Cognosante MITA 3.0 SS-A Methodology Demonstration       2012 Medicaid Enterprise Systems Conference (MESC)2012 Medicaid E...
MITA 3.0 SS-A Requirements• States required to complete a MITA 3.0 SS-A  annually• The MITA SS-A must be included as an  a...
Why Choose Cognosante to support your next MITA 3.0 SS-A?• Cognosante will ensure your MITA SS-A is a valuable, long-term ...
Cognosante MITA Unmatched Experience                                      Cognosante MITA 2.0/2.01 SS-A and Planning Exper...
Cognosante MITA 3.0 Assessment Process Summary                       2012 Medicaid Enterprise Systems Conference          ...
Cognosante MITA 3.0 Assessment Solution Stack                        2012 Medicaid Enterprise Systems Conference          ...
Cognosante Approach to MITA Concept of Operations                       2012 Medicaid Enterprise Systems Conference       ...
Cognosante MITA Scheduling Management                                                                    Phase 2          ...
MITA Business Area As Is and To Be Maturity Summary                                                                      P...
Cognosante MITA 3.0 Scorecard                                                                     Phase 3                 ...
MITA Business Process Models                                                                     Phase 3                  ...
Conceptual and Logical Data Models Logical Data Model                                                                     ...
Cognosante MITA As Is Technical Architecture                                                                       Phase 3...
Cognosante Enterprise IT Assessment                                                                      Phase 3          ...
Cognosante Reference Model – MITA Strategic Systems Planning                                                              ...
Cognosante MITA Roadmap                                                                     Phase 4                       ...
Questions?               The Cognosante Team looks             forward to meeting your MITA                3.0 SS-A needs ...
Cognosante.comRandy Browning, MITA Program DirectorRandy.Browning@cognosante.com
Upcoming SlideShare
Loading in...5
×

Cognosante: MITA 3.0 SS-A Methodology Demonstration

1,246

Published on

Cognosante looks forward to meeting your MITA 3.0 SS-A needs using our unmatched MITA knowledge, experience, and flexible methodology. Cognosante will ensure your MITA SS-A is a valuable, long-term asset that supports your enterprise.

Published in: Health & Medicine
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,246
On Slideshare
0
From Embeds
0
Number of Embeds
11
Actions
Shares
0
Downloads
16
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • This presentation includes a methodology based on experience in 24 different state assessments and working with partners to develop the MITA framework.
  • Discuss capability driver and business intelligence behind these graphics
  • Transcript of "Cognosante: MITA 3.0 SS-A Methodology Demonstration"

    1. 1. Cognosante MITA 3.0 SS-A Methodology Demonstration 2012 Medicaid Enterprise Systems Conference (MESC)2012 Medicaid Enterprise Systems Conference 1
    2. 2. MITA 3.0 SS-A Requirements• States required to complete a MITA 3.0 SS-A annually• The MITA SS-A must be included as an attachment to requests for federal funding• The MITA SS-A is supported by a variety of documentation including narrative descriptions, process and data models, and diagrams• Ongoing MITA management and sustainability is a critical success factor in meeting MITA requirements 2012 Medicaid Enterprise Systems Conference 2
    3. 3. Why Choose Cognosante to support your next MITA 3.0 SS-A?• Cognosante will ensure your MITA SS-A is a valuable, long-term asset that supports your enterprise• Cognosante can bring such extensive MITA SS-A experience including practical MITA application and strategy development• Cognosante has experienced MITA experts and a proven, scalable and flexible MITA approach ensures minimal impact on your organization• Cognosante uses a variety of products to complete the SS-A and can integrate existing state modeling and management systems• Cognosante is currently working on MITA 3.0 assessments in Oregon, Texas, New York, and Arkansas as well as assisting other states in MITA planning 2012 Medicaid Enterprise Systems Conference 3
    4. 4. Cognosante MITA Unmatched Experience Cognosante MITA 2.0/2.01 SS-A and Planning Experience Cognosante Current MITA 3.0 SS-A Projects 2012 Medicaid Enterprise Systems Conference 4
    5. 5. Cognosante MITA 3.0 Assessment Process Summary 2012 Medicaid Enterprise Systems Conference 5
    6. 6. Cognosante MITA 3.0 Assessment Solution Stack 2012 Medicaid Enterprise Systems Conference 6
    7. 7. Cognosante Approach to MITA Concept of Operations 2012 Medicaid Enterprise Systems Conference 7
    8. 8. Cognosante MITA Scheduling Management Phase 2 Phase 2 Calibration Calibration 2012 Medicaid Enterprise Systems Conference 8
    9. 9. MITA Business Area As Is and To Be Maturity Summary Phase 3 Phase 3 Assessment Assessment 2012 Medicaid Enterprise Systems Conference 9
    10. 10. Cognosante MITA 3.0 Scorecard Phase 3 Phase 3 Assessment Assessment 2012 Medicaid Enterprise Systems Conference 10
    11. 11. MITA Business Process Models Phase 3 Phase 3 Assessment Assessment 2012 Medicaid Enterprise Systems Conference 11
    12. 12. Conceptual and Logical Data Models Logical Data Model Phase 3 Phase 3 Assessment Assessment 2012 Medicaid Enterprise Systems Conference 12
    13. 13. Cognosante MITA As Is Technical Architecture Phase 3 Phase 3 Assessment Assessment 2012 Medicaid Enterprise Systems Conference 13
    14. 14. Cognosante Enterprise IT Assessment Phase 3 Phase 3 Assessment Assessment 2012 Medicaid Enterprise Systems Conference 14
    15. 15. Cognosante Reference Model – MITA Strategic Systems Planning Phase 4 Phase 4 Strategy Development Strategy Development 2012 Medicaid Enterprise Systems Conference 15
    16. 16. Cognosante MITA Roadmap Phase 4 Phase 4 Strategy Development Strategy Development 2012 Medicaid Enterprise Systems Conference 16
    17. 17. Questions? The Cognosante Team looks forward to meeting your MITA 3.0 SS-A needs using our unmatched MITA knowledge, experience, and flexible methodology 2012 Medicaid Enterprise Systems Conference 17
    18. 18. Cognosante.comRandy Browning, MITA Program DirectorRandy.Browning@cognosante.com
    1. A particular slide catching your eye?

      Clipping is a handy way to collect important slides you want to go back to later.

    ×