Using Public Participation to Ensure Mobility and Safety for the Urban Vulnerable in Liaoning, China

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    1 Favorite

    Using Public Participation to Ensure Mobility and Safety for the Urban Vulnerable in Liaoning, China - Presentation Transcript

    1. Public Consultation for Better Project Design -Using public participation to ensure mobility and safety for the urban vulnerable in Loaning, China Wenling Chen, Jan 2009, Washington D.C.
    2. World Bank Urban Transport Projects in China 公交优先 城市扩张 市民参与、弱势人群的需求 交通管理 总体规划 规划管理能力建设
    3. Six Medium Cities return Jinzhou: Port City Pop: 0.77 million 2004 GDP: Y33.7 b ($4b) Panjin: Petrolic Industry City Pop: 1.2 million 2004 GDP: Y36.9 b ($4.5b) Dengta Liaoyang: Historical, Petrolic City Pop: 1.82 million 2004 GDP: Y29 b ($3.5b) Dengta: A part of Liaoyang Pop: .50 million Fushun: Coal Industrial City Pop: 1.3 million 04GDP: Y37.5b Six Medium Size Cities Benxi: Pop: 1.57m. 04GDP:Y29b
    4. Liaoning Medium Cities Project
      • US$525m, US$218m WB Loan,
      • Launched in the end of 2006
      • Road development, traffic management & public transport improvement, and TAs
      • People-centered transport development
        • Public participation in planning process
        • Secondary road system improvements
        • Implementing road safety law
    5. Public Participation – to Improve Project Design
      • Public Participation in China
        • Bank funded PP: Wuhan Urban Project, 2004
        • 1999 Liaoning Urban Transport Project 1999
        • Vulnerable often an afterthought, participatory process high value
      • Liaoning PP: One of the first in China that received funding from the government
    6. Public Participation – to Improve Project Design
      • Objectives
        • Determine public key concerns
        • Prioritize problems
        • Incorporate public input into project design
      • Project team
        • Liaoning Academy of Social Science (LASS)
        • Public Participation Advisor: China Agricultural University
        • Provincial Project Office – Liaoning Urban Construction & Renewal Project Office (LUCRPO)
        • Project cities
        • WB team
    7. Public Participation Process During implementation Dec 2005 – Feb 2006 June — Sep. 2005 WB LUCRPO Phase I : PP for Planning and Design Open meeting FGD / II Questionnaire Phase II : PP for Project Appraisal Open meeting FGD / II Questionnaire Open meeting FGD / II Questionnaire Phase III : PP for M & E PPF team LURCD FS FS PP: public participation FGD: focus group discussion II: individual interview
    8. Public Participation Process
      • Three phases
        • Phase I (Design stage) – Identify issues
        • Phase II (Appraisal stage) – Solutions to issues open for public comments
        • Phase III (Implementation stage) – Assess public satisfaction mid-term & end of implementation
      • Over 5 years
      • Estimated budget: $400k-500k
      • Phase I finished in Sep 2005, phase II completed in April 2006
    9. Participants Recruitment
      • Implemented by independent agency LASS
      • Recruitment plan
      • Gender separated groups to enhance female involvement
      As appropriate 15 mixed Seniors As appropriate 15 mixed Migrants Individual interview 5-10 mixed Disabled Must 10-10 M / F Poor people Vulnerability- driven groups 15 mixed Three-wheeled vehicle drivers Choose either one 15 mixed Bus drivers 10-10 M / F Bicycle users Choose either one 10-10 M / F Walkers / bus users Mode-driven group Note Number of participants Gender Focus groups Sorting
    10. Design (Phase I) and Appraisal Stage (Phase II) PP Activities
    11. Mode shares Dongxin Rd N., Liaoyang Hankou Rail Crossing, Jinzhou Xueyuan Rd, Jinzhou Panjin Urban Road
    12. Trip Purposes Zhaolin Rail Underpass, Dengta Wuwangzi Interchange, Liaoyang Guangming, Wenhua Intersection, Dengta
    13. Key Mobility and Safety Issues Identified through Phase I PP
      • Poor secondary road pavement and drainage conditions
        • Jiancai Road , Beishao Zhongxin Interchange (Liaoyang), Xueyuan Road Vicinity (Jinzhou), Zhanqian Street (Dengta)
      • Poor sidewalk conditions and road facilities
        • Xueyuan Road Vicinity (Jinzhou), Jinzhou Urban Road , Fushun Secondary Road , Fushun Sidewalk , Dengta Sidewalk .
      • Lack of separation between MV and NMV traffic
        • Wuwangzi Street (Liaoyang), 6 Dao St (Liaoyang), Hankou Rail Overpass (Jinzhou),
      • Lack of street lighting and signage
        • Xinyun Road (Liaoyang)
      • Gender differences identified in needs associated with safety and security
    14. Key Mobility and Safety Issues Identified (cont.)
      • Poor secondary road pavement and drainage conditions
      • Poor sidewalk conditions and road facilities
      • Lack of separation between MV and NMV
      • Poor Traffic Management
    15. Poor secondary road pavement and drainage conditions
      • “ 灯塔:一位腿部瘫痪的女性居民:“我的腿坏了多年,一直靠轮椅出行,最让我犯愁的就是道路的坑洼不平,有人在身边还好点,一次自己出门,没走多远轮椅就陷到坑里了人还差点掉下来旁人费了很大力气才把我拉出来,从那以后再不敢自己出来。” A disable female: I travel by wheelchair, my greatest concerns is the roughness of roads… my wheelchair often got stuck in the road cracks…. Now I feel reluctant to go out alone.
      • “ 灯塔一位老年男性居民说:“为了省钱,没有特殊的事儿,我多远都走着去,走时间长了挺累的,可功夫(时间)磨呗。要是碰到下雨、下雪,走道儿可费劲了,天不好我轻易不出门。” A senior male: in order to save money, I walk wherever I go in the city… it’s really difficult to walk when it rains or snows… eventually, I don’t normally go out unless it’s absolutely necessary.
      • “ 案例:市民陆某,男, 51 岁,工人。他抱怨道路上没有排水系统,下大雨时,马路成大河;下小雨,处处是积水。” Mr. Lu, 51 yr old: there’s no drainage system on the road, when it rains hard, the roads become rivers, when it rains mildly, water is pooled everywhere.
      return
    16. Poor sidewalk conditions and road facilities
      • “ 刘女士, 65 岁,住在高山路附近,是居住在这一地区的老居民。出于保持身体健康的考虑,她很愿意在闲暇时间出外散步。但是由于这条道路目前的建设标准很低,道路养护情况很差,特别是没有人行道,使得她不太敢出门。她认为,在未来的新建设的道路应当留有人行道,保证行人的安全和出行方便,这最主要的。” Ms. Liu, 65: I would love to take a walk whenever possible, however, because the road condition is so bad, especially with no sidewalks, i don’t dare to go out…I think future plan should definitely include sidewalks
      • “ 抚顺:董某,出行方式主要是步行,出行目的主要是去工作,家住高山路附近,每天上班都要走高山路,但是高山路两边基本没有人行道,而且道路也坑坑洼洼的,步行者特别不方便,尤其是下雨天的时候,更是泥泞难行,因此董女士特别希望能早日修好这条路,这样自己出行就方便多了。” Ms. Dong, main mode of travel: walk: I walk everyday along Gaoshan Road to work. There’s literally no sidewalks there, besides the road pavement is rough, it’s very difficult to walk, especially when it rains…
      return
    17. Lack of separation between MV and NMV traffic
      • “ 抚顺:王某,出行方式主要是自驾自行车,偶尔乘坐公交车,王先生说,他自己骑自行车上班的时候非常担心自己的安全,因为经常有机动车驶入自行车道里,而且车速还经常特别快。因此,王先生希望交通部门能加强管理,做到自行车道和机动车道严格分离开,这样才能更好的保证骑自行车者的安全。” Mr. Wang, bike to work, use bus once in a while: when bike to work, I concerns very much on my safety, because mvs often drive on bike lanes and often with high speeds. ….
      • “ 灯塔:一位以骑自行车为主的居民说:“自行车道挺少的,也挺窄,也没人管,走道的、骑车的、开车的都在道上过,感觉挺危险的。” … there’re very few bicycle lanes in the city. They are very narrow, without proper management, pedestrians, bicyclist, and motor drivers all use bike lanes. It’s quite dangerous…
      • 灯塔: 市民张某,难, 52 岁。每天起自行车上下班,穿过市中心,他说在市中心没有机动车与非机动车道的划分,行人与各式各样的车都拥挤在一条路面不平且狭窄的道路上,常堵车。在上下班高峰期时,时有碰撞,很危险,他为此多次与人发生口角。” Mr. Zhang, 52: I bike to and from work daily through downtown, where there’s no mv/nmv separation. Pedestrians share narrow and rough roads with all kinds of vehicles…. It’s very dangerous
      return
    18. Poor Traffic Management
      • “ 案例:市民彭某,女, 39 岁,工人。她说城市的过街横道必须保证安全。有时候,有些机动车辆的驾驶员看到行人过街时也不减速,特别是小孩过横街就很危险,我的孩子就差点被车撞倒,到现在我都心有余悸。所以我认为城市人行横道改进要有明确的标志(红绿灯、斑马线等),但距离不要过长,以免引起交通事故。” Ms. Peng, 39: it’s quite often for mv drivers to cross intersection with high speed. My kid was once almost hit by a car. I’m still frightened thinking of that occasion ….
      • “ 灯塔:一位年长的女性居民:“我家到菜市场要过一条马路,横过马路的时候很小心,马路上车挺多的,而且有时候还有不少年轻人摩托车开的飞快,一碰到这种情况提心吊胆的。” A senior female: i walk to daily grocery, it’s sometime scary enough for me to hold the breath when I cross the road… the traffic is heavy and fast… motorists are often speeding.
      • “ 个案 23 :一位以开摩托车为主的居民说:“在路上开车,没有红绿灯,十字路口的地方最乱,往哪边走的都有,有好几回我都差点跟走道的撞上。” A resident who commute by motorcycle: there’re no traffic lights on many. intersections are chaotic, traffics are in every directions…
    19. Lack of Street Light
      • “ 个案 14 :年轻职业女性:“工作原因我经常会加班到很晚,回家时总有些提心吊胆的,因为到家的路上有一段很黑,有几个路灯年久失修也不亮了,虽然这种情况下丈夫总是尽量去接我,但还是有几次自己回的家,感觉真的挺害怕的。” “ A young female professional: I often get off from work late, when I go home, I’m so frightened by the darkness along some roads. Some lights are broken for very long time and nobody fixes them. My husband walks me home whenever possible… but there are times I walk home alone and I felt terrified”
      • “ 案例 1 :金某,女,退休工人,她说一些街路没有路灯,抢劫事件经常发生,治安不好,以至于单身女子不敢在天黑以后独自出行。”“ Ms. Jin, retired worker: There’re no lights on some streets. Robbery happens frequently there. I wouldn’t dare to walk alone when it’s turning dark”
      • “ 案例:石会敏,女, 43 岁,环卫工人,家住在盘锦市兴隆台区八里社区,去上班都是骑自行车。她说,如果晚上回家比较晚时感觉非常不安全,因为从庄林路到泰山路这段路到晚上非常黑,有路灯但是不亮,不知道是什么原因。” “ Ms. Shi, 43: Environmental Protection Worker: I bike to and from work, I don’t feel safe biking home when it’s a little late. ….it’s extremely dark in some sections, there’re lights, but they don’t work, I don’t know why…”
    20. Address Phase I PP Raised Issues
      • Final feasibility includes :
        • Summary of issues raised
        • Issues to be addressed in design
        • Issues not to be addressed, and reason
    21. Phase I PP Outcomes
      • Informed decisionmakers on citizens’ priority & needs
      • Project design –emphases shifted to:
        • Secondary road improvements
        • Traffic management, especially MV/NMV traffic separation
        • Much greater attention to sidewalks and pedestrian’s needs
      • Latent issues were picked up to take care of the urban vulnerable
        • Street lights
        • Public transport
    22. Appraisal Stage (Phase II) PP: Focuses and Outcomes
      • Focused on assessing:
        • How well project design addressed Phase I raised concerns
        • Remaining and newly identified issues
        • Expected implementation concerns
      • Address Appraisal Phase PP Identified Issues
        • LASS developed actionable recommendations (location specific) to each city
        • Cities agreed to develop action plans incorporating the recommendations
        • Phase III to assess the implementation and outcomes of the action plans
    23. Implementation Stage (Phase III) PP
      • Monitor the status of action plans and ensure raised issues are addressed
      • Assess public satisfaction with completed roads and facilities through stakeholder field testing, and continued dialogues
    24. Lessons Learned
      • Structured public participation process
        • Low effort
        • Raises sensitivity of project design to the mobility and safety needs and issues related to the disadvantaged
      • Provides platform for addressing particular vulnerable groups at low incremental effort
        • Gender issues
        • Disabled community
      • Government buy-in from the ability to increase public welfare with low-cost measures
        • Street lights, toilets, trees and benches go a long way
      • Make it work & make champions
    25. Thank you! [email_address]

    + EMBARQ NetworkEMBARQ Network, 10 months ago

    custom

    426 views, 1 favs, 1 embeds more stats

    By Wenling Chen, Policy and Planning Specialist, Vi more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 426
      • 407 on SlideShare
      • 19 from embeds
    • Comments 0
    • Favorites 1
    • Downloads 22
    Most viewed embeds
    • 19 views on http://www.embarq.org

    more

    All embeds
    • 19 views on http://www.embarq.org

    less

    Flagged as inappropriate Flag as inappropriate