Water proofing of century old building sbm
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Water proofing of century old building sbm

on

  • 569 views

 

Statistics

Views

Total Views
569
Views on SlideShare
569
Embed Views
0

Actions

Likes
0
Downloads
7
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Water proofing of century old building sbm Presentation Transcript

  • 1. Water Proofing On Century Old Building TARFELT LM – Single Component Cold Applied Water Based Bituminous Liquid Membrane, ShaliGrout 65 – Single Component Free Flow Non-shrink High Strength / Fluidity Grout ShaliSBR Latex – Bonding Admixture For Adhesion & Repairs Of Concrete Structures ShaliCryl 215 R – Single Component UV Resistant Elastomeric Exterior Coating Authorised Applicator
  • 2. Pre Treatment Ingress of Water from Terrace affecting Electrical Ducts
  • 3. Pre Treatment Vegetation Formation
  • 4. Pre Treatment Cracks formed due to Vegetation grown on the Terrace
  • 5. Pre Treatment Dust, Muck, Algae Formation on the Terrace
  • 6. Pre Treatment Cracks in the Joints and Corners
  • 7. Treatment Process Removal of Vegitation
  • 8. Treatment Process Clearing the Dust, Musk, Algae using steel Brush
  • 9. Treatment Process Cleaning and washing the surface using High Pressure Water Jet
  • 10. Treatment Process Using Water as a Vehical
  • 11. Treatment Process Applying TarFelt LM Primer as a Base Material for Water Proofing
  • 12. Treatment Process Applying TarFelt LM as Water Proofing on the Base Surface.
  • 13. Treatment Process Applying ShaliCryl 215 R as UV Protection
  • 14. Treatment Process Filling of Joint and Cracks using Shali SBR Latex and Shali Grout
  • 15. Post Treatment Situation after 15 Days after Treatment
  • 16. Post Treatment Drying and Pealing of Paints
  • 17. Post Treatment Drying of wall near Electrical Duct
  • 18. Project Executed by Team D K Associates 310-B, 10th Cross, I.H.Township, Rajarajeshwari Nagar, Bangalore 560 098 Ph: +91 98 4532 4012 / 99 0199 9424, E-Mail: dkassociates2013@gmail.com