Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Breakwaters and closure dams case study
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Breakwaters and closure dams case study

484

Published on

Published in: Education, Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
484
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
30
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Case study Seamangeumct5308 Breakwaters and Closure Dams Closure of dike # 4H.J. VerhagenApril 12, 2012 1Faculty of Civil Engineering and GeosciencesVermelding onderdeel organisatieSection Hydraulic Engineering
  • 2. locationApril 12, 2012 2
  • 3. Overview of the estuary 33 km of seadike 282.5 km2 reclamation 117.6 km2 reservoir 10 kmApril 12, 2012 3
  • 4. WaterlevelsApril 12, 2012 4
  • 5. currentsApril 12, 2012 5
  • 6. Flow pattern with three gapsApril 12, 2012 6
  • 7. Overall current pattern floodApril 12, 2012 7
  • 8. Max ebb velocities in gap 2 800 m 500 m 200 m 100 m 50 mApril 12, 2012 8
  • 9. April 12, 2012 9
  • 10. discharge sluicesApril 12, 2012 10
  • 11. discharge sluicesApril 12, 2012 11
  • 12. 1. 현장조사 개요 Site No. 1 Site No. 2 Site No. 3(STA No. 68) April 12, 2012 12 Vermelding onderdeel organisatie
  • 13. 11 7 4 -3 sill -5.5 -5April 12, 2012 13
  • 14. 해내측 조위 실시간 측정 시추조사 및 유공관 삽입April 12, 2012 14
  • 15. 유공관 내 수위변화 수동계측(수 위계)유공관 내 수위변화 자동계측(간극 수압계) April 12, 2012 15
  • 16. Bed protectionApril 12, 2012 16
  • 17. Cross section gap 2April 12, 2012 17
  • 18. Depth contours April 12, 2012 18
  • 19. Seamangeum dike nr. 1April 12, 2012 19
  • 20. Saemangeum closure of dike #4April 12, 2012 20
  • 21. Semangeum closure of dike # 4April 12, 2012 21
  • 22. Seamangeum closure of dike # 4April 12, 2012 22
  • 23. Final closure damApril 12, 2012 23
  • 24. Just before closureApril 12, 2012 24
  • 25. Hwaong closureApril 12, 2012 25
  • 26. Hwaong closureApril 12, 2012 26
  • 27. Hwaong closure dam and sluicesApril 12, 2012 27
  • 28. Closure of Sihwa damApril 12, 2012 28
  • 29. Closure of Sihwa damApril 12, 2012 29
  • 30. other closuresApril 12, 2012 30

×