NOA FEIS (EPA) - Kemper County IGCC Project
Upcoming SlideShare
Loading in...5
×
 

NOA FEIS (EPA) - Kemper County IGCC Project

on

  • 673 views

Weekly receipt of Environmental Impact Statements Filed 05/10/2010 Through 05/14/2010, Including the Final EIS for the Kemper County IGCC project.

Weekly receipt of Environmental Impact Statements Filed 05/10/2010 Through 05/14/2010, Including the Final EIS for the Kemper County IGCC project.

Statistics

Views

Total Views
673
Views on SlideShare
673
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

NOA FEIS (EPA) - Kemper County IGCC Project NOA FEIS (EPA) - Kemper County IGCC Project Document Transcript

  • 28612 Federal Register / Vol. 75, No. 98 / Friday, May 21, 2010 / Notices listed in the index, some information is 21/2010, Contact: Robert W. Rock EIS No. 20100182, Draft EIS, USACE, not publicly available, e.g., CBI or other 541–523–1242. LA, Small Diversion at Convent/Blind information whose disclosure is EIS No. 20100175, Draft EIS, USN, 00, River, Proposes to construct a restricted by statute. Certain other United States Marine Corps Joint Freshwater Diversion Project, material, such as copyrighted material, Strike Fighter F–35B West Coast Integrated Feasibility Study, will be publicly available only in hard Basing, To Efficiently and Effectively Louisiana Coastal Area, St. James copy. Publicly available docket Maintain Combat Capability and Parish, LA, Comment Period Ends: materials are available either Mission Readiness, CA and AZ, 07/05/2010, Contact: Dr. William P. electronically at http:// Comment Period Ends: 07/05/2010, Klein, Jr. 504–862–2540. www.regulations.gov or in hard copy at Contact: Adrianne Saboya 619–532– EIS No. 20100183, Draft EIS, USACE, the OEI Docket in the EPA Headquarters 4742. LA, Amite River Diversion Canal Docket Center. EIS No. 20100176, Final EIS, USN, WA, Modification Element of the Section Naval Sea Systems Command 7006(E)(3) Ecosystem Restoration Dated: May 17, 2010. (NAVSEA). Naval Undersea Warfare Project, Feasibility Study, Louisiana Rebecca Clark, Center (NUWC), Keyport Complex Coastal Area (LCA) Ascension and Acting Director, National Center for Extension, Propose to Extend the Livingston Parishes, LA, Comment Environmental Assessment. Operational Areas, Three Distinct Period Ends: 07/05/2010, Contact: Dr. [FR Doc. 2010–12280 Filed 5–20–10; 8:45 am] Range Sites: Keyport Range Site; William P. Klein, Jr. 504–862–2540. BILLING CODE 6560–50–P Dabob Bay Range Complex (DBRC) Dated: May 18, 2010. Site, Quinault Underwater Tracking Ken Mittelholtz, Range Site, Gray Harbor, Jefferson, ENVIRONMENTAL PROTECTION Kitsap and Mason Counties, WA, Wait Deputy Director, NEPA Compliance Division, AGENCY Office of Federal Activities. Period Ends: 06/21/2010, Contact: Kimberly Kler 360–396–0927. [FR Doc. 2010–12262 Filed 5–20–10; 8:45 am] [ER–FRL–8990–5] EIS No. 20100177, Draft EIS, USFS, MN, BILLING CODE 6560–50–P Environmental Impact Statements; Tracks Project, Proposing Forest Notice of Availability Vegetation Management and Related Transportation System Activities, DEPARTMENT OF THE TREASURY Responsible Agency: Office of Federal Superior National Forest, St. Louis Activities, General Information (202) and Lake Counties, MN, Comment Office of the Comptroller of the 564–1399 or http://www.epa.gov/ Period Ends: 07/05/2010, Contact: Currency compliance/nepa/. Susan Duffy 218–365–2097. Weekly receipt of Environmental Impact EIS No. 20100178, Draft EIS, USACE, FEDERAL RESERVE SYSTEM Statements Filed 05/10/2010 Through LA, Medium Diversion at White 05/14/2010 Pursuant to 40 CFR Ditch, Integrated Feasibility Study, FEDERAL DEPOSIT INSURANCE 1506.9. Louisiana Coastal Area (LCA) CORPORATION Notice Ecosystem Restoration, Implementation, Plaquemines Parish, DEPARTMENT OF THE TREASURY In accordance with Section 309(a) of LA, Comment Period Ends: 07/05/ the Clean Air Act, EPA is required to 2010, Contact: Dr. Nathan Dayan 504– Office of Thrift Supervision make its comments on EISs issued by 862–2530. other Federal agencies public. EIS No. 20100179, Final EIS, TVA, AL, Proposed Agency Information Historically, EPA has met this mandate Bellefonte Site Single Nuclear Unit Collection Activities; Comment by publishing weekly notices of Project, Proposes to Complete or Request availability of EPA comments, which Construct and Operate a Single 1,100– AGENCIES: Office of the Comptroller of includes a brief summary of EPA’s 1, 200 MW Nuclear Generation Unit, the Currency (OCC), Treasury; Board of comment letters, in the Federal Jackson County, AL, Wait Period Governors of the Federal Reserve Register. Since February 2008, EPA has Ends: 06/21/2010, Contact: Ruth System (Board); Federal Deposit been including its comment letters on Horton 865–632–3719. Insurance Corporation (FDIC); and EISs on its Web site at: http:// EIS No. 20100180, Draft EIS, USACE, Office of Thrift Supervision (OTS), www.epa.gov/compliance/nepa/ LA, Convey Atchafalaya River Water Treasury. eisdata.html. Including the entire EIS to Northern Terrebonne Marshes and ACTION: Joint notice and request for comment letters on the Web site Multipurpose Operation of Houma comment. satisfies the Section 309(a) requirement Navigation Lock, Integrated to make EPA’s comments on EISs Feasibility Study, Louisiana Coastal SUMMARY: In accordance with the available to the public. Accordingly, on Area (LCA) Implementation, requirements of the Paperwork March 31, 2010, EPA discontinued the Lafourche, Terrebonne, St. Mary Reduction Act (PRA) of 1995 (44 U.S.C. publication of the notice of availability Parish, LA, Comment Period Ends: chapter 35), the OCC, the Board, the of EPA comments in the Federal 07/05/2010, Contact: Dr. Nathan FDIC, and the OTS (the ‘‘agencies’’) may Register. Dayan 504–862–2530. not conduct or sponsor, and the EIS No. 20100174, Final EIS, USFS, 00, EIS No. 20100181, Final EIS, DOE, MS, respondent is not required to respond emcdonald on DSK2BSOYB1PROD with NOTICES Wallowa-Whitman National Forest Kemper County Integrated to, an information collection unless it Invasive Plants Treatment Project, To Gasification Combined-Cycle (IGCC) displays a currently valid Office of Protect Native Vegetation by Project, Construction and Operation Management and Budget (OMB) control Controlling, Containing, or of Advanced Power Generation Plant, number. The Federal Financial Eradicating Invasive Plant, Wallowa, U.S. Army COE Section 404 Permit, Institutions Examination Council Baker, Malheur and Grant Counties, Kemper County, MS, Wait Period (FFIEC), of which the agencies are OR and Adams and Nez Perce Ends: 06/21/2010, Contact: Richard A. members, has approved the agencies’ Counties, ID, Wait Period Ends: 06/ Hargis, Jr. 888–322–7426 Ext. 6065. publication for public comment of a VerDate Mar<15>2010 16:40 May 20, 2010 Jkt 220001 PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 E:FRFM21MYN1.SGM 21MYN1