Your SlideShare is downloading. ×
Sidewalk Construction Priorities
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Sidewalk Construction Priorities

631
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
631
On Slideshare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Workshop Agenda Item #5 New Construction Sidewalk Priorities
  • 2. Sidewalk Priorities • Bicycle, Pedestrian, and Greenways Master Plan – Adopted 2010 – Technical Task Force – Public Meetings • Over 110 miles proposed – Prioritization • Methodology and criteria created with public input
  • 3. Funding • 2008 Bond – $300,000 – Lincoln Sidewalk – Texas Ave. to University Dr. – Dexter Dr. – Park Place to Winding Rd. • FY14 – Guadalupe Dr. – Community Development Block Grant Funds • Dominik Dr. • Southland St. • West Ridge Dr. and San Pedro Dr.
  • 4. Sidewalk Priority Criteria 1) Population Density Safety Schools 2) Parks 3) Public requests 4) TAMU 5) Key destinations 6) Bus stops
  • 5. BPG Board Sidewalk Priority Methodology – • Evaluated every 5 years • Projects evaluated every year Next Steps • Consider list of additional projects for FY14 or FY15
  • 6. Questions