Your SlideShare is downloading. ×
  • Like
Pt. pks   medan centre point
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Pt. pks medan centre point

  • 408 views
Published

 

Published in Business , Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
408
On SlideShare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
36
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. MEDAN CENTRE POINT, MEDAN SITE PLAN OF APPARTMENT – MEDAN CENTRE POIN PROPOSE OF PERI FORMWORK    Proposed by PT Beton Perkasa Wijaksana Regional Sales IV MEDAN PERI VARIO GT24 COLUMN CORE WALL  PERI LICO  PERI UP ROSSET
  • 2. PERI Vario System  General Component
  • 3. PERI Vario System  PERI GIRDER GT 24
  • 4. PERI Vario System  PERI GIRDER GT 24 GT 24 could use for vertical and horizontal formwork. Its mean ot give benefit are : 1.Flexlible for application and optimalitation in site 2.Strong enough for wall/column formwork. 3.Manageable for Slabs and Beam 4.Cost effective for customized formwork solution 5.Has bending moment capasities up to 7 kNm, so fewer needed GT 24, support and steel waler , its mean be able savings in labour cost.
  • 5. PERI Vario System For application, wall panel : 1.Assembling will do at Cikupa Workshop by PT BPW, for accuration panel refer to spesification requirment. 2.Formlining use Phonolik 4x8 -18 mm thickness, INCLUDING the Panel. 3.Its means all panel ready to use on construction site.
  • 6. MEDAN CENTRE POINT, MEDAN SITE PLAN OF APPARTMENT – MEDAN CENTRE POIN PROPOSE OF PERI FORMWORK    Proposed by PT Beton Perkasa Wijaksana Regional Sales IV MEDAN PERI VARIO GT24 COLUMN CORE WALL  PERI LICO  PERI UP ROSSET
  • 7. MEDAN CENTRE POINT, MEDAN SITE PLAN OF APPARTMENT – MEDAN CENTRE POIN PROPOSE OF PERI FORMWORK    Proposed by PT Beton Perkasa Wijaksana Regional Sales IV MEDAN PERI VARIO GT24 COLUMN CORE WALL  PERI LICO  PERI UP ROSSET
  • 8. PERI UP ROSSET FOR SLAB BEAM SHORING SYSTEM  General Component
  • 9. PERI UP ROSSET FOR SLAB BEAM SHORING SYSTEM
  • 10. PERI UP ROSSET FOR ACCESS SCAFFOLDING (STAIR)  Reinforcement Scaffold  Stair Tower  Working Platform
  • 11. PERI UP ROSSET FOR ACCESS SCAFFOLDING (STAIR)  Stair : General Component
  • 12. MEDAN CENTRE POINT, MEDAN SITE PLAN OF APPARTMENT – MEDAN CENTRE POIN PROPOSE OF PERI FORMWORK    Proposed by PT Beton Perkasa Wijaksana Regional Sales IV MEDAN PERI VARIO GT24 COLUMN CORE WALL  PERI LICO  PERI UP ROSSET