Your SlideShare is downloading. ×
Eastmain Corporate Presentation Nov 2013
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Eastmain Corporate Presentation Nov 2013

566
views

Published on

Published in: Technology, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
566
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Eastmain Resources Inc. San Francisco Hard Assets Presentation November 2013 Adding Value Through Discovery EASTMAIN 75o 48’ 52” W 48’ 52” 52o 13’ 01” N 13’ 01” 72o 05’ 19” W 05’ 19” 52o 18’ 01” N 18’ 01” 75o 57’ 20” W 57’ 20” 52o 37’ 06” N 37’ 06”
  • 2. Forward Looking Statements EASTMAIN Certain  information  set  forth  in  this  Presentation  may  contain  forward‐ looking  statements  that  involve  substantial  known  and  unknown  risks  and  uncertainties.  These  forward‐looking  statements  are  subject  to  numerous  risks and uncertainties, certain of which are beyond the control of Eastmain,  including,  but  not  limited  to  the  impact  of  general  economic  conditions,  industry  conditions,  dependence  upon  regulatory  approvals  and  the  availability of financing. Readers are cautioned that the assumptions used in  the preparation of such information, although considered reasonable at the  time of preparation, may prove to be imprecise and, as such, undue reliance  should  not  be  placed  on  forward‐looking  statements.  Some  of  my  commentary  may  contain  forward‐looking  information,  therefore,  you  are  cautioned that  the  Corporation’s  actual  results  could  differ  materially  from  my  conclusions,  forecasts  or  projections.  I  refer  you  to  the  section  entitled  “Risk  Factors” in  our  Annual  Information  Form available  on  www.SEDAR.com which  sets  out  certain  material  factors  that  could  cause  actual results to differ. 2
  • 3. Top 10 Reasons to Own Eastmain 1. Eau Claire – High‐Grade Gold deposit 2. Expanding Resources with Drilling 3. Safe Jurisdiction 4. Good Infrastructure 5. 100% Eastmain – ROYALTY FREE 6. Eastmain Mine – 2nd Deposit with a new road 7. Fully Funded for 2014 8. Proven Track Record – 16 Years Listed on TSX 9. EASTMAIN Goldcorp – 10 for 10 10. M&A Candidate 3
  • 4. Overview of Eastmain Resources EASTMAIN Focused on Gold Exploration in Mine‐Friendly James Bay, Québec Company Overview • Two High‐Grade Gold deposits: Summary Market Statistics Trading Symbol OTCBB: EANRF TSX:ER − Eau Claire (1.8M ounces) − Eastmain Mine (former producer) • Eleonore South – Joint with Goldcorp • Favourable Mining Jurisdiction Share Price Range (1) C$0.19 – 0.90 Shares Outstanding 106.6 M Options 5.71 M • Mine‐ready infrastructure (roads, power) • New permanent road for Eastmain Mine Warrants Nil • Financial incentives (50% rebate) Shares Fully Diluted  112.3 M • Goldcorp largest shareholder (9.9%) Market Cap C$35 M Treasury (2) C$7.9 M • Fully funded for 2014 (1) As at close on October 31, 2013 (2) As of July 31, 2013, Eastmain had cash and cash equivalents of $4.9M, plus marketable securities of $3.0M; prepaid accounts $0.4M; $2M Quebec rebate receivable (not included). 4
  • 5. Gold Mining Camps in the Canadian Shield EASTMAIN James Bay, Québec – An emerging Mining Camp Gold Mining Camps in the Canadian Shield GOLD DEPOSITS CANADA < 0.3 M OZ > 0.3 - 3 M OZ > 3 - 5 M OZ > 5 - 10 M OZ > 10 M OZ CANADIAN SHIELD Overview • Over 200 million ounces Gold  produced from Canadian Shield  • James Bay, Québec, ranks  amongst the top 10 gold camps  • First Gold production in James  Bay starting in 2014 JAMES BAY, QUE EL Top 10 Canadian Gold Camps EM CW GL RR Timmins 1 2 Detour Kirkland Lake Val d’Or Hemlo Red Lake Noranda Detour James Bay, Quebec Rainy River Geraldton 3 4 5 Hemlo 6 KL Val d’Or 7 8 9 10 ‐ 500 km Abbreviations: CW – Clearwater; EL – Eleonore; EM – Eastmain Mine; GL – Geraldton; KL – Kirkland Lake; RR – Rainy River 20.0 40.0 60.0 80.0 Past Production + Current Gold Resources (millions oz)
  • 6. James Bay, Québec – Project Location Map EASTMAIN Excellent infrastructure – Roads, power, airports, fuel … James Bay – New Mining District QUEBEC JAMES BAY REGION Radisson/LG2 Eléonore Project (Roberto Deposit) (Goldcorp) RD Stornaway Renard Deposit DY James Bay ES RK LE Map Area Clearwater Project (Eau Claire Deposit) RH Eastmain Project Eastmain LG RS LH RH Eastmain Mine Nemaska Plan Nord Road  Under Construction Temiscamie 50 kms Clearwater Eastmain Mine DY – Dyna ES – Eléonore South LE – Lac Elmer LG – Lidge Lac Lessard LH – Lac Hudson RD – Radisson RK – Road King RS – Reservoir RH – Ruby Hill 6
  • 7. Clearwater Project - Eau Claire Gold Deposit EASTMAIN Eau Claire is Higher Grade than 75% of all Gold Deposits Worldwide Overview • High‐Grade Open Pit & Underground Gold Deposit • Road accessible with power nearby • High‐grade trenching & drilling results in 2013 will  add to the Gold resource • 30,000 metre drill program in progress • Resource Update ‐ Q4 2013 • PEA ‐ H1 2014 • Objectives – Long‐Life, Low‐Cost, Highly Profitable  Gold Deposit 7
  • 8. Creating Shareholder Value through Discovery EASTMAIN Eau Claire – a precious metal deposit rich in gold and tellurides Quartz‐Tourmaline Vein system with Au (Te‐Bi‐Ag) A Trenching Highlights Channel R15 B 39.2 g/t Au over 8.5 m Up to 215 g/t Au Channel R13 18.7 g/t Au over 8.0 m Up to 144.5 g/t Au Channel JQ36 51.5 g/t Au over 5.1 m Up to 406.5 g/t Au P Vein Channel JQ50 7.7 g/t Au over 9.9 m Up to 32.7 g/t Au Expanding 450 West Zone Photo A – Quartz‐Tourmaline piano‐key breccia  (P Vein from the 450 West Zone). Photo B – 2013 expansion of the 450 West Zone.  8
  • 9. Clearwater Project  EASTMAIN 450000 mE 445000 mE 440000 mE 455000 mE Clearwater: Eastmain’s Flagship Project (Contains Eau Claire Gold Deposit) Large Property >200 km2 Road Accessible Close to Power 5790000 mN High GRADE Eau Claire Gold Deposit SD SL SP 5785000 mN VA NL KN Hydro Quebec Access Road Rock Assays SL • Mining Camp‐scale gold‐bearing  corridor – 5kms long • >1000 rock samples ranging from  >1 to 500 g/t Au 30 to 500 g/t Au 10 to 30 g/t Au 5 to 10 g/t Au 2.5 to 5 g/t Au 5 km 465000 mE 5780000 mN 460000 mE Eastmain Reservoir 1.to 2.5 g/t Au Regional Target Areas: SD – Serendipity; SP – Spider; SL – Snake Lake; VA – Vanna; KN – Knight; NL – Natel  9
  • 10. Eau Claire Gold Deposit  EASTMAIN 445,250 mE 445,500 mE 450 West Pit 445,750 mE N 444,250 mE 5,785,750 mN 444,000 mE Surface Projection of Gold Mineralization, Potential Open Pit Areas & 2013 Drilling 5,785,750 mN 850 West Pit BM 5,785,500 mN 5,785,500 mN Gold Deposit CW 15 5,785,250 mN 476 490 Eau Claire Highlights 5,785,000 m • 1800mN long to 900 m depth • 50% of the resources occur from surface to 300 m depth • 37 of 59 drill holes contain Visible Gold in 2013 Felsic Volcaniclastic rock Mafic Volcanic rock 494 5,785,000 mN 501 505 493 Gold Mineralization Felsic Porphyry/Tonalite 502 Potential Open Pit Area 2013 Drill Hole 2013 Drill Hole with Visible Gold 250 m 2013 Proposed Drill Hole Note – Gold Mineralization surface projection represents the 0.5 g/t Au grade shell created in Leapfrog based on drilling up to 2011. Drill hole azimuth N 355E dipping 45 to 60 degrees north. 10
  • 11. Eau Claire Gold Deposit – Longsection Looking North EASTMAIN 3D View of Gold‐bearing drill intersections  Longitudinal view of Eau Claire Gold Deposit – 450 & 850 Zones – Continued expansion 850 West Zone 1 km 450 West Zone ER12‐456 OPEN ‐300 m EL 0 m RL ER12‐412 2011/2012 gold intercept OPEN Pre 2011 gold intercept • Drilling over the past 24 months has DOUBLED the size of the gold deposit within 300 m of surface • ER12‐412 – 17.7 g/t Au/6.5 m; ER12‐456 – 10.98 g/t Au /11.0 m  11
  • 12. Eau Claire Gold Deposit – Looking West Western Porphyry EASTMAIN F2 Fold Axis Hangingwall Porphyry Footwall Volcaniclastics & Porphyry 12
  • 13. Eau Claire Gold Deposit – Location of the High Grade EASTMAIN Western Porphyry Hangingwall Porphyry High‐grade Gold Zone Footwall Volcaniclastics & Porphyry 13
  • 14. Eau Claire Gold Resource (Polygonal Model) EASTMAIN Measured & Indicated Open Pit Grade at 4.67 g/t Au Resource Summary Tonnes Au Grade In Situ Gold (000’s) (g/t) (oz, uncapped) Measured 2,728 5.12 449,000 Measured & Indicated 4,228 4.67 635,000 Inferred 2,478 2.68 213,000 Measured & Indicated 706 6.37 145,000 Inferred 4,035 7.20 935,000 Total Measured & Indicated 4,938 4.91 780,000 Total Inferred 6,513 5.48 1,148,000 Eau Claire ‐ Open Pit (1) Eau Claire – Underground (2) Next Update – Q4 2013 (1) (2) (3) Resource estimate includes drilling up to the end of 2011 and was completed by P&E Mining Consultants. Underground grade based on a 2.5 g/t cut‐off grade; Open pit grade using a 0.5 g/t cut‐off grade. Block Model Resource estimate in progress 14
  • 15. Route 167 North Extension and Eastmain Mine Access EASTMAIN Quebec’s Plan Nord Infrastructure program – permanent road access • Quebec government’s Plan Nord program  provides new infrastructure to James Bay  region; MTQ are building Sections A & B of  Route 167 North Extension • Stornoway constructing Sections C & D  (financial assistance by Quebec) Renard Sections C & D Stornoway 97 km of Mine Road (50 km/hr)  Km 245 D  Km 195 • Eastmain Mine now linked to Route 167  Eastmain Western Troy C  Route 167 B Km 82  Km 143 Strateco Sections A & B MTQ 143 km of Regional Highway (70 km/hr) Legend A Expl/Mining Project Otish Park Km 0 Section A: 0-82 km  Temiscamie Section B: 82-143 km Section C: 143-195 km 25 km Photos courtesy of Stornoway Diamond Corporation;  MTQ – Quebec Ministry of Transport Section D: 195-245 km 15
  • 16. Eastmain Mine – Project Overview EASTMAIN A High‐Grade Gold Deposit with Significant Exploration Potential Project Geology  Project Overview • 100% Ownership – 125 km2 Eastmain Mine  Property N Mine Trend Ruby Hill East Eastmain  Mine Priority  Target Mine Camp Airstrip • New Route 167 North permanent road access • Eastmain Mine  Au‐Ag‐Cu‐rich deposit • Historical M&I resource  255,750 ounces gold  (1M tonnes at 9.95 g/t Au)(1) • Mine Trend >10 km long  • 53.3 g/t Au across 13.2 m 2.5 kms Route 167 North Access Road Rock Assay Data >30 g/t Au >10 to 30 g/t Au >5 to 10 g/t Au >1 to 5 g/t Au • 100‐person camp, airstrip,  fuel farm, ramp &  underground development • Prospecting & geochemical  surveys completed in 2013 (1) The Eastmain Mine Historical Resources are not NI43‐101 compliant. A Qualified Person has not done sufficient work to classify them as current mineral resources. The issuer is not treating  these historical resources as current mineral resources and these resources should not be relied upon. 16
  • 17. Eastmain Mine – Existing Infrastructure at Mine Site EASTMAIN $40 M Invested by Previous Owners on Exploration & Development • Existing mine site infrastructure includes: ‐ Ramp & U/G access to the A & B Zones ~100,000 tonnes mined in 1994‐95 ‐ Airstrip, fuel farm, 100‐person mine camp, tailings pond, mining lease • Winter road access soon to become permanent all weather road with Québec’s “Plan Nord” Mine Site Infrastructure Aerial view of Mine buildings & tailings pond (foreground) Eastmain Mine buildings and UG ramp (foreground) 17
  • 18. Eastmain Mine – 3D Underground View (Looking South) EASTMAIN 3D Longitudinal View – A & B Zones with mine development workings High‐grade Gold deposit – significant resource expansion potential A Zone 1000 m E 1500 m E 2000 m E Surface B Zone 50 0 m Ramp Underground  Development Target F Zone Target Target ‐ 500 m EL Gold mineralization 18
  • 19. Research Coverage EASTMAIN Analyst research coverage provided by three Brokerage firms Speculative Buy Recommendations ranging from $1.00 to $1.70 Brokerage Analyst Target Price Macquarie Equities Research Michael Gray 604 639-6372 $1.00 Stonecap Securities Brian Szeto 416 342-9918 $1.10 Laurentian Bank Securities Eric Lemieux 819 472-8037 $1.70 Investment Catalysts 25,000 m drilling Block Model Resource Update Q4 2013 PEA – H1 2014 High grade, safe jurisdiction, near development 19
  • 20. Reasons to own Eastmain EASTMAIN Clearwater One of the Highest‐Grade Undeveloped Gold Projects in Canada • Two High Grade Gold Deposits S‐Vein (Hole 98 – 65 m depth) • Clearwater 1 of 7 gold projects in NA  Visible Gold • Resource expansion through trenching &  drilling • Royalty Free  • Mine essential Infrastructure in place • Top Mining Jurisdiction • Provincial financial incentives (50%) 1 cm • Goldcorp – long term shareholder 2,540 g/t Au (74.17 oz/ton);  • Evidence for long‐life, low cost, highly  incl. 24.6 g/t Au over 55.6m profitable gold deposit at Eau Claire 20
  • 21. Contact Information EASTMAIN EASTMAIN Adding Value Through Discovery 36 Toronto Street  Suite 1000 Toronto, Ontario Canada, M5C 2C5 TSX:ER Tel: 519‐940‐4870 Fax: 519‐940‐4871 www.eastmain.com info@eastmain.com OTCBB:EANRF 21