co-funded by the European Union
WP1 - Content
DM2E All WP Meeting 5
Bergen, 12 June 2014
Doron Goldfarb, Austrian National...
Outline
1. WP1 Last six months
2. New associated partners
3. Current status of content providers
DM2E All WP Meeting Berge...
WP1 Last six months
DM2E All WP Meeting Bergen: Work Package 112.06.2014
• WP1 Task 1.3 and 1.4 completed
• WP1 Task 1.5 “...
WP1 Task 1.3 and 1.4 completed
DM2E All WP Meeting Bergen: Work Package 112.06.2014
 Task 1.3
Testing the User Interface ...
WP1 Task 1.3 – General Conclusion
DM2E All WP Meeting Bergen: Work Package 1
• Three approaches seeking to provide visual ...
WP1 Task 1.3 – General Conclusion
DM2E All WP Meeting Bergen: Work Package 1
• Visual interfaces provide intuitive startin...
WP1 Task 1.4 - Setup a test scenario for
the prototype platform
DM2E All WP Meeting Bergen: Work Package 1
• Assess the sc...
WP1 Task 1.4 - Setup a test scenario for
the prototype platform
DM2E All WP Meeting Bergen: Work Package 1
• Two groups of...
WP1 Task 1.4 - Setup a test scenario for
the prototype platform
DM2E All WP Meeting Bergen: Work Package 1
Results Wittgen...
WP1 Last six months
DM2E All WP Meeting Bergen: Work Package 112.06.2014
• WP1 Task 1.3 and 1.4 completed
• WP1 Task 1.5 “...
WP1 Task 1.5 –
Organise the final content integration
DM2E All WP Meeting Bergen: Work Package 112.06.2014
• Consistency c...
WP1 Last six months
DM2E All WP Meeting Bergen: Work Package 112.06.2014
• WP1 Task 1.3 and 1.4 completed
• WP1 Task 1.5 “...
D1.2 Final Integration Report
DM2E All WP Meeting Bergen: Work Package 112.06.2014
• February 2014
• Detailed descriptions...
Review
DM2E All WP Meeting Bergen: Work Package 112.06.2014
• Deliverable 1.2 approved
• At the time of review, five of ni...
Europeana ingestions tests
DM2E All WP Meeting Bergen: Work Package 112.06.2014
• Conversion from DM2E to EDM
• Test set o...
Outline
1. WP1 Last six months
2. New associated partners
3. Current status of content providers
DM2E All WP Meeting Berge...
New associated partners
DM2E All WP Meeting Bergen: Work Package 112.06.2014
• Petőfi Irodalmi Múzeum / Petőfi Literary Mu...
Outline
1. WP1 Last six months
2. New associated partners
3. Current status of content providers
DM2E All WP Meeting Berge...
WP1 Current status of content providers
DM2E All WP Meeting Bergen: Work Package 112.06.2014
ONB
ABO 15596190
CODICES 4610...
WP1 Current status of content providers
DM2E All WP Meeting Bergen: Work Package 112.06.2014
CJH via EAJC various 400000
N...
co-funded by the European Union
Thank You !
Upcoming SlideShare
Loading in...5
×

DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

430

Published on

Published in: Education, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
430
On Slideshare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

  1. 1. co-funded by the European Union WP1 - Content DM2E All WP Meeting 5 Bergen, 12 June 2014 Doron Goldfarb, Austrian National Library (ONB)
  2. 2. Outline 1. WP1 Last six months 2. New associated partners 3. Current status of content providers DM2E All WP Meeting Bergen: Work Package 112.06.2014 2
  3. 3. WP1 Last six months DM2E All WP Meeting Bergen: Work Package 112.06.2014 • WP1 Task 1.3 and 1.4 completed • WP1 Task 1.5 “Final content integration” ongoing • Deliverable D1.2 “Final Integration Report” • Review meeting March 2014 • Europeana ingestion tests 3
  4. 4. WP1 Task 1.3 and 1.4 completed DM2E All WP Meeting Bergen: Work Package 112.06.2014  Task 1.3 Testing the User Interface for Creating Mapping (MINT), Interlinking Heuristics (SILK) and for Configuring the Workflow (OMNOM) 4
  5. 5. WP1 Task 1.3 – General Conclusion DM2E All WP Meeting Bergen: Work Package 1 • Three approaches seeking to provide visual paradigms to data integration tasks 12.06.2014 5
  6. 6. WP1 Task 1.3 – General Conclusion DM2E All WP Meeting Bergen: Work Package 1 • Visual interfaces provide intuitive starting point for novice users • Simple tasks can be managed successfully • The more complex the tasks get, the more users switch to command line tools provided by WP2 for fulfilling their tasks • Visual, web based interfaces sometimes have problems with logging and progress feedback 12.06.2014 6
  7. 7. WP1 Task 1.4 - Setup a test scenario for the prototype platform DM2E All WP Meeting Bergen: Work Package 1 • Assess the scholarly research platform • ONB, UIB, NET7, UBER, ECORR • Focus on usability and usefulness for DH scholars 12.06.2014 7
  8. 8. WP1 Task 1.4 - Setup a test scenario for the prototype platform DM2E All WP Meeting Bergen: Work Package 1 • Two groups of digital humanities scholars • Exercises, Surveys, Discussion with DH Scholars 12.06.2014 8
  9. 9. WP1 Task 1.4 - Setup a test scenario for the prototype platform DM2E All WP Meeting Bergen: Work Package 1 Results Wittgenstein Pilot Group DH scholars of the test group could imagine using the platform for a variety of scenarios such as • Propaedeutic uses • Close reading • Creating citation networks • Collaborative research scenarios • Teaching • Refining ontologies DH solutions in the LOD context • Discussions about the publication status of semantic annotations • Credibility • Intellectual property rights • Characteristics of ontologies 12.06.2014 Results Burckhardtsource Group Pundit systematically used for proofreading and semantic annotation • The reader is facilitated in his understanding of the sources • More experienced users are also able to create "intellectual mappings" of an author • Topics and interesting fields can be highlighted • Semantic annotations are both useful for the scholars working with the material and for others who may want to re-use the semantically enriched data 9
  10. 10. WP1 Last six months DM2E All WP Meeting Bergen: Work Package 112.06.2014 • WP1 Task 1.3 and 1.4 completed • WP1 Task 1.5 “Final content integration” ongoing • Deliverable D1.2 “Final Integration Report” • Review meeting March 2014 • Europeana ingestion tests 10
  11. 11. WP1 Task 1.5 – Organise the final content integration DM2E All WP Meeting Bergen: Work Package 112.06.2014 • Consistency check of metadata revealed need for clear guidelines how to map data to DM2E • Document: „Recommendations for the RDF representation of DM2E metadata” • Seven providers out of 16 delivered metadata about ~17,550,000 pages until February 2014 • Mapping documentation on DM2E wiki http://wiki.dm2e.eu/Main_Page 11
  12. 12. WP1 Last six months DM2E All WP Meeting Bergen: Work Package 112.06.2014 • WP1 Task 1.3 and 1.4 completed • WP1 Task 1.5 “Final content integration” ongoing • Deliverable D1.2 “Final Integration Report” • Review meeting March 2014 • Europeana ingestion tests 12
  13. 13. D1.2 Final Integration Report DM2E All WP Meeting Bergen: Work Package 112.06.2014 • February 2014 • Detailed descriptions of Content Provider workflows • Results of Task 1.3, 1.4, 1.5 13
  14. 14. Review DM2E All WP Meeting Bergen: Work Package 112.06.2014 • Deliverable 1.2 approved • At the time of review, five of nine providers listed in the DoW and two associate providers had delivered their data. • Reviewers asked for additional report on reasons for delayed content until end of April 2014  Delivered April 30th. 14
  15. 15. Europeana ingestions tests DM2E All WP Meeting Bergen: Work Package 112.06.2014 • Conversion from DM2E to EDM • Test set of 34 metadata records ingested • Discussion during extra session 15
  16. 16. Outline 1. WP1 Last six months 2. New associated partners 3. Current status of content providers DM2E All WP Meeting Bergen: Work Package 112.06.2014 16
  17. 17. New associated partners DM2E All WP Meeting Bergen: Work Package 112.06.2014 • Petőfi Irodalmi Múzeum / Petőfi Literary Museum www.pim.hu – Participated in Athena / Athena Plus / Europeana Inside – Plan to provide digital facsimiles and transcriptions of the Hungarian avant-garde magazine “A Tett” to DM2E 17
  18. 18. Outline 1. WP1 Last six months 2. New associated partners 3. Current status of content providers DM2E All WP Meeting Bergen: Work Package 112.06.2014 18
  19. 19. WP1 Current status of content providers DM2E All WP Meeting Bergen: Work Package 112.06.2014 ONB ABO 15596190 CODICES 46104 MPIWG HARRIOT 10138 RARA 532379 UBER DINGLER 181549 BBAW DTA 418608 UIB WITTGENSTEINSOURCE 5000 SBB KPE 182892 UBFFM SAMMLUNGEN 307202 GEI GEI-DIGITAL 456324 17736386 19
  20. 20. WP1 Current status of content providers DM2E All WP Meeting Bergen: Work Package 112.06.2014 CJH via EAJC various 400000 NLI MANUSCRIPTS 110000 BOOKS 2750000 ARCHIVAL MAT. 3000 SBB WESTERN MANUSCRIPTS 45000 MPIWG ISMI 100000 DFGA/CRNS NIETZSCHESOURCE 19330 JDC via EAJC various 20000 BRANDEIS via EAJC SPANISH CIVIAL WAR POSTERS 150 ECORR BURCKHARDTSOURCE 2834 BAS Codex Suprasliensis 570 KB Manuscript Illuminations 11141 3442695 MARC EAD TEI DC(X) 20
  21. 21. co-funded by the European Union Thank You !
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×