Your SlideShare is downloading. ×
Gateshead dhruv
Gateshead dhruv
Gateshead dhruv
Gateshead dhruv
Gateshead dhruv
Gateshead dhruv
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Gateshead dhruv

237

Published on

Published in: Technology, Travel
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
237
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
9
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Wilkinson Eyre Architects Gifford and Partners (Structural engineer) CATEGORY : ROTATING CABLE-STAYED STEEL-ARCH BRIDGE Gateshead Millennium Bridge (Baltic Millennium Bridge) WORLD’S FIRST ROTATING BRIDGE Newcastle Gateshead RIVER TYNEDHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_INTRO
  • 2. DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_INTRO
  • 3. HYDRAULIC POWERED BY ACTUATORS 8 ELECTRIC MOTORS CROSS SECTION THROUGH END SUPPORT, SHOWING LOCATIN OF 450 MM DIA OPENING RAMS CROSS SECTION OF CURVED PEDESTRIAN AND CYCLE DECK, SHOWING STEEL BENCH 18 45 M HIGH 4 min/OPENING Rs 300/OPENING 30 m deep foundationunsorted glacial sediment LONGITUDINAL SECTION OF THE BRIDGE SHOWING UNDERLYING FISSURED COAL MEASURESDHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_SCHEMATIC
  • 4. PARKING AT THE SIDES PARKING AT THE SIDES The concept of the rotating bridge was a reaction to three main design constraints: 1. The bridge should be 4.5m above the spring high tides in its closed position. 2. Nothing was to be built on the Gateshead quayside. 3. The deck should have a maximum slope of 1:20 to allow for disabled access.DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_CONSTRUCTION
  • 5. STRESS LEVELS AT DIFFERENT PARTS OF THE PARABOLADHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_FABRICATION
  • 6. DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_STRUCTURAL INFO

×