Your SlideShare is downloading. ×
  • Like
Play for All Inclusive Playground
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Play for All Inclusive Playground

  • 708 views
Published

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
708
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
5
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. CITY OF COLLEGE STATION PLAY FOR ALL PARK Destination Inclusive Playground
  • 2. CITY OF COLLEGE STATION PLAY FOR ALL PARK • Destination Inclusive Playground • Cooperative Project – Rotary Club of College Station – Noon Lions Club of College Station – City of College Station • Conceptual Design Project – TAMU Landscape Architecture Students (LAND320)
  • 3. CITY OF COLLEGE STATION PLAY FOR ALL PARK • Conceptual Design Project – TAMU Landscape Architecture Students (LAND320) • 3 Potential Sites – Stephen C. Beachy Central Park – Brian Bachmann Community Park – Anderson Park • Students worked directly with Playground and Health Industry Professionals • Studied Existing Inclusive Parks – Round Rock, Houston, San Antonio, Flower Mound, Austin, Tyler, Arlington – 7 States, England & Australia
  • 4. CITY OF COLLEGE STATION PLAY FOR ALL PARK • Preliminary Project Timeline – Present to City Council: Spring 2014 – Public comment/input meeting: Spring 2014 – Finalize Conceptual Plan: Summer 2014 – Begin Capital Campaign: Summer 2014 – Solicit RFQ for Design Firm: Summer/Fall 2014 – Project Specifications for Bids: Spring 2015 – Construction: Summer 2015 (depending on success of fund raising efforts)
  • 5. CITY OF COLLEGE STATION PLAY FOR ALL PARK • Budget Summary – Estimated Project Budget: $2,000,000 – College Station Rotary Club & College Station Noon Lions Clubs to spearhead the Capital Campaign – Depending on successful fund raising efforts, the Park could be built in phases – City of College Station funding allocated toward the project would come out of the Parkland Dedication Community Park Zone “C”. – College Station Parks & Recreation responsible for long term O&M; Costs supplemented by ongoing donations to a dedicated fund specifically for the inclusive playground.
  • 6. Round Rock, Texas