SlideShare a Scribd company logo
1 of 26
Download to read offline
FEBRUARY 2018
Patrick F.N. Anderson
High-Grade Gold in Northern Ireland
President & CEO
2
FORWARD-LOOKING INFORMATION AND QUALIFIED PERSON
2
This presentation contains “forward looking information” which may include, but is not limited to, statements with respect to the future financial or operating performance of
the Company and its subsidiaries (collectively, “Dalradian”) and its mineral projects, the future price of metals, the estimation of mineral resources, the realization of mineral
resource estimates, the timing and amount of estimated future production, costs of production, capital, operating and exploration expenditures, costs and timing of the
development of new deposits, costs and timing of future exploration, requirements for additional capital, government regulation of mining operations, environmental risks,
reclamation expenses, title disputes or claims, limitations of insurance coverage and the timing and possible outcome of pending regulatory matters. Often, but not always,
forward looking statements can be identified by the use of words and phrases such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”,
“intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”,
“would”, “might” or “will” be taken, occur or be achieved.
Forward looking statements are based on the opinions and estimates of management as of the date such statements are made and are based on various assumptions such as
the continued political stability in Northern Ireland, that permits required for Dalradian’s operations will be obtained on a timely basis in order to permit Dalradian to proceed on
schedule with its planned exploration and development programs, that skilled personnel and contractors will be available as Dalradian’s operations continue to grow, that the
price of gold will be at levels that render Dalradian’s mineral projects economic, that the Company will be able to continue raising the necessary capital to finance its operations
and realize on mineral resource estimates and current mine plans and that the assumptions, qualifications, parameters and methods contained, or to be contained, in the 2016
Technical Report, the FS Announcement and the 2017 Feasibility Study (each as defined below) are accurate and complete.
Forward looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Dalradian to
be materially different from any future results, performance or achievements expressed or implied by the forward looking statements. Such factors include, among others,
general business, economic, competitive, political and social uncertainties; the actual results of current and future exploration activities; the actual results of reclamation
activities; conclusions of economic evaluations; changes in project parameters and/or economic assessments as plans continue to be refined; future prices of metals; possible
variations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; failure of plant, equipment or processes to operate as anticipated; accidents,
labour disputes and other risks of the mining industry; political instability; delays in obtaining governmental approvals or financing or in the completion of development or
construction activities, as well as those factors discussed in the section entitled “Risk Factors” in the Company’s Annual Information Form for the year ended December 31, 2015
dated March 23, 2016 (the “AIF”).
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward looking
statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward looking statements contained
herein are made as of the date of this presentation and the Company disclaims any obligation to update any forward looking statements, whether as a result of new
information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward looking statements will prove to be
accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward
looking statements.
On December 12, 2016, Dalradian announced certain highlights from the results of its positive feasibility study on its Curraghinalt Gold Project (the “FS Announcement”). A NI
43-101 compliant technical report to support the FS Announcement and summarizing the results of the Feasibility Study is currently being prepared and will be filed under the
Company's profile on SEDAR by January 25, 2017 (the “2017 Feasibility Study”). The Qualified Persons (as defined by NI 43-101) responsible for the FS Announcement and the
2017 Feasibility Study include: JDS Energy & Mining: Garett Macdonald, P. Eng.; Michael Makarenko, P. Eng.; Stacy Freudigmann, P. Eng.; Indi Gopinathan, P. Eng.; SRK
Consulting (UK): Jane Joughin, M. Sc., PrSciNat; R. J. Bowell Ph.D., C. Chem MRSC, C. Geol FGS FIMMM; William Harding, M. Sc.; SRK Consulting (Canada): Cam Scott, P. Eng.;
Bruce Murphy, P. Eng.; WSP Canada: Annie Lavoie, P. Eng.; Jean-Philippe Grenier, P. Eng.
Certain scientific and technical data in this presentation was derived from both the FS Announcement and the Company’s current NI 43-101 technical report entitled,
“Technical Report for the Northern Ireland Gold Project, Northern Ireland”, dated June 17, 2016 (the “2016 Technical Report”) prepared by Dr. Jean-Francois Couture, PGeo
(APGO#0197) and Dr. Oy Leuangthong, PEng (PEO#90563867), both of SRK Consulting (Canada) Inc. and Stacy Freudigmann, PEng (APEGBC #33972) of JDS Energy & Mining Inc.,
all of whom are independent Qualified Persons. The exploration data contained herein was based on the procedures described in the 2016 Technical Report. The scientific and
technical data contained herein is subject to and qualified by all of the assumptions, qualifications and procedures described in the FS Announcement and the 2016 Technical
Report, as applicable. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Eric Tremblay, P.Eng., Chief Operating Officer, and Greg Hope, M.Sc., MAIG, Exploration and Geology Manager with Dalradian Resources Inc., are the Qualified Persons who
have reviewed and approved the scientific and technical information in this presentation.
3
â–ŞLarge, high-grade vein system
open in all directions
â–ŞClose to surface and easily
accessible
â–Ş120,000 ha land package with
many gold showings
Geology
â–ŞPermit a mine
â–ŞImprove economics from
positive FS base-case
Strategy
â–ŞAISC of US$653 per ounce
â–ŞSimple flow sheet and
metallurgy
â–Ş94% gold recovery
Engineering
â–ŞAll political parties focused on
economy and job creation
â–ŞTransparent permitting
process
Jurisdiction
â–ŞBase-case FS shows robust
economics, supported by
test-mining
â–ŞPositive geotechnical and
ore-sorting results being fed
into FS update
â–ŞCAPEX of US$192M
and after-tax IRR of 25.5%
â–ŞRaised over CAD$320 M
since 2010, including $78 million
investment from Orion and
Osisko
FS Improvement Financial Strength
HIGH-GRADE GOLD IN NORTHERN IRELAND
4
STOCK PRICE PERFORMANCE
$0.50
$0.75
$1.00
$1.25
$1.50
$1.75
$2.00
$2.25
$2.50
$2.75
Jan-17 Feb-17Mar-17 Apr-17 May-
17
Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18Mar-18
Michael Curran$2.30
Tyron Breytenbach$2.70
$2.00 Andrew Mikitchook
$2.50 Eric Zaunscherb
$2.50 Stephen Walker
Ryan Walker$2.05
Analyst targets range from
$1.70-$2.70
$1.04
Feb 15, 2018
SHARE CAPITALIZATION AND
CASH POSITION
Shares outstanding of
355 million and fully diluted of
368 million as of January 2018
Cash position of $49 million*
as of September 30, 2017
All dollars quoted in $ CAD
$1.70 Craig Stanley
140p Jonathan Guy
$2.70 Gary Sidhu
$2.25
*Figure does not include funds from financing or warrant exercises
CURRAGHINALT DEPOSIT
6
MINERAL PROJECTS IN IRELAND AND THE UK
Gortin
Omagh
Curraghinalt
BELFAST
Galantas
Gold
Conroy
Diamonds
& Gold
Walkabout
Resources
Irish Salt
Mining
Curraghinalt Gold
Deposit
Gold
Base Metals
Other
Exploration
In Production
Permitting/Permitted,
but not producing
Past Producer
Stage Commodity
United Kingdom
Republic of Ireland
Northern Ireland
7
OUR PROGRESS AT CURRAGHINALT
â–Ş UG exploration permits granted;
ESIA and planning application
submitted
â–Ş 2 PEAs and a positive base-case
feasibility study released over
5 years
â–Ş 5 resource updates resulting in a
7x increase in resources
â–Ş Completed 2,000 metres of
underground development with
3 test stopes
0.0
1.0
2.0
3.0
4.0
5.0
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
2007 Pre-
DNA
2010 DNA
Year 1
2011 DNA
Year 2
2014 DNA
Year 4
2016 DNA
Year 6
27 Years
of Work
6 Years of Work
Metres of Drilling
Inferred Resource (Moz)
Measured and Indicated Resource (Moz)
8
RESOURCES AND RESERVES
Proven and Probable Reserves:
5.24 MT grading 8.54 g/t Au for 1.44 million ounces
High-grade 4.4M ounce gold resource1
Measured: 0.03 MT grading 26.99 g/t Au
for 25,000 contained ounces
Indicated: 5.58 MT grading 11.53 g/t Au
for 2.07 million contained ounces
Inferred: 7.13 MT grading 10.06 g/t Au
for 2.30 million contained ounces
1 Refer to technical report dated January 2 2017, and entitled “43-101 Feasibility Study Technical Report on the Curraghinalt Gole Project Northern Ireland” prepared by JDS Energy
and Mining Inc. at www.dalradian.com
9
RESOURCE EXPANSION
Vein and Vein Intersections
Curraghinalt Deposit
Attagh Burn
Alwories
Proposed
mill site
Curraghinalt
Deposit
12km
Curraghinalt
Trend
Rylagh
Bounds of Current Resource
10
Curraghinalt
Deposit
Attagh Burn
2.47m @ 18.99 g/t Au
3
Golan Burn
0.6m @ 61.43 g/t Au
Gold Anomalies
1
kilometres
0 2
Scotch Town
Peak of 10.52 g/t Au
In mineralized boulders
400 m Step-out
3.2m @ 5.34 g/t Au
2
1 1a 12-CT-173 drilled at 150/-60; 1b and 1c 12-CT-162 drilled at 180/-55; 1b from 186.00m - 188.22m, 1c from 229.08m - 230.55m; true width undetermined
2 11-CT-99 drilled at 200/-60, from 471.14-474.34 m
3 12-CT-167 drilled from 201.93-204.40 m
Vein and Vein Intersections
Glaciated Terrain with Minimal Outcrop
Alwories Discovery Holes
1
4.72m @ 14.82 g/t Au
1a
2.22m @ 14.10 g/t Au
1b
1.47m @ 23.60 g/t Au
1c
12KM GOLD TREND IS MOSTLY UNEXPLORED
Proposed
mill site
Curraghinalt
Deposit
12km
Curraghinalt
Trend
Rylagh
11
HIGH GRADE REGIONAL DISCOVERIES
Fallagh
Rylagh
1
kilometres
0 2
1
kilometres
0 2
kilometres
0 5
SAMPLES - New Discovery
50cm @ 139.5 g/t Au (F11601)
10-15cm @ 1.37 g/t Au (F11627)
50cm @ 168 g/t Au (F36011)
50cm @ 42.4 g/t Au (F36011)
SAMPLES
30.30 g/t Au (B0641)
29.20 g/t Au (B0633)
17.25 g/t Au (B0625)
11.65 g/t Au (B0627)
Curraghinalt
Deposit
Curraghinalt
Deposit
12km
Curraghinalt
Trend
Rylagh
12
â–Ş 2018: drilling planned for
several regional targets
â–Ş Soil sampling, panning
and stream sediment
sampling to continue on
all licences
â–Ş Over 120,000 hectares
under licence or
application
REGIONAL EXPLORATION
FEASIBILITY STUDY
14
SITE PLAN
Curraghinalt has been designed to fit in with the natural topography
with a low profile design, using trees, berms and building wall sound
panels to buffer noise.
15
FEASIBILITY STUDY SNAPSHOT
Feasibility details after Minco transaction have not been verified by an independent technical report. All figures in US$ unless otherwise stated
Proven & Probable Reserves 5.24 Mt @ 8.54 g/t Au for 1.44 Moz
Gold Recovery 94.3%
Average Mine Production Rate 1,400 tpd (511,000 tpy)
Average Gold Production 130,000 oz/y over first 10 years (1.36 Moz)
Total Operating Cost/tonne of Ore $143.94 $137.46
Pre-Production Capital Costs $192.0 Million
LOM Sustaining Capital $165.1 Million
All-In Sustaining Cost (AISC) $674/oz Au $653/oz Au
Metal pricing assumptions $1,250/oz Au, $17/oz Ag
After Tax Economics
$301 Million $322 Million NPV(5%) – C$429 Million
24.4% 25.5% IRR
4.0 year 3.8 year payback
After closing the royalty deal:
• AISC decreased US$21/oz
• NPV Increased US$21 million
• IRR increased 1.1%
16
LIFE OF MINE GOLD PRODUCTION
LOM gold production totals 1.36 million ounces, averaging 130,000 oz/year over
the first 10 years with maximum production of 170,000 oz expected in Year 7.
-
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
-
25,000
50,000
75,000
100,000
125,000
150,000
175,000
200,000
-2 -1 1 2 3 4 5 6 7 8 9 10 11
AverageMinedGrade(g/t)
PayableGoldOunces
Operating Year
Production profile
target
17
OPPORTUNITIES FOR IMPROVEMENT
â–Ş Infill drilling to enhance grade
â–Ş Conversion of Inferred resource into M&I
and reserves
â–Ş Focused geotechnical program in zones
currently classified as poor ground
â–Ş Production rate
â–Ş Au recovery
▪ Used “new” equipment
â–Ş Ore sorting
18
2017/Q1 2018 WORK PROGRAM NEARLY COMPLETE
â–Ş 40,000 metres of infill, step-out and
geotechnical drilling
â–Ş Additional geotechnical studies and
ore-sorting tests to support updated
Feasibility Study
PERMITTING
20
FOCUS ON JOBS AND ECONOMY
â–Ş Top priority of all NI political parties is jobs and investment
â–Ş Successfully permitted underground exploration at Curraghinalt
â–Ş Numerous government officials have visited our project, including over 70 site visits by
regulators during UG program
â–Ş More than 40 meetings with regulators prior to submitting planning application
Stormont, NI Parliament Building
Planning
Decision
PERMITTING PROCESS
Project Description
Completed
ESIA Completed
Planning
Application
Submitted
Permission to construct a
mine based on Planning
Application consisting of:
• Project Description
• Environmental Social
Impact Assessment
(ESIA)
Curraghinalt is a
regionally significant
project.
Recommendation and
final decision will be
made by the DfI Minister
or Permanent Secretary
(if Assembly not
reinstated)
The Planning Application
was submitted Nov 2017.
The Application contains:
• over 10,000 pages
• 40 reports on
environmental and
social aspects of the
project
The review process
includes:
• Consultation with
public and other
regulators
• An examination of
the application
• A public inquiry
(anticipated due to
the scale of the
project)
Planning NI
Review
Completed Commencing
SUMMARY
DNA HIGHLIGHTS
â–Ş Business-friendly jurisdiction
with transparent permitting
â–Ş Large, high-grade vein system
â–Ş Positive Feasibility Study, with
multiple opportunities for
improvement
â–Ş Project has advanced to
permitting stage
â–Ş Active technical program
and news flow in 2018
APPENDIX
25
REVISED MODELING – 32% MORE OUNCES IN MINEABLE MATERIAL
â–Ş Re-wireframing with shorter
composite length on two
major veins
â–Ş Increased amount of
mineable material above
5 g/t Au cutoff
â–Ş Increased ability to use
longhole mining
â–Ş Methodology to be applied
to next resource update and
feasibility update
T-17 Section 2016
T-17 Section 2017
Longhole (Uppers and Stopes)
Longhole Pillars
Cut and Fill
Development
26
ORE SORTING INCREASES GRADE 55%, DECREASES WASTE 36%
â–Ş XRT + Screening
‒ Recovery: 97.8%
‒ Waste Removal: 51%
â–Ş XRT + Laser +
Screening
‒ Recovery: 99.3%
‒ Waste Removal: 36%
â–Ş Further investigation
needed to determine
which produces best
economics
XRT (X-ray) Sorter
Laser Sorter

More Related Content

What's hot

Dalradian Corporate Presentation December 12, 2016
Dalradian Corporate Presentation December 12, 2016Dalradian Corporate Presentation December 12, 2016
Dalradian Corporate Presentation December 12, 2016DalradianResource
 
Trek Mining - Transaction to Form Equinox Gold
Trek Mining - Transaction to Form Equinox GoldTrek Mining - Transaction to Form Equinox Gold
Trek Mining - Transaction to Form Equinox GoldTrek Mining Inc.
 
Dalradian Presentation at Mines and Money London
Dalradian Presentation at Mines and Money London Dalradian Presentation at Mines and Money London
Dalradian Presentation at Mines and Money London DalradianResource
 
Dalradian presentation september 14 2016 final
Dalradian presentation september 14 2016 finalDalradian presentation september 14 2016 final
Dalradian presentation september 14 2016 finalDalradianResource
 
Dalradian presentation november 8 2016 final
Dalradian presentation november 8 2016 finalDalradian presentation november 8 2016 final
Dalradian presentation november 8 2016 finalDalradianResource
 
Dalradian Corporate Presentation January 10, 2017
Dalradian Corporate Presentation January 10, 2017Dalradian Corporate Presentation January 10, 2017
Dalradian Corporate Presentation January 10, 2017DalradianResource
 
Belo Sun Mining - Corporate Presentation, October 2017
Belo Sun Mining - Corporate Presentation, October 2017Belo Sun Mining - Corporate Presentation, October 2017
Belo Sun Mining - Corporate Presentation, October 2017Belo Sun Mining Corp.
 
Dalradian presentation october 20 2016 final
Dalradian presentation october 20 2016 finalDalradian presentation october 20 2016 final
Dalradian presentation october 20 2016 finalDalradianResource
 
50.1 falco presentation feasibility - final - v2
50.1 falco presentation   feasibility - final - v250.1 falco presentation   feasibility - final - v2
50.1 falco presentation feasibility - final - v2FalcoCorporate
 
Dalradian presentation june 20 2016 final
Dalradian presentation june 20 2016 finalDalradian presentation june 20 2016 final
Dalradian presentation june 20 2016 finalDalradianResource
 
Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014DalradianResource
 
Dalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 finalDalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 finalDalradianResource
 
Dalradian corporate presentation jan7 2014 final v2
Dalradian corporate presentation jan7 2014 final   v2Dalradian corporate presentation jan7 2014 final   v2
Dalradian corporate presentation jan7 2014 final v2DalradianResource
 
Dalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 finalDalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 finalDalradianResource
 
Dalradian Investor Presentation August 6
Dalradian Investor Presentation August 6Dalradian Investor Presentation August 6
Dalradian Investor Presentation August 6DalradianResource
 
Investor Presentation - August 2016
Investor Presentation - August 2016Investor Presentation - August 2016
Investor Presentation - August 2016DalradianResource
 
Dalradian presentation april 29 final2
Dalradian presentation april 29 final2Dalradian presentation april 29 final2
Dalradian presentation april 29 final2DalradianResource
 
Investor Presentation - November 2015
Investor Presentation - November 2015Investor Presentation - November 2015
Investor Presentation - November 2015DalradianResource
 
Dalradian presentation july 8 2014 final
Dalradian presentation july 8 2014 finalDalradian presentation july 8 2014 final
Dalradian presentation july 8 2014 finalDalradianResource
 
Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018PretiumR
 

What's hot (20)

Dalradian Corporate Presentation December 12, 2016
Dalradian Corporate Presentation December 12, 2016Dalradian Corporate Presentation December 12, 2016
Dalradian Corporate Presentation December 12, 2016
 
Trek Mining - Transaction to Form Equinox Gold
Trek Mining - Transaction to Form Equinox GoldTrek Mining - Transaction to Form Equinox Gold
Trek Mining - Transaction to Form Equinox Gold
 
Dalradian Presentation at Mines and Money London
Dalradian Presentation at Mines and Money London Dalradian Presentation at Mines and Money London
Dalradian Presentation at Mines and Money London
 
Dalradian presentation september 14 2016 final
Dalradian presentation september 14 2016 finalDalradian presentation september 14 2016 final
Dalradian presentation september 14 2016 final
 
Dalradian presentation november 8 2016 final
Dalradian presentation november 8 2016 finalDalradian presentation november 8 2016 final
Dalradian presentation november 8 2016 final
 
Dalradian Corporate Presentation January 10, 2017
Dalradian Corporate Presentation January 10, 2017Dalradian Corporate Presentation January 10, 2017
Dalradian Corporate Presentation January 10, 2017
 
Belo Sun Mining - Corporate Presentation, October 2017
Belo Sun Mining - Corporate Presentation, October 2017Belo Sun Mining - Corporate Presentation, October 2017
Belo Sun Mining - Corporate Presentation, October 2017
 
Dalradian presentation october 20 2016 final
Dalradian presentation october 20 2016 finalDalradian presentation october 20 2016 final
Dalradian presentation october 20 2016 final
 
50.1 falco presentation feasibility - final - v2
50.1 falco presentation   feasibility - final - v250.1 falco presentation   feasibility - final - v2
50.1 falco presentation feasibility - final - v2
 
Dalradian presentation june 20 2016 final
Dalradian presentation june 20 2016 finalDalradian presentation june 20 2016 final
Dalradian presentation june 20 2016 final
 
Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014
 
Dalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 finalDalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 final
 
Dalradian corporate presentation jan7 2014 final v2
Dalradian corporate presentation jan7 2014 final   v2Dalradian corporate presentation jan7 2014 final   v2
Dalradian corporate presentation jan7 2014 final v2
 
Dalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 finalDalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 final
 
Dalradian Investor Presentation August 6
Dalradian Investor Presentation August 6Dalradian Investor Presentation August 6
Dalradian Investor Presentation August 6
 
Investor Presentation - August 2016
Investor Presentation - August 2016Investor Presentation - August 2016
Investor Presentation - August 2016
 
Dalradian presentation april 29 final2
Dalradian presentation april 29 final2Dalradian presentation april 29 final2
Dalradian presentation april 29 final2
 
Investor Presentation - November 2015
Investor Presentation - November 2015Investor Presentation - November 2015
Investor Presentation - November 2015
 
Dalradian presentation july 8 2014 final
Dalradian presentation july 8 2014 finalDalradian presentation july 8 2014 final
Dalradian presentation july 8 2014 final
 
Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018
 

Similar to High-Grade Gold in Northern Ireland

Dalradian Corporate Presentation March 30, 2017
Dalradian Corporate Presentation March 30, 2017Dalradian Corporate Presentation March 30, 2017
Dalradian Corporate Presentation March 30, 2017DalradianResource
 
Dalradian Corporate Presentation March 1, 2017
Dalradian Corporate Presentation March 1, 2017Dalradian Corporate Presentation March 1, 2017
Dalradian Corporate Presentation March 1, 2017DalradianResource
 
Dalradian Presentation August 18, 2014
Dalradian Presentation August 18, 2014Dalradian Presentation August 18, 2014
Dalradian Presentation August 18, 2014DalradianResource
 
Dalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 FinalDalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 FinalDalradianResource
 
Dalradian presentation sep 14 2015 final qp
Dalradian presentation sep 14 2015 final qpDalradian presentation sep 14 2015 final qp
Dalradian presentation sep 14 2015 final qpDalradianResource
 
Dalradian Presentation - August, 24 2015
Dalradian Presentation - August, 24 2015Dalradian Presentation - August, 24 2015
Dalradian Presentation - August, 24 2015DalradianResource
 
Dalradian presentation sep 1 2015 final
Dalradian presentation sep 1 2015 finalDalradian presentation sep 1 2015 final
Dalradian presentation sep 1 2015 finalDalradianResource
 
Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017DalradianResource
 
Dalradian presentation march 2016 final
Dalradian presentation march 2016 finalDalradian presentation march 2016 final
Dalradian presentation march 2016 finalDalradianResource
 
Dalradian presentation feb 1 2016
Dalradian presentation feb 1 2016Dalradian presentation feb 1 2016
Dalradian presentation feb 1 2016DalradianResource
 
Dalradian presentation sep 14 2015 final
Dalradian presentation sep 14 2015 finalDalradian presentation sep 14 2015 final
Dalradian presentation sep 14 2015 finalDalradianResource
 
Dalradian Presentation September 10, 2014
Dalradian Presentation September 10, 2014Dalradian Presentation September 10, 2014
Dalradian Presentation September 10, 2014DalradianResource
 
Dalradian Investor Presentation January 2016
Dalradian Investor Presentation January 2016Dalradian Investor Presentation January 2016
Dalradian Investor Presentation January 2016DalradianResource
 
Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2DalradianResource
 
Dalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 finalDalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 finalDalradianResource
 
Dalradian presentation nov16 2015 final
Dalradian presentation nov16 2015 finalDalradian presentation nov16 2015 final
Dalradian presentation nov16 2015 finalDalradianResource
 
Dalradian corporate presentation may 2013
Dalradian corporate presentation may 2013Dalradian corporate presentation may 2013
Dalradian corporate presentation may 2013DalradianResource
 
Dalradian presentation nov27 2015 final pfna
Dalradian presentation nov27 2015 final pfnaDalradian presentation nov27 2015 final pfna
Dalradian presentation nov27 2015 final pfnaDalradianResource
 
Dalradian Presentation October 16, 2014
Dalradian Presentation October 16, 2014Dalradian Presentation October 16, 2014
Dalradian Presentation October 16, 2014DalradianResource
 
Dalradian presentation march 5 2016 final
Dalradian presentation march 5 2016 finalDalradian presentation march 5 2016 final
Dalradian presentation march 5 2016 finalDalradianResource
 

Similar to High-Grade Gold in Northern Ireland (20)

Dalradian Corporate Presentation March 30, 2017
Dalradian Corporate Presentation March 30, 2017Dalradian Corporate Presentation March 30, 2017
Dalradian Corporate Presentation March 30, 2017
 
Dalradian Corporate Presentation March 1, 2017
Dalradian Corporate Presentation March 1, 2017Dalradian Corporate Presentation March 1, 2017
Dalradian Corporate Presentation March 1, 2017
 
Dalradian Presentation August 18, 2014
Dalradian Presentation August 18, 2014Dalradian Presentation August 18, 2014
Dalradian Presentation August 18, 2014
 
Dalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 FinalDalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 Final
 
Dalradian presentation sep 14 2015 final qp
Dalradian presentation sep 14 2015 final qpDalradian presentation sep 14 2015 final qp
Dalradian presentation sep 14 2015 final qp
 
Dalradian Presentation - August, 24 2015
Dalradian Presentation - August, 24 2015Dalradian Presentation - August, 24 2015
Dalradian Presentation - August, 24 2015
 
Dalradian presentation sep 1 2015 final
Dalradian presentation sep 1 2015 finalDalradian presentation sep 1 2015 final
Dalradian presentation sep 1 2015 final
 
Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017
 
Dalradian presentation march 2016 final
Dalradian presentation march 2016 finalDalradian presentation march 2016 final
Dalradian presentation march 2016 final
 
Dalradian presentation feb 1 2016
Dalradian presentation feb 1 2016Dalradian presentation feb 1 2016
Dalradian presentation feb 1 2016
 
Dalradian presentation sep 14 2015 final
Dalradian presentation sep 14 2015 finalDalradian presentation sep 14 2015 final
Dalradian presentation sep 14 2015 final
 
Dalradian Presentation September 10, 2014
Dalradian Presentation September 10, 2014Dalradian Presentation September 10, 2014
Dalradian Presentation September 10, 2014
 
Dalradian Investor Presentation January 2016
Dalradian Investor Presentation January 2016Dalradian Investor Presentation January 2016
Dalradian Investor Presentation January 2016
 
Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2
 
Dalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 finalDalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 final
 
Dalradian presentation nov16 2015 final
Dalradian presentation nov16 2015 finalDalradian presentation nov16 2015 final
Dalradian presentation nov16 2015 final
 
Dalradian corporate presentation may 2013
Dalradian corporate presentation may 2013Dalradian corporate presentation may 2013
Dalradian corporate presentation may 2013
 
Dalradian presentation nov27 2015 final pfna
Dalradian presentation nov27 2015 final pfnaDalradian presentation nov27 2015 final pfna
Dalradian presentation nov27 2015 final pfna
 
Dalradian Presentation October 16, 2014
Dalradian Presentation October 16, 2014Dalradian Presentation October 16, 2014
Dalradian Presentation October 16, 2014
 
Dalradian presentation march 5 2016 final
Dalradian presentation march 5 2016 finalDalradian presentation march 5 2016 final
Dalradian presentation march 5 2016 final
 

Recently uploaded

slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfFrancenel Paul
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
Best investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingBest investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingFalcon Invoice Discounting
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfProbe Gold
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...USDAReapgrants.com
 

Recently uploaded (15)

slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdf
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
Best investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingBest investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discounting
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdf
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
 

High-Grade Gold in Northern Ireland

  • 1. FEBRUARY 2018 Patrick F.N. Anderson High-Grade Gold in Northern Ireland President & CEO
  • 2. 2 FORWARD-LOOKING INFORMATION AND QUALIFIED PERSON 2 This presentation contains “forward looking information” which may include, but is not limited to, statements with respect to the future financial or operating performance of the Company and its subsidiaries (collectively, “Dalradian”) and its mineral projects, the future price of metals, the estimation of mineral resources, the realization of mineral resource estimates, the timing and amount of estimated future production, costs of production, capital, operating and exploration expenditures, costs and timing of the development of new deposits, costs and timing of future exploration, requirements for additional capital, government regulation of mining operations, environmental risks, reclamation expenses, title disputes or claims, limitations of insurance coverage and the timing and possible outcome of pending regulatory matters. Often, but not always, forward looking statements can be identified by the use of words and phrases such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward looking statements are based on the opinions and estimates of management as of the date such statements are made and are based on various assumptions such as the continued political stability in Northern Ireland, that permits required for Dalradian’s operations will be obtained on a timely basis in order to permit Dalradian to proceed on schedule with its planned exploration and development programs, that skilled personnel and contractors will be available as Dalradian’s operations continue to grow, that the price of gold will be at levels that render Dalradian’s mineral projects economic, that the Company will be able to continue raising the necessary capital to finance its operations and realize on mineral resource estimates and current mine plans and that the assumptions, qualifications, parameters and methods contained, or to be contained, in the 2016 Technical Report, the FS Announcement and the 2017 Feasibility Study (each as defined below) are accurate and complete. Forward looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Dalradian to be materially different from any future results, performance or achievements expressed or implied by the forward looking statements. Such factors include, among others, general business, economic, competitive, political and social uncertainties; the actual results of current and future exploration activities; the actual results of reclamation activities; conclusions of economic evaluations; changes in project parameters and/or economic assessments as plans continue to be refined; future prices of metals; possible variations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; political instability; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled “Risk Factors” in the Company’s Annual Information Form for the year ended December 31, 2015 dated March 23, 2016 (the “AIF”). Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward looking statements contained herein are made as of the date of this presentation and the Company disclaims any obligation to update any forward looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking statements. On December 12, 2016, Dalradian announced certain highlights from the results of its positive feasibility study on its Curraghinalt Gold Project (the “FS Announcement”). A NI 43-101 compliant technical report to support the FS Announcement and summarizing the results of the Feasibility Study is currently being prepared and will be filed under the Company's profile on SEDAR by January 25, 2017 (the “2017 Feasibility Study”). The Qualified Persons (as defined by NI 43-101) responsible for the FS Announcement and the 2017 Feasibility Study include: JDS Energy & Mining: Garett Macdonald, P. Eng.; Michael Makarenko, P. Eng.; Stacy Freudigmann, P. Eng.; Indi Gopinathan, P. Eng.; SRK Consulting (UK): Jane Joughin, M. Sc., PrSciNat; R. J. Bowell Ph.D., C. Chem MRSC, C. Geol FGS FIMMM; William Harding, M. Sc.; SRK Consulting (Canada): Cam Scott, P. Eng.; Bruce Murphy, P. Eng.; WSP Canada: Annie Lavoie, P. Eng.; Jean-Philippe Grenier, P. Eng. Certain scientific and technical data in this presentation was derived from both the FS Announcement and the Company’s current NI 43-101 technical report entitled, “Technical Report for the Northern Ireland Gold Project, Northern Ireland”, dated June 17, 2016 (the “2016 Technical Report”) prepared by Dr. Jean-Francois Couture, PGeo (APGO#0197) and Dr. Oy Leuangthong, PEng (PEO#90563867), both of SRK Consulting (Canada) Inc. and Stacy Freudigmann, PEng (APEGBC #33972) of JDS Energy & Mining Inc., all of whom are independent Qualified Persons. The exploration data contained herein was based on the procedures described in the 2016 Technical Report. The scientific and technical data contained herein is subject to and qualified by all of the assumptions, qualifications and procedures described in the FS Announcement and the 2016 Technical Report, as applicable. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Eric Tremblay, P.Eng., Chief Operating Officer, and Greg Hope, M.Sc., MAIG, Exploration and Geology Manager with Dalradian Resources Inc., are the Qualified Persons who have reviewed and approved the scientific and technical information in this presentation.
  • 3. 3 â–ŞLarge, high-grade vein system open in all directions â–ŞClose to surface and easily accessible â–Ş120,000 ha land package with many gold showings Geology â–ŞPermit a mine â–ŞImprove economics from positive FS base-case Strategy â–ŞAISC of US$653 per ounce â–ŞSimple flow sheet and metallurgy â–Ş94% gold recovery Engineering â–ŞAll political parties focused on economy and job creation â–ŞTransparent permitting process Jurisdiction â–ŞBase-case FS shows robust economics, supported by test-mining â–ŞPositive geotechnical and ore-sorting results being fed into FS update â–ŞCAPEX of US$192M and after-tax IRR of 25.5% â–ŞRaised over CAD$320 M since 2010, including $78 million investment from Orion and Osisko FS Improvement Financial Strength HIGH-GRADE GOLD IN NORTHERN IRELAND
  • 4. 4 STOCK PRICE PERFORMANCE $0.50 $0.75 $1.00 $1.25 $1.50 $1.75 $2.00 $2.25 $2.50 $2.75 Jan-17 Feb-17Mar-17 Apr-17 May- 17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18Mar-18 Michael Curran$2.30 Tyron Breytenbach$2.70 $2.00 Andrew Mikitchook $2.50 Eric Zaunscherb $2.50 Stephen Walker Ryan Walker$2.05 Analyst targets range from $1.70-$2.70 $1.04 Feb 15, 2018 SHARE CAPITALIZATION AND CASH POSITION Shares outstanding of 355 million and fully diluted of 368 million as of January 2018 Cash position of $49 million* as of September 30, 2017 All dollars quoted in $ CAD $1.70 Craig Stanley 140p Jonathan Guy $2.70 Gary Sidhu $2.25 *Figure does not include funds from financing or warrant exercises
  • 6. 6 MINERAL PROJECTS IN IRELAND AND THE UK Gortin Omagh Curraghinalt BELFAST Galantas Gold Conroy Diamonds & Gold Walkabout Resources Irish Salt Mining Curraghinalt Gold Deposit Gold Base Metals Other Exploration In Production Permitting/Permitted, but not producing Past Producer Stage Commodity United Kingdom Republic of Ireland Northern Ireland
  • 7. 7 OUR PROGRESS AT CURRAGHINALT â–Ş UG exploration permits granted; ESIA and planning application submitted â–Ş 2 PEAs and a positive base-case feasibility study released over 5 years â–Ş 5 resource updates resulting in a 7x increase in resources â–Ş Completed 2,000 metres of underground development with 3 test stopes 0.0 1.0 2.0 3.0 4.0 5.0 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 2007 Pre- DNA 2010 DNA Year 1 2011 DNA Year 2 2014 DNA Year 4 2016 DNA Year 6 27 Years of Work 6 Years of Work Metres of Drilling Inferred Resource (Moz) Measured and Indicated Resource (Moz)
  • 8. 8 RESOURCES AND RESERVES Proven and Probable Reserves: 5.24 MT grading 8.54 g/t Au for 1.44 million ounces High-grade 4.4M ounce gold resource1 Measured: 0.03 MT grading 26.99 g/t Au for 25,000 contained ounces Indicated: 5.58 MT grading 11.53 g/t Au for 2.07 million contained ounces Inferred: 7.13 MT grading 10.06 g/t Au for 2.30 million contained ounces 1 Refer to technical report dated January 2 2017, and entitled “43-101 Feasibility Study Technical Report on the Curraghinalt Gole Project Northern Ireland” prepared by JDS Energy and Mining Inc. at www.dalradian.com
  • 9. 9 RESOURCE EXPANSION Vein and Vein Intersections Curraghinalt Deposit Attagh Burn Alwories Proposed mill site Curraghinalt Deposit 12km Curraghinalt Trend Rylagh Bounds of Current Resource
  • 10. 10 Curraghinalt Deposit Attagh Burn 2.47m @ 18.99 g/t Au 3 Golan Burn 0.6m @ 61.43 g/t Au Gold Anomalies 1 kilometres 0 2 Scotch Town Peak of 10.52 g/t Au In mineralized boulders 400 m Step-out 3.2m @ 5.34 g/t Au 2 1 1a 12-CT-173 drilled at 150/-60; 1b and 1c 12-CT-162 drilled at 180/-55; 1b from 186.00m - 188.22m, 1c from 229.08m - 230.55m; true width undetermined 2 11-CT-99 drilled at 200/-60, from 471.14-474.34 m 3 12-CT-167 drilled from 201.93-204.40 m Vein and Vein Intersections Glaciated Terrain with Minimal Outcrop Alwories Discovery Holes 1 4.72m @ 14.82 g/t Au 1a 2.22m @ 14.10 g/t Au 1b 1.47m @ 23.60 g/t Au 1c 12KM GOLD TREND IS MOSTLY UNEXPLORED Proposed mill site Curraghinalt Deposit 12km Curraghinalt Trend Rylagh
  • 11. 11 HIGH GRADE REGIONAL DISCOVERIES Fallagh Rylagh 1 kilometres 0 2 1 kilometres 0 2 kilometres 0 5 SAMPLES - New Discovery 50cm @ 139.5 g/t Au (F11601) 10-15cm @ 1.37 g/t Au (F11627) 50cm @ 168 g/t Au (F36011) 50cm @ 42.4 g/t Au (F36011) SAMPLES 30.30 g/t Au (B0641) 29.20 g/t Au (B0633) 17.25 g/t Au (B0625) 11.65 g/t Au (B0627) Curraghinalt Deposit Curraghinalt Deposit 12km Curraghinalt Trend Rylagh
  • 12. 12 â–Ş 2018: drilling planned for several regional targets â–Ş Soil sampling, panning and stream sediment sampling to continue on all licences â–Ş Over 120,000 hectares under licence or application REGIONAL EXPLORATION
  • 14. 14 SITE PLAN Curraghinalt has been designed to fit in with the natural topography with a low profile design, using trees, berms and building wall sound panels to buffer noise.
  • 15. 15 FEASIBILITY STUDY SNAPSHOT Feasibility details after Minco transaction have not been verified by an independent technical report. All figures in US$ unless otherwise stated Proven & Probable Reserves 5.24 Mt @ 8.54 g/t Au for 1.44 Moz Gold Recovery 94.3% Average Mine Production Rate 1,400 tpd (511,000 tpy) Average Gold Production 130,000 oz/y over first 10 years (1.36 Moz) Total Operating Cost/tonne of Ore $143.94 $137.46 Pre-Production Capital Costs $192.0 Million LOM Sustaining Capital $165.1 Million All-In Sustaining Cost (AISC) $674/oz Au $653/oz Au Metal pricing assumptions $1,250/oz Au, $17/oz Ag After Tax Economics $301 Million $322 Million NPV(5%) – C$429 Million 24.4% 25.5% IRR 4.0 year 3.8 year payback After closing the royalty deal: • AISC decreased US$21/oz • NPV Increased US$21 million • IRR increased 1.1%
  • 16. 16 LIFE OF MINE GOLD PRODUCTION LOM gold production totals 1.36 million ounces, averaging 130,000 oz/year over the first 10 years with maximum production of 170,000 oz expected in Year 7. - 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 - 25,000 50,000 75,000 100,000 125,000 150,000 175,000 200,000 -2 -1 1 2 3 4 5 6 7 8 9 10 11 AverageMinedGrade(g/t) PayableGoldOunces Operating Year Production profile target
  • 17. 17 OPPORTUNITIES FOR IMPROVEMENT â–Ş Infill drilling to enhance grade â–Ş Conversion of Inferred resource into M&I and reserves â–Ş Focused geotechnical program in zones currently classified as poor ground â–Ş Production rate â–Ş Au recovery â–Ş Used “new” equipment â–Ş Ore sorting
  • 18. 18 2017/Q1 2018 WORK PROGRAM NEARLY COMPLETE â–Ş 40,000 metres of infill, step-out and geotechnical drilling â–Ş Additional geotechnical studies and ore-sorting tests to support updated Feasibility Study
  • 20. 20 FOCUS ON JOBS AND ECONOMY â–Ş Top priority of all NI political parties is jobs and investment â–Ş Successfully permitted underground exploration at Curraghinalt â–Ş Numerous government officials have visited our project, including over 70 site visits by regulators during UG program â–Ş More than 40 meetings with regulators prior to submitting planning application Stormont, NI Parliament Building
  • 21. Planning Decision PERMITTING PROCESS Project Description Completed ESIA Completed Planning Application Submitted Permission to construct a mine based on Planning Application consisting of: • Project Description • Environmental Social Impact Assessment (ESIA) Curraghinalt is a regionally significant project. Recommendation and final decision will be made by the DfI Minister or Permanent Secretary (if Assembly not reinstated) The Planning Application was submitted Nov 2017. The Application contains: • over 10,000 pages • 40 reports on environmental and social aspects of the project The review process includes: • Consultation with public and other regulators • An examination of the application • A public inquiry (anticipated due to the scale of the project) Planning NI Review Completed Commencing
  • 23. DNA HIGHLIGHTS â–Ş Business-friendly jurisdiction with transparent permitting â–Ş Large, high-grade vein system â–Ş Positive Feasibility Study, with multiple opportunities for improvement â–Ş Project has advanced to permitting stage â–Ş Active technical program and news flow in 2018
  • 25. 25 REVISED MODELING – 32% MORE OUNCES IN MINEABLE MATERIAL â–Ş Re-wireframing with shorter composite length on two major veins â–Ş Increased amount of mineable material above 5 g/t Au cutoff â–Ş Increased ability to use longhole mining â–Ş Methodology to be applied to next resource update and feasibility update T-17 Section 2016 T-17 Section 2017 Longhole (Uppers and Stopes) Longhole Pillars Cut and Fill Development
  • 26. 26 ORE SORTING INCREASES GRADE 55%, DECREASES WASTE 36% â–Ş XRT + Screening ‒ Recovery: 97.8% ‒ Waste Removal: 51% â–Ş XRT + Laser + Screening ‒ Recovery: 99.3% ‒ Waste Removal: 36% â–Ş Further investigation needed to determine which produces best economics XRT (X-ray) Sorter Laser Sorter