Your SlideShare is downloading. ×
Final project schedule 1st may 2013
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Final project schedule 1st may 2013

35

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
35
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Salford City CollegeEccles Sixth Form CentreBTec Level 3Extended Diploma in Creative Media ProductionGames DesignFinal Major ProjectScheduleReview date: 24.04.13Monday Tuesday Wednesday Thursday Friday Saturday Sundayw/b 04.02.13 Task 1 - FMP LaunchMeetingw/b 11.02.13 Half-Termw/b 18.02.13 Book meeting slotwith project manager.Research into cellanimationsResearch into popularkid’s showsContinue Research Continue Research Finish up all ResearchtasksReview Schedule andProduction Logw/b 25.02.13 Start Story planning Tweak Story planning Do storyboard Continue Storyboard Continue Storyboard Review Schedule andProduction Logw/b 04.03.13 Finish Storyboard (DoPitch)Research popularshows from surveyContinue researchfrom surveyContinue researchfrom surveyReview Schedule andProduction Logw/b 11.03.13 Finish research Do Risk Assessment Do preproduction Prepare forproductionReview Schedule andProduction Logw/b 18.03.13 Think about what touse to produce FMPFinish pre-production Review Schedule andProduction Log25.03.13 Easter Review Schedule andProduction Log01.04.13 Easter Do Backgrounds inSketchbookContinue Backgrounds Continue Backgrounds Finish Backgrounds Review Schedule andProduction Logw/b 08.04.13 Start work on Flash(Backgrounds)Continue Work onFlash (Backgrounds)Continue Work onFlash (Backgrounds)Continue Work onFlash (Backgrounds)Review Schedule andProduction Logw/b 15.04.13 Continue Work onFlash (Backgrounds)Continue Work onFlashContinue Work onFlashContinue Work onFlashReview Schedule andProduction Logw/b 22.04.13 Continue Work onFlashContinue Work onFlashContinue Work onFlashContinue Work onFlashReview Schedule andProduction Logw/b 29.04.13 Continue Work onFlashContinue Work onFlashContinue Work onFlashContinue Work onFlashReview Schedule andProduction Logw/b 06.05.13 Continue Work onFlashContinue Work onFlashFinish Flash, Convertboth movies into one.Do Evaluation Review Schedule andProduction Logw/b 13.05.13 Spare Day Spare Day Spare Day Spare Day Review Schedule andProduction Logw/b 20.05.13 Task 8: Evaluation DEADLINE
  • 2. should take place nolater than thebeginning of thisweek.

×