ANZ Momentum Day 2012: Scott Leach - EMC OnDemand
 

ANZ Momentum Day 2012: Scott Leach - EMC OnDemand

on

  • 906 views

 

Statistics

Views

Total Views
906
Slideshare-icon Views on SlideShare
906
Embed Views
0

Actions

Likes
0
Downloads
22
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    ANZ Momentum Day 2012: Scott Leach - EMC OnDemand ANZ Momentum Day 2012: Scott Leach - EMC OnDemand Presentation Transcript

    • EMC OnDemand Your cloud journey starts now Scott Leach EMC Corporation MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 1
    • © Copyright 2011 EMC Corporation. All rights reserved. 2
    • Agenda Challenges with Enterprise Software What is OnDemand? Moving to OnDemand – Considerations Roadmap Questions? MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 3
    • Business Problem Cost, complexity, and time required to implement on-premise information management services often exceed business value© Copyright 2011 EMC Corporation. All rights reserved. 4
    • Large scale technology Cost of deployment is deployments are 5-15x cost of software USUALLY 2x over budget Key people OFTEN leave deployment projects on short notice creating a knowledge gap Business requirements fluctuate even mid deployment TYPICAL ENTERPRISE APPLICATION PROJECTS?© Copyright 2011 EMC Corporation. All rights reserved. 5
    • THE I.T. BUDGETSource: Forrester Research, Inc., IT Budget Allocations: Planning For 2011, December 3, 2010 © Copyright 2011 EMC Corporation. All rights reserved. 6
    • WHAT IS THE COST? WHAT DOES IT TAKE? HOW LONG DOES IT TAKE? CHANGE Something here INFRASTRUCTURE MANAGEMENT? HARDWARE EXPERTISE APPLICATIONS 6 MONTHS DISRUPT ON AVERAGE Something here GETTING APPLICATIONS UP AND RUNNING MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 7
    • Mid-Size Documentum ArchitectureServer Installations Client Components Documentum Content Server 6.5 sp2 (with Patch 20) Documentum Webtop 6.5 sp2 (with Patch 20) Unified Client Facility (UCF) 6.5 Development Documentum Administrator 6.5 sp2 (with Patch 20) sp2 (with Patch 20) Documentum Compliance Manager 6.5 sp2 (with Patch 20) VM HTTP VM Content & VM Web Server 1 Web Server 1 Web Server 2 VM Index Server VM ADTS & SCS Server EMC SourceOne MRE 6.5SAN – Database Server sp2 File Server Documentum Reporting Services 6.5 sp2 (with Patch (with Patch 20) 13) Documentum Site Caching Services (source only) 6.5 WDK Drag and Drop plugin DLL sp1 QA/Test 6.5 sp2 Documentum Full Text Indexing Server 6.5 sp2 Documentum Records Manager Administrator 6.5 sp2 My Documentum for Microsoft Web Server 1 Web Server 2 Web Server 3 SCS Server 6.5 sp2 Outlook File Server – My-Documentum- (Cluster) Server Server 1 for-Microsoft-Outlook-WebService- 2 x VM HTTP Web Content Index Server VM VM VM VM ADTS & Database Server SAN 6.5-SP2 (with Patch 13) Documentum Advanced Document Transition Services Documentum Application 6.5 sp2 (with Patch 19) Connectors 6.5 sp2 Documentum Queue Manager 6.5 sp2 (with Patch 20) Documentum Physical Records Manager 6.5 sp2 Production Oracle Enterprise Edition 11.1.0.6 File Server – Oracle 11g clientHTTP Web Content 2 x VM Server 1 (Cluster) Server Index Server VM VM VM VM VM ADTS & Web Server 1 Web Server 2 Web Server 3 Web Server 2 SCS Server Database Server SAN Oracle 11g Data guard 11g IBM WebSphere Application Server V6.1 Fix Pack 21 (6.1.0.21) Web Services Feature Pack 6.1.0.9 Disaster Windows Server 2003 SP2 Recovery Trend Micro ServerProtect Symantec NetBackup v6.5 Client VM VM HTTP VM Content & VM Index VM ADTS & Database File Server – Web Server 1 Web Server 1 Web Server 2 Server SCS Server Server SAN HP Systems Insight Manager agent CSC BOS v4.01 agent Double-Take 5.0 Microsoft Office 2007 © Copyright 2011 EMC Corporation. All rights reserved. 8
    • 10 15 20 30 25 0 5 Antivirus Change Mgmt Desktop End user Product File Server© Copyright 2011 EMC Corporation. All rights reserved. Firewall Human error Load Local network Monitoring Network Custom Code Portal Root cause unknown Root cause by Component SAN Siteminder Active Directory P1/P2 SR History for Documentum Total9
    • What is IS THE EMC OnDemand? PERFECT? A new enterprise-class CLOUD hybrid cloud deployment model managed by EMC experts MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 10
    • EMC vCUBE MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 11
    • YOUR EMC OnDemandDATA CENTER OFF-PREMISE MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 12
    • EMC OnDemand ADVANTAGES Quick start up Professional Easy adoption of Disaster Recovery and Administration New features and High Availability technologies MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 13
    • What we provide Network Connectivity – Our side of VPN Tunnel – Our Internal Networking Infrastructure ▪ Routers, Firewalls, Switches (virtual and physical) Our Hardware Infrastructure – Power, Compute, Storage, HVAC Our Software Infrastructure – Virtualization, Monitoring, Authentication, OS, DB, App Server, Anti- virus, Backup Managed EMC IIG Software: – Installation & Updates – Configuration & Tuning – Monitoring – Deployment of Supported Custom Code – Development, Test, Production, DR MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 14
    • Responsibilities • User experience EMC / Hosting Provider(Off-Premise) • Choice computing 1 or Customer• (On-Premise) Agility Infrastructure • NPS 2 + + EMC OnDemand Administrator • Application Composition Platform • EMC Alignment 3 EMC • Complexity reduction OnDemand Administrator • Access to new markets Application • Information dispersion 4 Customer, • eDiscovery Partner, or EMC • EMC Alignment Customer© Copyright 2011 EMC Corporation. All rights reserved. 15
    • MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 16
    • MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 17
    • MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 18
    • MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 19
    • MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 20
    • MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012© Copyright 2011 EMC Corporation. All rights reserved. 21
    • MOVING TO ONDEMAND CONSIDERATIONS© Copyright 2011 EMC Corporation. All rights reserved. 22
    • Considerations Forrester ECM Cloud Survey - 2011 Customisations  Performance Migration / Transition effort  Cost Data Sovereignty / DC Locations MOMENTUM DAY ANZ 2012 | SYDNEY| 29TH AUGUST 2012 © Copyright 2011 EMC Corporation. All rights reserved. 23
    • OnDemand: TCO AnalysisModel OverviewParametersOn-PremiseOnDemandSavings© Copyright 2011 EMC Corporation. All rights reserved. 24
    • OnDemand: TCO Analysis Named Users 2,000 Concurrent Users 200 Availability 99.90%Model Overview Backup & DR StandardParameters Support SLA’s StandardOn-Premise Storage 10 TBOnDemand Cash Rate (NPV) 10%Savings© Copyright 2011 EMC Corporation. All rights reserved. 25
    • OnDemand: TCO Analysis Cost Area Year 1 Hardware $105,880 Software $159,580 Application $519,267Model Overview SoftwareParameters Run Time $607,922 OperationsOn-Premise Facilities $88,655 Project Cost $325,700OnDemand OnDemand Fee -Savings Total $1,807,003© Copyright 2011 EMC Corporation. All rights reserved. 26
    • What can be impacted by OnDemand?© Copyright 2011 EMC Corporation. All rights reserved. 27
    • OnDemand: TCO Analysis Cost Area Year 1 Hardware - Software - Application $519,267Model Overview SoftwareParameters Run Time $109,764 OperationsOn-Premise Facilities - Project Cost $217,134OnDemand OnDemand Fee $400,000Savings Total $726,897© Copyright 2011 EMC Corporation. All rights reserved. 28
    • OnDemand: TCO Analysis Cost 5 4 3Model Overview 2 1Parameters 0On-Premise OnDemand On-Premise NPV OnDemand ($2,148,338)OnDemand NPV On-Premise ($4,280,659)Savings Savings 49.81% (Annualised)© Copyright 2011 EMC Corporation. All rights reserved. 29
    • ROADMAP© Copyright 2011 EMC Corporation. All rights reserved. 30
    • Roadmap Today 2012 / 2013 IN THE CLOUD ON-PREMISE PARTNER SOLUTIONS PARTNER HOSTED PLATFORM VCUBE VCUBE VCUBE VCUBE APPLICATIONS Captiva Document Sciences Documentum 7 xCP 1.6 Records Manager xCP 2.0 Documentum Webtop / D2 SAP Archiving EPFM© Copyright 2011 EMC Corporation. All rights reserved. 31
    • SUMMARY© Copyright 2011 EMC Corporation. All rights reserved. 32
    • Value Delivered with OnDemand SAVE SIMPLIFY TRANSFORM • No capital • Instant–on • Rapidly create outlay or cloud service new offerings hardware • Expert • Increase maintenance implementation competitiveness • Expense assistance predictability and elasticity© Copyright 2011 EMC Corporation. All rights reserved. 33
    • THANK YOU
    • Defining the EMC OnDemand Service EMC OnDemand© Copyright 2011 EMC Corporation. All rights reserved. 36