Uploaded on

View a presentation of the concept plans and diagrams for the Mining and Engineering Centre

View a presentation of the concept plans and diagrams for the Mining and Engineering Centre

More in: Technology , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
185
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Mining and Engineering Centre Concept plans and diagrams
  • 2. The Mining and Engineering CentreThe Mining and Engineering Centre will delivervocational education and training in:• Geo Science and Land Information Management Systems,• Heavy Vehicle Transport and Diesel Mechanics,• Mechanical and Civil Engineering, and• Automotive and Light Vehicle Transport
  • 3. The Mining and Engineering CentreThe Mining and Engineering CentreThe $38.3 million Mining and Engineering Centre is a major new training facility to bebuilt at TAFE SA’s Regency Campus at Regency Park.The Mining and Engineering Centre will be a centre for training excellence to supportgrowth in the mining, engineering, advanced manufacturing, transport and defenceindustries.New features include• Applied Research Facility• Industry Demonstration and Engagement Facility• Student centred learning common and administration hub• Flexible training methods including on-the-job, e-learning and on campus delivery
  • 4. Development The centre will completed by July 2014. Development will occur over three phasesPhase 1• Construction of an additional car park• Rebuilding of the Mechanical, Advanced Manufacturing and Fabrication Engineering School workshop and lecture areas• Part development of student centred learning common and administration hub
  • 5. DevelopmentPhase 2• Construction of the Land Information and Management Systems and Geoscience workshops and laboratory• New building construction for the Heavy Vehicle areas• Part redevelopment of the Light Vehicle areaPhase 3• Completion of the light vehicle workshops and lecture facilities including integration with heavy vehicle facilities• Completion of a student centred learning common and administration hub with new student entry points to the Centre
  • 6. Floor plans