects PACKAGES (Capital and Design Typology List /Other City Guidance Programming) Project & Plans TRACK 3 – Area-wide Policy Goods Movement Policy City Policy, Shuttle Policy Future Planning Parking Policy Studies 3 TDM Policy
    • DRAFT Project Development Work Flow TRACK 1 - Network Circulation Projects EVALUATIO EN TRIPS N Existing Develop/ FRAMEWO Conditions Model Model Refine MAJOR RK Circulation NETWORK Conceptual Environmental Analysis Traffic (No Alternatives Traffic Corridor Design Review Project) (Project) Project PROJECT Concepts PACKAGES Existing System TRACK 2 – Neighborhood-ScaleDeficiencie Projects Fast Track Future s Future System Included in Improvements/ Conditions Deficiencies another PilotsUniverse of Modal / Universe plan? Potential Analysis of Potential Projects Projects NEIGHBORHO Prioritized List EN TRIPS OD SCALE of Future Potential PROJECT Investments StreetEN Area Plans BSP Street Projects PACKAGES (Capital and Design Typology List /Other City Guidance Programming) Project & Plans TRACK 3 – Area-wide Policy Goods Movement Policy City Policy, Shuttle Policy Future Planning Parking Policy Studies 4 TDM Policy
    • Preliminary Evaluation Framework•  Mix of qualitative & quantitative criteria –  Key Goals-identifies the issue –  Evaluation Criteria-identifies the objective:•  Three Integrated Sets of Priority Settings: 1.  Systemwide Network (operational, modal capacity/priority, right of way reconfiguration, directional changes) 2.  Neighborhood/specific (cross-walks, parking, loading, specific traffic calming) 3.  Policies to aid street design/land-use (shuttles, parking, loading & travel demand management) 5
    • DRAFT Project Development Work Flow TRACK 1 - Network Circulation Projects EVALUATIO EN TRIPS N Existing Develop/ FRAMEWO Conditions Model Model Refine MAJOR RK Circulation NETWORK Conceptual Environmental Analysis Traffic (No Alternatives Traffic Corridor Design Review Project) (Project) Project PROJECT Concepts PACKAGES Existing System TRACK 2 – Neighborhood-ScaleDeficiencie Projects Fast Track Future s Future System Included in Improvements/ Conditions Deficiencies another PilotsUniverse of Modal / Universe plan? Potential Analysis of Potential Projects Projects NEIGHBORHO Prioritized List EN TRIPS OD SCALE of Future Potential PROJECT Investments StreetEN Area Plans BSP Street Projects PACKAGES (Capital and Design Typology List /Other City Guidance Programming) Project & Plans TRACK 3 – Area-wide Policy Goods Movement Policy City Policy, Shuttle Policy Future Planning Parking Policy Studies 6 TDM Policy
    • DRAFT Project Development Work Flow TRACK 1 - Network Circulation Projects EVALUATIO EN TRIPS N Existing Develop/ FRAMEWO Conditions Model Model Refine SYSTEMWID RK Circulation E NETWORK Conceptual Environmental Analysis Traffic (No Alternatives Traffic Corridor Design Review Project) (Project) Project PROJECT Concepts PACKAGES Existing System TRACK 2 – Neighborhood-ScaleDeficiencie Projects Fast Track Future s Future System Included in Improvements/ Conditions Deficiencies another PilotsUniverse of Modal / Universe plan? Potential Analysis of Potential Projects Projects NEIGHBORHO Prioritized List EN TRIPS OD SCALE of Future Potential PROJECT Investments StreetEN Area Plans BSP Street Projects PACKAGES (Capital and Design Typology List /Other City Guidance Programming) Project & Plans TRACK 3 – Area-wide Policy Goods Movement Policy City Policy, Shuttle Policy Future Planning Parking Policy Studies 7 TDM Policy
    • Preliminary Evaluation Framework•  Evaluate the performance of the systems•  Prioritize and rank projects/policies: –  Identify & Prioritize EN-TRIPS systems network packages –  Complete major environmental clearance•  Identify EN-TRIPS neighborhood projects that can be fast-tracked: –  Low-cost/Street Innovative type pilots/trials (develop toolkit) –  Policies that can be implemented in short-term (e.g. loading/ parking) –  Complete with minor environmental clearance 8
    • 9Typical One-Way SoMa Streetscape
    • Typical SoMa Streetscape with Wider 10 Sidewalks
    • One-way SoMa Streetscape with Dedicated 11 Transit Lane
    • 12One-Way SoMa Streetscape with Toolkits
    • One-Way SoMa Streetscape with Two-Way 13 Toolkit
    • Pedestrian and Bicycle Incidents & Key14 Corridors
    • Next Steps•  Future Conditions Analysis – Develop future conditions modeling inputs – Perform future condition model runs using base network assumptions – Identify initial key-corridor intersections for Modeling analysis 15
    • EN-TRIPS 6 month Look Ahead Task Milestone DateComplete Evaluation Framework & Sorting Sep-2010Taskforce Future Conditions Assumptions Update Sep-2010EN TRIPS update Citywide Community Meeting Sep-2010Future Year Land Use & Transportation Conditions Report Sep-2010Key EN Priority Corridor Streetscapes Public Workshops (Taskforce/Citywide) Oct-Nov 2010Preliminary Street/Neighborhood Redesign Options/Project Sorting Prioritization Nov-2010Taskforce Street/Neighborhood Improvement Projects Update Dec-2011Key Eastern neighborhoods Transportation Public Realm Improvement Projects Report Jan-2011Begin Systemwide Environmental Review Jan-2011Begin Neighborhood Pilots/Trials Jan-2011EN TRIPS update Citywide Community Meeting Jan-2011Taskforce Funding and Implementation Strategy Update Jan-2011ENTRIPS Funding and Implementation Strategy Report Feb-2011EN TRIPS update Citywide Community Meeting Feb-2011 Mar-2011 16