System, Software & People Based Change Management - Planning and Delivery Framework
– Version 2.3
NLG - Business Change Toolkit – Low Complexity Project
Chg-Pln-V2.3 G:ChangeManagementWorkshops – 2016-2019
Next Level Group – Before you proceed. . .
Change Management Planning - Project Timing
Is N.O.W. the right time for this change project?
 No conflicting
business
priorities
 Organisational
Readiness
 Willingness and
Motivation
 No conflicting business priorities (all stakeholders)
 This is the most important project for the required
resources to be focused on – This is the highest priority
(necessary & valuable) change we can make!
 Organisational Readiness
 We have the required internal and external capacity
(time) and capability (skills)– We are ready and able to
do this!
 Willingness and Motivation
 There is clearly defined benefit to motivate all
stakeholders – We want and need to do this!
Next Level Group –
Change Management Framework
Guidelines for assessing each element of the framework
 The following slides outline the broad elements of our
change management framework
 These elements need to be considered at all stages of
the change project (Preparation, Planning, Delivery,
Closure, Review & Continuous Improvement)
 Change must be sustained with ongoing monitoring,
review and continuous improvement after closure.
 As is relevant to each stage of the project, NLG
recommends the following frames be used to assess
individual utility of each element listed in this broad
framework
 Each element should be considered against the
criteria listed on the right 
 Preparation, Planning,
Delivery & Review Criteria
against Project Elements
 Relevance
 Importance
 Urgency
 Completion Status
 Preparedness (Capability)
 Preparedness (Capacity)
 Historical Performance &
Quality
Next Level Group –
Change Management Planning Framework
P.L.A.N. to be C.L.E.A.R
 Project Sponsors and
Champions
 Lists
 Actions
 Needs
to be
 Consult
 Listen
 Engage
 Act
 Respond
 Project Sponsors and Champions Engaged Early
 Lists (See Following Slide – Informs Change Planning)
 Actions (Plan and share Milestones and Actions in Gantt Form)
 Needs – Define needs for the business, clients, users, team
members & project or program.
to be
 Consult all stakeholders early and throughout
 Listen to and seek feedback, identify needs and impacts
 Engage by providing clear reasons, benefits & plans
 Act on feedback and needs promptly throughout
 Respond to and encourage enquiries, concerns & compliments
Next Level Group –
Change Management Plan –LISTS to develop
(Elements to be used to generate bullet-point lists for early planning stages)
 Revisit Vision, Mission,
Values, Purpose, Core
Business
 Champion & Sponsor Role
Requirements
 Key Benefits and Drivers
 Guiding Principles
 Project Team Members
 Success Criteria
 Marketing Messages and
Communications Plan
 Current and Future State
Description
 Related Projects /
Programs
 Solution Requirements,
Options & Migration
Impacts
 Change Risks and
Mitigations
 Stakeholder Impact
Assessment & Responses
 User base readiness
criteria
 Governance & Reporting
Requirements
 ROI & Costs/Benefits
 Quality Measures
 Training Requirements
 Capacity & Capability,
Maturity & Readiness
 Strategies, Tactics &
Actions & Results
 Scope, Timing &
Milestones
 Future proofing against
future needs & plans
 Priorities & Gaps
(Relevance/Importance
/Performance/Timing/
Urgency/Capability/
Capacity)
 Sustaining Change Plan -
Requirements
Next Level Group –
IT Specific Solution Implementation Framework
R.O.A.D.T.E.S.T.E.R.S
 Requirements
 Options
 Assemble
 Develop
 Test
 Evolve
 Secondary Test
 Train
 Evaluate
 Rollout
 Sustain
 Map Requirements from Current & Future State
 Options Matrix and Solution Comparisons
 Assemble the beta system with sample legacy data
 Develop & Customise including full data migration
 Test the system with a small group of mature users
 Further evolve system/approach from early adopter lessons
 Perform a secondary test – possibly larger user base
 Train the full user base in a staged approach if necessary
 Evaluate readiness of system, data, people & business
 Rollout the solution – Go Live.
 Sustain with ongoing review and continuous improvement
Next Level Group –
Change Management – (Low Complexity
Change) - Related Checklists & Templates
 Change Project
Discovery Template
 Change Management
Proposal / Plan
Template
 Communications Plan
Template
 Training Plan Template
 Readiness checklist
 Agreed Reporting Items
 Broad Project Task List

More Related Content

What's hot

What's hot (16)

Chap003
Chap003Chap003
Chap003
 
Pmi Met Sig Congress 2007 Presentation Dale Nott V1.00
Pmi Met Sig Congress 2007 Presentation Dale Nott V1.00Pmi Met Sig Congress 2007 Presentation Dale Nott V1.00
Pmi Met Sig Congress 2007 Presentation Dale Nott V1.00
 
Integrated solutions project management
Integrated solutions project managementIntegrated solutions project management
Integrated solutions project management
 
New Change Implementation
New Change ImplementationNew Change Implementation
New Change Implementation
 
DAS PM RESPONSIBILITIES
DAS PM RESPONSIBILITIESDAS PM RESPONSIBILITIES
DAS PM RESPONSIBILITIES
 
Chap004
Chap004Chap004
Chap004
 
01 Om At Training W Kshop Definition B
01 Om At Training W Kshop   Definition B01 Om At Training W Kshop   Definition B
01 Om At Training W Kshop Definition B
 
Chap002
Chap002Chap002
Chap002
 
Requirement Engineering
Requirement Engineering Requirement Engineering
Requirement Engineering
 
Software Testing Management
Software Testing ManagementSoftware Testing Management
Software Testing Management
 
Life Cycle Phases
Life Cycle PhasesLife Cycle Phases
Life Cycle Phases
 
Test Management
Test ManagementTest Management
Test Management
 
Project Management
Project ManagementProject Management
Project Management
 
Testing Management
Testing ManagementTesting Management
Testing Management
 
Chap014
Chap014Chap014
Chap014
 
gracetoramanian-resume 012517
gracetoramanian-resume 012517gracetoramanian-resume 012517
gracetoramanian-resume 012517
 

Similar to A Proven Process & Framework to Manage Your Change Project

Enterprise Content Management (ECM) System
Enterprise Content Management (ECM) SystemEnterprise Content Management (ECM) System
Enterprise Content Management (ECM) SystemAnand Subramaniam
 
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change TutorialSanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorialguesta83e9d
 
Project management
Project managementProject management
Project managementNitin KR
 
Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangeImplementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangePeter Quintana
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handoutsguest0981f4
 
LSS Intro
LSS IntroLSS Intro
LSS Introevansjr
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handoutsguest0981f4
 
ALM Assessment Program
ALM Assessment ProgramALM Assessment Program
ALM Assessment ProgramSteve Lange
 
PMO Proposal For Global Sales Operations
PMO Proposal For Global Sales OperationsPMO Proposal For Global Sales Operations
PMO Proposal For Global Sales Operationstonyhinojosa
 
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adbngocjos
 
Presentation - Rational Unified Process
Presentation - Rational Unified ProcessPresentation - Rational Unified Process
Presentation - Rational Unified ProcessSharad Srivastava
 
Downloads abc 2006 presentation downloads-ramesh_babu
Downloads abc 2006   presentation downloads-ramesh_babuDownloads abc 2006   presentation downloads-ramesh_babu
Downloads abc 2006 presentation downloads-ramesh_babuHem Rana
 
FINAL _ T52-Structures And Processes To Enable Ongoing, Sustainable Cost-Redu...
FINAL _ T52-Structures And Processes To Enable Ongoing, Sustainable Cost-Redu...FINAL _ T52-Structures And Processes To Enable Ongoing, Sustainable Cost-Redu...
FINAL _ T52-Structures And Processes To Enable Ongoing, Sustainable Cost-Redu...Bobby Olm-Shipman
 
Project Reviews 20100414 1 0
Project Reviews   20100414 1 0Project Reviews   20100414 1 0
Project Reviews 20100414 1 0Gavin Berry
 

Similar to A Proven Process & Framework to Manage Your Change Project (20)

Enterprise Content Management (ECM) System
Enterprise Content Management (ECM) SystemEnterprise Content Management (ECM) System
Enterprise Content Management (ECM) System
 
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change TutorialSanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
 
Project management
Project managementProject management
Project management
 
Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangeImplementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing Change
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
 
LSS Intro
LSS IntroLSS Intro
LSS Intro
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
 
ALM Assessment Program
ALM Assessment ProgramALM Assessment Program
ALM Assessment Program
 
Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)
 
OCM Overview
OCM OverviewOCM Overview
OCM Overview
 
PMO Proposal For Global Sales Operations
PMO Proposal For Global Sales OperationsPMO Proposal For Global Sales Operations
PMO Proposal For Global Sales Operations
 
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb
 
Presentation - Rational Unified Process
Presentation - Rational Unified ProcessPresentation - Rational Unified Process
Presentation - Rational Unified Process
 
Program Management
Program ManagementProgram Management
Program Management
 
Downloads abc 2006 presentation downloads-ramesh_babu
Downloads abc 2006   presentation downloads-ramesh_babuDownloads abc 2006   presentation downloads-ramesh_babu
Downloads abc 2006 presentation downloads-ramesh_babu
 
FINAL _ T52-Structures And Processes To Enable Ongoing, Sustainable Cost-Redu...
FINAL _ T52-Structures And Processes To Enable Ongoing, Sustainable Cost-Redu...FINAL _ T52-Structures And Processes To Enable Ongoing, Sustainable Cost-Redu...
FINAL _ T52-Structures And Processes To Enable Ongoing, Sustainable Cost-Redu...
 
Akil Edla
Akil EdlaAkil Edla
Akil Edla
 
Project Reviews 20100414 1 0
Project Reviews   20100414 1 0Project Reviews   20100414 1 0
Project Reviews 20100414 1 0
 
5_Steve Blash_AOP 2022 Blash Dual Roles_221031.pptx
5_Steve Blash_AOP 2022 Blash Dual Roles_221031.pptx5_Steve Blash_AOP 2022 Blash Dual Roles_221031.pptx
5_Steve Blash_AOP 2022 Blash Dual Roles_221031.pptx
 
Richard A Denman - Resume
Richard A Denman - ResumeRichard A Denman - Resume
Richard A Denman - Resume
 

Recently uploaded

PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 

Recently uploaded (20)

Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 

A Proven Process & Framework to Manage Your Change Project

  • 1. Next Level Group System, Software & People Based Change Management - Planning and Delivery Framework – Version 2.3 NLG - Business Change Toolkit – Low Complexity Project Chg-Pln-V2.3 G:ChangeManagementWorkshops – 2016-2019
  • 2. Next Level Group – Before you proceed. . . Change Management Planning - Project Timing Is N.O.W. the right time for this change project?  No conflicting business priorities  Organisational Readiness  Willingness and Motivation  No conflicting business priorities (all stakeholders)  This is the most important project for the required resources to be focused on – This is the highest priority (necessary & valuable) change we can make!  Organisational Readiness  We have the required internal and external capacity (time) and capability (skills)– We are ready and able to do this!  Willingness and Motivation  There is clearly defined benefit to motivate all stakeholders – We want and need to do this!
  • 3. Next Level Group – Change Management Framework Guidelines for assessing each element of the framework  The following slides outline the broad elements of our change management framework  These elements need to be considered at all stages of the change project (Preparation, Planning, Delivery, Closure, Review & Continuous Improvement)  Change must be sustained with ongoing monitoring, review and continuous improvement after closure.  As is relevant to each stage of the project, NLG recommends the following frames be used to assess individual utility of each element listed in this broad framework  Each element should be considered against the criteria listed on the right   Preparation, Planning, Delivery & Review Criteria against Project Elements  Relevance  Importance  Urgency  Completion Status  Preparedness (Capability)  Preparedness (Capacity)  Historical Performance & Quality
  • 4. Next Level Group – Change Management Planning Framework P.L.A.N. to be C.L.E.A.R  Project Sponsors and Champions  Lists  Actions  Needs to be  Consult  Listen  Engage  Act  Respond  Project Sponsors and Champions Engaged Early  Lists (See Following Slide – Informs Change Planning)  Actions (Plan and share Milestones and Actions in Gantt Form)  Needs – Define needs for the business, clients, users, team members & project or program. to be  Consult all stakeholders early and throughout  Listen to and seek feedback, identify needs and impacts  Engage by providing clear reasons, benefits & plans  Act on feedback and needs promptly throughout  Respond to and encourage enquiries, concerns & compliments
  • 5. Next Level Group – Change Management Plan –LISTS to develop (Elements to be used to generate bullet-point lists for early planning stages)  Revisit Vision, Mission, Values, Purpose, Core Business  Champion & Sponsor Role Requirements  Key Benefits and Drivers  Guiding Principles  Project Team Members  Success Criteria  Marketing Messages and Communications Plan  Current and Future State Description  Related Projects / Programs  Solution Requirements, Options & Migration Impacts  Change Risks and Mitigations  Stakeholder Impact Assessment & Responses  User base readiness criteria  Governance & Reporting Requirements  ROI & Costs/Benefits  Quality Measures  Training Requirements  Capacity & Capability, Maturity & Readiness  Strategies, Tactics & Actions & Results  Scope, Timing & Milestones  Future proofing against future needs & plans  Priorities & Gaps (Relevance/Importance /Performance/Timing/ Urgency/Capability/ Capacity)  Sustaining Change Plan - Requirements
  • 6. Next Level Group – IT Specific Solution Implementation Framework R.O.A.D.T.E.S.T.E.R.S  Requirements  Options  Assemble  Develop  Test  Evolve  Secondary Test  Train  Evaluate  Rollout  Sustain  Map Requirements from Current & Future State  Options Matrix and Solution Comparisons  Assemble the beta system with sample legacy data  Develop & Customise including full data migration  Test the system with a small group of mature users  Further evolve system/approach from early adopter lessons  Perform a secondary test – possibly larger user base  Train the full user base in a staged approach if necessary  Evaluate readiness of system, data, people & business  Rollout the solution – Go Live.  Sustain with ongoing review and continuous improvement
  • 7. Next Level Group – Change Management – (Low Complexity Change) - Related Checklists & Templates  Change Project Discovery Template  Change Management Proposal / Plan Template  Communications Plan Template  Training Plan Template  Readiness checklist  Agreed Reporting Items  Broad Project Task List