advantages and disadvantages
rubble mound monolithic
• simple construction
• withstand unequal settleme...
February 1, 2012 3
Quarry stone or concrete ??
February 1, 2012 4
which design formula ???
 
3
33
cos sin
rN gH
W

  

 
3
3
cot
r
D
g H
W
K




0.2
0.18 0....
February 1, 2012 5
SLS and ULS
February 1, 2012 6
Closure dams: special conditions
• subdivision of the basin in order to reduce storage
area
• subdivisi...
February 1, 2012 7
two ways to reduce the area of a
basin
February 1, 2012 8
a basin with two entrances
February 1, 2012 9
an estuary with two channels
February 1, 2012 10
The gap is not (yet) in equilibrium
• stabilise the bottom of the
gap as soon as possible
• avoid eros...
February 1, 2012 11
closure dike breach Ouderkerk aan
den IJssel (1953)
February 1, 2012 12
closure alignments
Upcoming SlideShare
Loading in...5
×

Ct530817

285

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
285
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
8
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Ct530817

  1. 1. Vermelding onderdeel organisatie February 1, 2012 1 Chapter 17: Review ct5308 Breakwaters and Closure Dams H.J. Verhagen Faculty of Civil Engineering and Geosciences Section Hydraulic Engineering Emergency closure at Westkapelle 1944 (photo: National Geographic
  2. 2. February 1, 2012 2 advantages and disadvantages rubble mound monolithic • simple construction • withstand unequal settlement • large ratio between initial damage and collapse • many guidelines available • dependence on the availability of adequate quarry • large quantity of material required in deep water • large space required • difficult to use as quay wall • short construction time on location • can function as quay wall • economical use of material in deeper water • sensitivity to poor foundation conditions • uncertainty about wave loads in breaking waves • complete and sudden failure when overloaded • reflection against vertical wall • limited support for the designer from guidelines and literature
  3. 3. February 1, 2012 3 Quarry stone or concrete ??
  4. 4. February 1, 2012 4 which design formula ???   3 33 cos sin rN gH W        3 3 cot r D g H W K     0.2 0.18 0.5 50 0.2 0.13 50 6.2 (plunging breakers) 1.0 cot (surging breakers) sc n Psc n H S P d N H S P d N                   
  5. 5. February 1, 2012 5 SLS and ULS
  6. 6. February 1, 2012 6 Closure dams: special conditions • subdivision of the basin in order to reduce storage area • subdivision because of two entrances • a closure with two or more entrances
  7. 7. February 1, 2012 7 two ways to reduce the area of a basin
  8. 8. February 1, 2012 8 a basin with two entrances
  9. 9. February 1, 2012 9 an estuary with two channels
  10. 10. February 1, 2012 10 The gap is not (yet) in equilibrium • stabilise the bottom of the gap as soon as possible • avoid erosion of gullies in the storage area
  11. 11. February 1, 2012 11 closure dike breach Ouderkerk aan den IJssel (1953)
  12. 12. February 1, 2012 12 closure alignments
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×