Proposed ColaLife pilot structure version 3

899 views

Published on

Version 3 of the proposed structure of the Zambian ColaLife pilot

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
899
On SlideShare
0
From Embeds
0
Number of Embeds
228
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Proposed ColaLife pilot structure version 3

  1. 1. Implementation phase The Pilot SODIS research and development Social marketing Packing Distribution Monitoring and evaluation Dissemination Replication planning ColaLife Pilot | Zambia Initial research AidPod Mother’s Kit prototyping Set-up phase Design and test EIC materials Baseline study Governance & project management
  2. 2. ColaLife Pilot | Zambia Initial research Assess what mothers/carers would consider to be attractive in an AidPod Mother’s Kit Set-up phase Confirm the margins that would be expected in the distribution chain Confirm the transport premium to remote rural communities Assess the financing/credit requirements of wholesalers/retailers (if any) If required: Look at options for the management of a voucher system Assess the willingness and ability of mothers/carers to pay Assess the need for vouchers to pump-prime the ‘pull’ of AidPods into communities (if any) Determine the level of subsidy required
  3. 3. ColaLife Pilot | Zambia AidPod Mother’s Kit prototyping Draw up a specification for the AidPod to be used in the pilot Set-up phase Carry out field tests Modify as required Assess options for manufacture Manufacture Produce ‘fit for purpose’ AidPods in the quantities required for pilot
  4. 4. ColaLife Pilot | Zambia Design and test EIC materials Develop prototype EIC materials Set-up phase Test with sample communities within the pilot area(s) Refine as required Produce the EIC materials in the formats and quantities required for the pilot
  5. 5. ColaLife Pilot | Zambia Baseline study Collect baseline data in control and pilot districts Set-up phase Design data collection methods in control and pilot districts for implementation phase Baseline report plus methodology for the collection of baseline/control data during pilot
  6. 6. ColaLife Pilot | Zambia Parallel study If possible, draw up specification and research manufacturing options Assess other options for the promotion and uptake of SODIS in remote rural areas A report on the SODIS options for the post-pilot roll-out phases SODIS research and development Assess the feasibility of producing a SODIS enabled AidPod for post pilot roll-out phases If not possible, look at other options including refining the SODIS bag

×