Your SlideShare is downloading. ×
0
Ovenly inferno 215 lt_f12
Ovenly inferno 215 lt_f12
Ovenly inferno 215 lt_f12
Ovenly inferno 215 lt_f12
Ovenly inferno 215 lt_f12
Ovenly inferno 215 lt_f12
Ovenly inferno 215 lt_f12
Ovenly inferno 215 lt_f12
Ovenly inferno 215 lt_f12
Ovenly inferno 215 lt_f12
Ovenly inferno 215 lt_f12
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Ovenly inferno 215 lt_f12

164

Published on

http://www.appropedia.org/Laurel_Tree_Charter_School

http://www.appropedia.org/Laurel_Tree_Charter_School

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
164
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Overview• Objective• Project Criteria• Final Design: Location and Specifications• Cost: Design Hours, Implementation, Operation & Maintenance• Conclusion: Results
  • 2. ObjectiveLow embedded energy, natural, beautiful way to cook pizza Drawing by Sara Newell
  • 3. Criteria Safety Construction Time Effectiveness Durability Usability Sustainability Aesthetics Student InvolvementCost
  • 4. Final DesignOverview of Site SW corner of school  Parking lot substructure Photos by Liam Gunst
  • 5. Final DesignSand FormThermal Layer Photos by Sara Newell
  • 6. Final DesignAdditional Elements Countertop Wood Storage Chimney Door Drawing by Sara Newell
  • 7. Implementation Costs & Design Time 232 Total Hours Phase I: Problem Formulation 3 Phase II: 40 Problem Analysis & Literature Review Phase III: 19 Alternative Solutions 149 21 Phase IV: Decision Phase Phase V: Decision, Specific ations, and Construction
  • 8. Operation & Maintenance• Oven usage: Once a week, 25 weeks a year  1 cubic foot of wood to preheat the oven  $0 to $150 annually depending upon on wood http://www.howtobaker.com/recipes/project- food-blog-challenge-1/ price and quantity http://www.flickr.com/photos/thedesertecho/7170079606/• Plastering: Re-plaster every 5 years and patch as needed  $70• Total estimated annual cost  $14 to $164, depends on usage and source of fuel http://www.geocities.ws/mosesrocket/page4.html
  • 9. ConclusionResults Student involvement Sustainability: utilized reclaimed and local materials Effectiveness • Heat up time: 2 hours www.appropedia.org/Laurel_Tree_Ovenly_Inferno • Cooking rate: 3 minutes per pizza http://www.laureltreelc.org/
  • 10. Thank You For Your Support Becca Schuler and her Physics class Brenda Sutter Malila & Sierra Kimberli Hudson Kiko Denzer James Muir G.R. Sunderson, Inc. Primary Benchspiration Lonny Grafman

×