Well5rp

111 views
63 views

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
111
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • 8. Seems to set Five Ash pumping equal to its hard-wired pumping for the previous stress period. For stress period 1, Five Ash pumping not changed from input value. For other stress periods, the hard- wired value overrides the input value.
  • 9. Pumping rates are increased by 15%. Why?
  • Well5rp

    1. 1. Assign pumping rates to q34289. Same pumping rates recur every 4 years for twenty years. Five Ash calibrated pumpage. (mlv) Rewind fort.12 (mlv) fort.12 is the well package input file. Read part of first line into "alpha," which is never used. (mlv) 1 2 3
    2. 2. Read number of wells in current stress period, NWELLS II=1 Read layer, row, column, flow for well II Xpump = 1.15 If II=1 and kper > 1 then Well (4,II) = q3429(kper - 1) 4 5 6 7 8 1
    3. 3. Well(4,ii) = 1.15* Well(4,ii) 9 WELL(1,II) = K WELL (2,II) = I WELL (3,II) = J 10 II = NWELLS ? RETURN Y N 11 12 II = II + 1 6

    ×