• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Pert chart execution for REC
 

Pert chart execution for REC

on

  • 437 views

The given presentation gives what is needed to be done for Solar power projects under REC mechanism, India. REC mechanism in India, is the renewable energy certificate mechanism.

The given presentation gives what is needed to be done for Solar power projects under REC mechanism, India. REC mechanism in India, is the renewable energy certificate mechanism.

Statistics

Views

Total Views
437
Views on SlideShare
419
Embed Views
18

Actions

Likes
0
Downloads
10
Comments
0

2 Embeds 18

http://deesolar.wordpress.com 13
http://www.slashdocs.com 5

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Pert chart execution for REC Pert chart execution for REC Presentation Transcript

    • REC Mechanism ----Execution Details
    • REC MechanismRenewable Energy Certificate (REC) mechanism is a market based instrument to promoterenewable energy and facilitate compliance of renewable purchase obligations (RPO). It is aimedat addressing the mismatch between availability of RE resources in state and the requirement ofthe obligated entities to meet the renewable purchase obligation (RPO). Sale of Electricity Revenue Sale of REC CertificateRevenue for a RE generator under REC scheme includes revenue from the sale of electricitycomponent of RE generation and the revenue from the sale of environmental attributes in theform of RECs.
    • Financials REC Per MW Optimistic Conservative Radically Pessimistic Cost of Project Rs 9.5 crores Rs 10 crores Rs 10.5 crores Expected Generation 17.5 lac units 16.5 Lac units 16 Lac units Power Tariff Sale Rs 4 per unit Rs 2.7 per unit Rs 2.7 per unit Tariff Escallation 5% 3% 3% Max possible tariff Rs 8 Rs 7 Rs 6 Price of REC for 5 years Rs 11.5/unit Rs 9.3 /unit Rs 9.3 / unitPrice of REC after 5 years RS 6/unit Rs 4.0/unit Zero Exim financing 50% of Cost No No Interest rate (Exim) 10% NA NA Interest rate (domestic) 12.50% 13% 14% Tenor for Exim 15 years NA NA Tenor for domestic 12 years 12 years 12 yearsAccelerated depreciation Yes YES Yes Equity IRR 90% 40% 16%
    • Execution Plan 0 1 2 3 4 5 6 MOU Reg for project 30 daysAccreditation 42 daysRegistration 42 days IssuanceOpen Access Documentation with Electricity DeptComissioning Setting up of the project
    • Process of Accreditation Verification prior 2 to accreditationELIGIBLE 1 3b Entity Application to accreditation STATE AGENCY Intimation to accreditation SLDC - RVPN Confirmation to 3a accreditation Intimation to accreditation 3c NLDC – Central agency
    • Accreditation 0 7 14 21 28 35 42 Submission Check 5 days Re Submit 7 days Processiong 30 Days Certificate
    • Accreditation Format 1.1 Sec A Owner Details Sec B Operator Details Sec C RE Generating Station Details Sec D Connectivity Details with Concerned Licensee (STU/Discom) Sec E Metering Details Sec F Statutory Clearance Details Sec G General Details Sec H Details of Fee & Charges Section I : Declaration Format 1.2 CERTIFICATE OF ACCREDIATION
    • Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
    • Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
    • Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
    • Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
    • Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
    • Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
    • Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
    • Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
    • Process of Registration ELIGIBLE Entity SLDC - RVPN STATE AGENCY 3c Intimation of 3a Intimation of 3b Registration RegistrationConfirmation to Registration 1 Application for NLDC – Registration Central agency 3d POWER 2 Verification for Intimation of EXCHANGE registration Registration
    • Registration 0 7 14 21 28 35 42 Submission Check 2 incomplete 7 work day Processing 15 days Certificate Fees Submit 15 days
    • Registration Format 2.1 Application for Registration of RE Generating as Eligible Entity Sec A Owner Details Sec B RE Generating Station Details Sec C Copy of Certificate of Accreditation from State Agency Sec D Commissioning Schedule Sec E Details of Fee & Charges Sec F Declaration Section I : Declaration Format 2.2 CERTIFICATE OF REGISTRATION
    • Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
    • Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
    • Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
    • Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
    • Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
    • Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
    • Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
    • Process of Open AccessNLDC RRECPower Ex Urja Bhawan
    • Open Access 0 10 20 30 40 50 60 MOU Submission incomplete 10 day Processing 30 days System Study 30 days System stren ???
    • Open Access Form I APPLICATION FOR SCHEDULING Form II CONCURENCE FROM SLDC Form III REQUEST/CONCURRENCE FROM RLDC Form IV CONGESTION INFORMATION (ADVANCE SCHEDULING) Form V REQUEST FOR REVISION OF SCHEDULE DUE TO CONGESTION Form VI ACCEPTANCE FOR SCHEDULING Form VII DETAILS OF PAYMENT Form VIII REGISTRATION FORM
    • Commissioning
    • Process of Issuance Intimation to IssuanceSTATE AGENCY 5b 2 Verification prior to Issuance 3 Regular Injection Report NLDC – Central agencySLDC - RVPN Intimation of Meter Reading Issuance of REC 1 5a 4c 4b Application for Issuance Distribution Licensee 4a ELIGIBLE Entity
    • Issuance 0 7 14 21 28 35 42 Submit Check 2 Incomplete 5 days Processiong 15 days Certificate
    • Issuance Format 3.1 Sec A Energy Injection Report Sec B Registration Certificate (To ascertain validity) Sec C Details of Fee & Charges Sec D Compliance Auditor Report (if applicable) Format 3.2 CERTIFICATE OF ISSUANCE
    • Issuance Format 3.1 Sec A Sec B Sec C Sec D Format 3.2
    • Issuance Format 3.1 Sec A Sec B Sec C Sec D Format 3.2
    • Issuance Format 3.1 Sec A Sec B Sec C Sec D Format 3.2
    • Issuance Format 3.1 Sec A Sec B Sec C Sec D Format 3.2
    • Issuance Format 3.1 Sec A Sec B Sec C Sec D Format 3.2
    • Application Execution time Forms
    • Application Execution time I Company Details Forms II Proposed Power ProjectIII Details of Proposed Power ProjectIV Electrical Details V Financial DetailsVI Any Other relevant informationVII DeclarationVIII Documents enclosed – As applicable
    • Application Execution time I Company Details Forms II Proposed Power ProjectIII Details of Proposed Power ProjectIV Electrical Details V Financial DetailsVI Any Other relevant informationVII DeclarationVIII Documents enclosed – As applicable
    • Services OfferedConceptualization Execution Project Monitoring Feasibility Study Land Identification MonitoringRebates and Incentives Design Maintenance Quality Procure Funding Install Testing and Certification Providing Engineering Excellence in every Step
    • Scope of Work Incorporating Renewable Incentives and Policy changes to get maximum outBusiness Model of the Business Model Forming JV for FI’s and facilitating tie ups with Indian Companies.Investor Overcoming legal hurdles to ease Investments in India Consulting about best technology for Solar projects, based on the locationTechnical and the cost. Pre Bid and Post Bid Consultancy for lucrative but competitive for SolarProposals tenders in IndiaFinance Arranging Funds and Optimizing it to get maximum returns on Equity Making strategic tie-ups for Foreign companies looking for Solar BusinessTie ups Opportunity in India
    • Thank You for your time…Contact us:-Shop no 7, Murlipura RoadJaipur, RajasthanMob no :- +91 – 8829 003 003Email :- DeeSolarIndia@gmail.com
    • NLDC RRECPower Ex Urja Bhawan