Wastewater Collection Construction Projects

  1. 1. Major SanitarySewer Collection System Projects for the City Council August 23, 2012
  2. 2. OverviewBee Creek sewer trunk line (portions built in 1973) Replace existing line with 42” line, in 4 PhasesWellborn gravity sewer line New construction, required due to AnnexationEast Side Sewer – Lift Station, Force Main, and Gravity Line New construction, part of Bio-Corridor agreement with City of BryanNortheast Trunk Line and Hensel Park Lift Station Replace existing, since Northgate area development may require upgradesSpring Creek Corporate Campus and Lick Creek Trunk Line Implications for development of the Medical Corridor Spring Creek is new construction, Lick Creek would be upsized
  3. 3. Bee CreekTrunk Line
  4. 4. Bee Creek Trunk Line PlanBee Creek Trunk LineReplacement Project Diversion Point Existing line stays in service until Ph 3 done Phase 2 FY-14 $3.0 Phase 3 FY-15 $2.1 Phase 1 FY-13 $3.0 Phase 4 FY-16 $2.8
  5. 5. Wellborn Sewerline (FY-13)90% Design inOct 2012
  6. 6. East Side SewerProject (FY-13)60% Designunderway
  7. 7. NortheastTrunk Line(Unfunded)
  8. 8. Revised densities toreflect recentdevelopment patterns • Master Plan updates underway • Must coordinate plans with TAMU
  9. 9. Spring CreekCC Trunk Line Lick Creek Trunk Line
  10. 10. ConclusionsWe must proceed with sewer CIP Projects All future Re-Zonings and Development projectsshould continue to consider effects on theWastewater Collection system

×