Aquired structure prep

  • 195 views
Uploaded on

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
195
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
2
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. ACQUIRED STRUCTURE PREPARATION
  • 2. TERMINAL PERFORMANCE OBJECTIVE The student, working as a member of a team, shall conduct a pre-fire survey of a structure and prepare it for use in live fire training evolutions, so that the structure is rendered safe for use.
  • 3. ENABLING OBJECTIVES
    • Identify and describe all permits required for use in training in an acquired structure.
    • Describe and demonstrate pre-burn planning procedures for an acquired structure.
    • Describe and demonstrate proper procedures for making an acquired structure and the surrounding area safe for training.
  • 4. PERMITS & NOTIFICATIONS
    • Written documentation from owner:
      • Permission to burn structure
      • Clear title
      • Certificate of insurance cancellation
      • Acknowledgement of post-burn property condition
    • Local burn permit
    • Permission to use fire hydrants
  • 5. PERMITS & NOTIFICATIONS
    • Dispatchers
    • Law Enforcement Agencies
    • Neighbors
    • EPD
  • 6. LIABILITY INSURANCE Your department may want to obtain liability insurance to cover damage to other property.
  • 7. PRE-BURN PLANNING
  • 8. PRE-BURN PLAN
    • Site plan drawing
    • Building plan
    • Floor plan
    • CP location
    • Apparatus positions
    • Hose line positions
    • Emergency escape routes
    • Emergency evacuation assembly area
    • Ingress/egress routes for emergency vehicles
  • 9. PRE-BURN PLANNING
    • Determine water supply requirements
    • Obtain apparatus
    • Establish separate water sources
    • Obtain weather reports
    • Designate & mark parking areas
    • Establish operations area & mark perimeter
    • Establish communications
  • 10. RENDERING SITE SAFE
    • Inspect building for structural integrity
    • Ensure utilities disconnected
    • Remove wall, ceiling & floor coverings
    • Patch holes in walls & ceilings
    • Remove exceptional weight from above
  • 11. RENDERING SITE SAFE
    • Pre-cut ventilation openings
    • Remove windows & cover openings
    • Ensure doors function or remove
    • Check/operate building components
    • Make stairways safe
  • 12. RENDERING SITE SAFE
    • Check chimney stability
    • Remove fuel tanks
    • Remove unnecessary debris
    • Make porches/steps safe
    • Fence off ground openings
  • 13. RENDERING SITE SAFE
    • Cover holes in walls/ceilings
    • Check Cabinets for unsafe contents
  • 14. RENDERING SITE SAFE
    • Clearly mark all burn rooms
    • Clearly mark all sides of building
  • 15. RENDERING SITE SAFE
    • Clearly mark all exits
  • 16. RENDERING SITE SAFE
    • Cover windows and doors so that rapid egress can still be achieved
  • 17. RENDERING SITE SAFE
    • Eliminate toxic weed, hives & vermin
    • Remove hazardous vegetation
    • Protect exposures
    • Prepare fire sets
  • 18. ENABLING OBJECTIVE REVIEW
    • We have identified and describes all permits required for use in training in an acquired structure.
    • We have described and demonstrated pre-burn planning procedures for an acquired structure.
    • We have described and demonstrated proper procedures for making an acquired structure and the surrounding area safe for training.
  • 19. END OF SECTION ON ACQUIRED STRUCTURE PREPARATION