Your SlideShare is downloading. ×
2010.02.05 - IBM PSSC Testing Offerings - Forum SaaS et Cloud IBM - Club Alliances
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

2010.02.05 - IBM PSSC Testing Offerings - Forum SaaS et Cloud IBM - Club Alliances

1,087

Published on

Présentation exploitée par Hervé Sabrié d'IBM GTS [PSSC Center de Montpellier] lors du Forum SaaS et Cloud IBM - Club Alliances - vendredi 5 février 2010.

Présentation exploitée par Hervé Sabrié d'IBM GTS [PSSC Center de Montpellier] lors du Forum SaaS et Cloud IBM - Club Alliances - vendredi 5 février 2010.

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,087
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
27
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • IBM PartnerWorld 2006 02/08/10 06:10 AM 4:3 Aspect Ratio
  • IBM PartnerWorld 2006 02/08/10 06:10 AM 4:3 Aspect Ratio
  • IBM PartnerWorld 2006 02/08/10 06:10 AM 4:3 Aspect Ratio
  • Transcript

    • 1. IBM PSSC - Customer Center Montpellier IBM Customer Center – Montpellier PSSC IBM GTS Testing Activities Solutions testing services from IBM PSSC Montpellier Hervé Sabrié – IBM PSSC Montpellier – Herve_Sabrie@fr.ibm.com Fady El Kaddoum – IBM GTS – Fady.Kaddoum@fr.ibm.com 1Q - 2010 © 2010 IBM Corporation © 2008 IBM Corporation
    • 2. IBM PSSC - Customer Center Montpellier Une variété de tests tout au long du cycle de vie d'un projet Supplier tests Product is validated by the laboratories in a global & generic context Unit Tests Qualification Exploitability Production Implementation, technical & Performance - Scalability Production DEV Installation , ownership & product test functional validation in a – Robustness – deployment « client » context Operability 2 © 2009 IBM Corporation
    • 3. IBM PSSC - Customer Center Montpellier Vous voulez un environnement de tests qui soit … Représentatif Facturé en flexible standardisé prix fixe de la production Personnalisé, Cloud permanent spécifique Facturé à la Modifiable occasionnel puissance consommée à la demande Accessible complexe simple à distance 3 © 2009 IBM Corporation
    • 4. IBM PSSC - Customer Center Montpellier Notre proposition: externaliser l’environnement de test Rapide : Mise en oeuvre rapide basée sur des mécanismes de provisioning et de clonage. Le Client peut spécifier la taille de l’infrastructure requise et le niveau Compétitif: Optimisation des de support attendu. ressources (matériel et personnel). Accès aux technologies de pointe et aux meilleurs experts. Licences IBM et outil de simulation de charge inclus Flexible : Process opérationel allégé pour permettre la prise en compte de demandes de changement (modification Coûts d’infrastructure IT réduits possible en quelques heures ou jours à comparer avec plusieurs semaines dans un environnement client plus contraint. Réactif : quelque soit le type de problème rencontré (matériel, réseau, logiciel), les clients peuvent joindre un Cycle de mise en oeuvre de point de contact unique qui pourra nouveaux projects accéléré activer tout un groupe de spécialistes en fonction de la demande 4 08/02/2010 © 2009 IBM Corporation
    • 5. IBM PSSC - Customer Center Montpellier Les offres de support Tests & Developpement disponibles à IBM Montpellier Les experts, les outils, Accès à distance à la méthodologie pour une plateforme dédiée exécuter les tests Solution et personnalisée Testing Services Remote Infrastructure Services Un environnement Cloud partagé basé sur le Testing modèle Cloud Services computing 5 08/02/2010 © 2009 IBM Corporation
    • 6. IBM PSSC - Customer Center Montpellier Solution Testing Services Approche ‘Traditionnelle’ Remote Infrastructure Services Details Characteristiques Un environnement de test dédié et spécifique Adaptable aux besoins spécifiques de chaque reproduisant tout ou partie d’un client & idéal pour soutenir des “workloads” environnement de production critiques. Très similaire de l’environnement de Offre IBM GTS production cible Remote Infrastructure Testing = Avoir accès à – Même matériel, même niveau de logiciel distance à un environnement personnalisé pour – Même solutions applicatives, jeu de données client une durée pré-définie. Positionnement: − Possibilité d’accueillir plusieurs images – Integration, Migration, Performance, − Durée de 1 mois à > 1 an – Scalabilité, Robustesse − Prix fonction du type et du niveau de ressources mises en oeuvre. Modèle de facturation à la – Tests d’opérabilité consommation possible pour les engagements •Périmètre des tests, methodologie, longues durées. support … Qualif. Solutions Testing Services = Avoir accès aux experts, aux outils, à la méthodologie pour •Formalisation contractuelle réaliser les tests Accord Client/IBM − Bénéfice du transfert d’expertises − Prix fonction du niveau de support et de la durée de •Execution des campagnes de tests Tests la prestation •Livraison des résultats & Conclu démonstration sur site ou à sion distance 6 6 © 2009 IBM Corporation
    • 7. IBM PSSC - Customer Center Montpellier Test Environments Approche Cloud testing In the Cloud Cloud Testing Details Caractéristiques Un environnement partagé pour exécuter des Configurations pré-définies pour standardiser tests et basé sur un modèle de cloud privé l’offre hébergé par IBM Accès rapide à une plateforme sécurisée et isolée Offre IBM GTS – Automatisation et Virtualisation mise en oeuvre PSSC Cloud Testing = Avoir accès à distance à pour accélérer le déploiement et faciliter l’accès – Environnement matériel partagé un environnement de tests pré-défini – Niveaux d’OS & de middleware pré-définis − Disponible sous 24h – Nécessite une personnalisation par l’utilisateur − Approprié pour une durée de 1 à 6 semaines (application & jeu de données spécifiques) − 5 configurations possibles: − z/OS, Positionnement: − Linux sur System z, – Developpement & tests unitaires / functionels, − Oracle Solutions sur System z, Tests d’intégration, de validation d’Architecture, − P6 Power partitions, Tests d’Opérabilité, Proof-of-Concept, − System x (Win/Linux/Vmware) Performance / tests de scalabilité limités − Possibilité d’associer un environnement Rational Performance Tester à la configuration − Prix fixe / semaine 7 7 08/02/2010 © 2009 IBM Corporation
    • 8. IBM PSSC - Customer Center Montpellier Nous pouvons activer… zOS configuration • Single z/OS V1.10 LPAR, 4 to 6 CP Shared, 6 GB or 8 GB Memory, 600 GB storage (system and userdata) , set of software is installed (DB2, WebSphere Application Server, WPS, Message Broker, ESB, CICS, MQ & monitoring tools). Linux on System z configuration • one guest hosted on a z/VM LPAR; up to 4 CP shared, 4 GB memory, up to 14 GB storage; software code (WebSphere, Oracle, DB2…) downloadable from a NFS. SUSE and Redhat versions of Linux are available. Modèle d’engagement Oracle solutions on System z configuration • Oracle AS on one Linux guest + Oracle RAC 10g on 2 Linux • Sélection de la configuration cible guests (cluster), 4 CP per Linux guest, 4 GB memory, up to Choix 300 GB storage. • Formalisation contractuelle Client/IBM P6 Power partitions configuration Contract • P6, from 1 to 4 partitions, up to 12cpu, up to 128GB memory, 100GB internal disks + up to 1TB external disks. • AIX 5.3 or 6.1or Linux on Power (SLES 10 or RedHat 5.1) + • Accès automatisé à l’environnement DB2 v9 or Oracle 10g, 11g, 11gRAC, WAS 6.1 Provision de tests System x configuration – HS22 Blades or x3950M2 • Blade Servers HS22 (Nehalem 2.93GHz, 24GB of memory , HS21XM 3 GHz, • Assistance 2° niveau possible 16 GB mem), running Win2003/2008, Red Hat Linux® Advanced Server 5 / Execution SUSE® Linux Enterprise Server 10, VMware® ESX Server 3.5 or Microsoft® Hyper-VTM • x3950M2 4 sockets 6 cores 2.6 GHz CPUs, 128 GB mem running on Win2003/2008, Red Hat Linux® Advanced Server 5 / SUSE® Linux Enterprise Server 10, VMware® ESX Server 3.5 or Microsoft® Hyper-VTM 8 08/02/2010 © 2009 IBM Corporation
    • 9. IBM PSSC - Customer Center Montpellier IBM GTS : une alternative crédible pour votre stratégie de test. Supplier tests Product is validated by the laboratories in a global & generic context Unit Tests Qualification Exploitability Production Implementation, technical & Performance - Scalability Production DEV Installation , ownership & product test functional validation in a – Robustness – deployment « client » context Operability 9 © 2009 IBM Corporation
    • 10. IBM PSSC - Customer Center Montpellier Atelier Technique : - Récapitulatif des modèles d’engagements - Quelques exemples … 10 08/02/2010 © 2009 IBM Corporation
    • 11. IBM PSSC - Customer Center Montpellier Engagement model – various alternatives to match your client needs 1/ Access to a catalogue of standard services – Cloud testing offerings with pre-defined, standardized configurations available – based on shared resources – Fixed price per week and per configuration: from 3.5 to 7.5 keuros / week – One working day of elapsed time to get access to the selected configuration – Limited support provided – Client must be self sufficient – Suitable for limited test requirements (quick validation, code optimization, integration, functional test, limited performance) – 5 possible configurations with pre-defined level of OS & middleware components − z/OS, − Linux on System z, − Oracle Solutions on System z, − P6 Power partitions, − System x (Win/Linux/Vmware) 11 © 2009 IBM Corporation
    • 12. IBM PSSC - Customer Center Montpellier Engagement model – various alternatives to match your client needs 2/ Access to a permanent platform with optional services – Suitable for mid-term and long-term support – Possibility to tailor the environment to the client needs from a simple to a very complex test bed. – Pre-defined & agreed level of support (permanent or on- demand) – Possibility to charge the client as a ‘one-time’ charged (from 100k€ to >1M€) or to use a ‘pay-as-you-go’ model based on resources consumed – Example of optional services charged upon usage : • Add extra cpu or memory capacity • Add extra storage capacity • Add additional adapters or servers to the baseline configuration • Benefit from specific expertise in OS or middleware tuning 12 • © 2009 IBM Corporation
    • 13. IBM PSSC - Customer Center Montpellier Engagement model – various alternatives to match your client needs 3/ Access to a customized environment – Suitable for traditional “strategic” testing – “On-time” operation during a specific pre-defined timeframe – Possibility to tailor the environment to the client needs from a simple to a very complex test bed. – Pre-defined & agreed level of support – Fixed price based on hw, sw, resources & duration – from 50k€ to x00k€ 13 © 2009 IBM Corporation
    • 14. IBM PSSC - Customer Center Montpellier Remote Infrastructure Services Example #1 : Remote Testing infrastructure The Customer Needs (French Telecommunication Cie) Offload testing activities from their datacenter due to capacity contrainsts Benefit from PSSC expertise on Power & Storage performance & tuning Long term partnership over multiple years with annual reconduction The Project Library TS3500 SERVERS p5-595 - 64 W – 512 2 Drives LTO3 INJECTION ADMIN VLAN GB VLAN • Recreate test bed for CRM application based VLAN on Power/DS8K platforms Router R • 3 years collaboration FT Dispatcher • New versions validation prior going live Cluster SVC • Capacity planning tests with workload simulation HMC Dispatcher SAN • Explore new Power Virtualization features FT Switches 2 Bladecenters R 27 Intel Blades The Results P6-P570 – 32 W – 384 GB DS8000 • Relief of datacenter & people load at customer 16 Ranks - 40 TB • Very high customer satisfaction 14 08/02/2010 © 2009 IBM Corporation 14
    • 15. IBM PSSC - Customer Center Montpellier A ”fold – unfold” concept leveraging virtualization techniques (1/2) Independent infrastructures Project dependancy Each project is independent from each 100MB ADMIN PROJECT A : Metrology 100MB INTERNE 100MB INJECT VLAN x VLAN x VLAN x ONN injection AS p595 – 32w – 128GB DS-4800 other. System measurements can be performed CTRL 1 TB QALOAD AS01 INJ 02 INJ 03 AS02 INJ 04 SWITCH INJ 05 AS03 without impacting the others. INJ 06 EN LIGNE FLASH COPY INJ 07 AS04 500GB 500GB ALTEON DS1 2 AS01 ~ AS04 : Application Servers AIX 5.3 – 4.5cps - 24GB DS01 : Data Server AIX 5.3 – 8.5cps – 19GB PROJECT B : Metrology HMC Complexity, installation 100MB ADMIN 100MB INTERNE 100MB INJECT VLAN x VLAN x VLAN x ONN injection AS p595 – 32w – 128GB Complex architecture to be setup. DS-4800 Heavy maintenance. CTRL 1 TB QALOAD AS01 INJ 02 INJ 03 AS02 INJ 04 SWITCH INJ 05 AS03 Servers, networks & partitions multiplied. INJ 06 EN LIGNE FLASH COPY INJ 07 AS04 500GB 500GB ALTEON DS1 2 AS01 ~ AS04 : Application Servers AIX 5.3 – 4.5cps - 24GB DS01 : Data Server AIX 5.3 – 8.5cps – 19GB Cost reduction PROJECT C : Metrology HMC 100MB ADMIN 100MB INTERNE 100MB INJECT VLAN x VLAN x VLAN x ONN injection AS Resources are charged for each p595 – 32w – 128GB individual project, with no scale factor DS-4800 CTRL 1 TB QALOAD AS01 INJ 02 INJ 03 AS02 INJ 04 SWITCH reduction. INJ 05 AS03 INJ 06 EN LIGNE FLASH COPY INJ 07 AS04 500GB 500GB ALTEON DS1 2 AS01 ~ AS04 : Application Servers AIX 5.3 – 4.5cps - 24GB DS01 : Data Server AIX 5.3 – 8.5cps – 19GB HMC 15 08/02/2010 © 2009 IBM Corporation
    • 16. IBM PSSC - Customer Center Montpellier A ”fold – unfold” concept leveraging virtualization techniques (2/2) Shared infrastructure 2 Project dependancy 100MB INTERNE 100MB INJECT VIRTUAL IO SERVER 100MB ADMIN VLAN 105 VLAN xx VLAN xx SPAS SERVEUR 1 ws is bs01 as 2 Requires a centralized approach to p595 – 64w – 256GB db01 FT Pool d’injection VIRTUAL IO SERVER 2 handle project planning. Every project 10.173.110.0 must be synchronized with this approach OASP ws as SWITCH SERVEUR 2 is01 bs01 p595 – 64w – 512GB DS-8300 2 to switch to the ‘metrology’ mode. db01 22 TB E-FORCE as01 2 ALTEON is01 bs01 2 2 db01 3 318 2 admin VIRTUAL IO SERVER Switch SAN CHORUS Complexity, installation 2 ws as R2F21 is01 bs01 SERVEUR 3 p595 – 64w – 512GB db01 2 HMC HMC PARSIFAL SERVEUR 4 is01 as01 bs01 2 DS-8300 Architecture easier to maintain, using db01 22 TB virtualization techniques. p570 – 16w – 128GB VIRTUAL IO SERVER 2 Switch between the ‘unfold’ and ‘fold-up’ PROJECT A modes & vice versa, using simple scripts. PROJECT B PROJECT C 1st metrology “fold-up” “fold-up” period Cost reduction Shared resources. ‘Unfold’ projects use the minimum resources while the PROJECT A PROJECT B PROJECT C “fold-up” metrology “fold-up” ‘monitored’ project can leverage higher capacity. 2nd period 16 08/02/2010 © 2009 IBM Corporation
    • 17. IBM PSSC - Customer Center Montpellier Solution Testing Example #2 : Solution Testing engagement Services The Customer Needs (Spanish Insurance Cie) Validate dual site implementation of their ERP solution required due to new business regulations Evaluate target distance for second site implementation (10 & 20 kms) The Project z10 E26 DS8300 22 TB Network • 2 months duration Admin • Production system cloned with NDA SITE A • Tests based on a DB2/zOS CICS CF 1 FICON SWITCH 4Gb environment with Sysplex, targeting z/OS 1.9 SITE response time DB2V8 CICSTS31 A Injection pool DWDM The Results SITE B Remote • Customer delighted – skill transfer : Access CF 2 ISL knowledge on sysplex implementation SITE • Decision to move to dual site z/OS 1.9 DB2V8 FICON B CICSTS31 • Faster Production implementation SWITCH 4Gb Injection Network 17 © 2009 IBM Corporation
    • 18. IBM PSSC - Customer Center Montpellier Solution Testing Example #3 : Solution Testing engagement Services The Customer Needs Reduce maintenance cost & optimize overall datacenter operability Reduce infrastructure acquisition cost leveraging green technology Validate InfiniBand architecture to support growing business needs The Project • 1 month duration for the test • Performance & Scalability validation of the end-to-end platform architecture (BCH, VOLTAIRE, LSI) based on Oracle RAC inside an IBM blade center system with full InfiniBand connectivity. The Results • Substantial TCO savings achieved while improving end user experience : 50 to 90% replacing SMPs with IB Cluster • strong technology integration of the infrastructure : Scalability, Power savings, Simplified management, Higher server utilization 18 08/02/2010 © 2009 IBM Corporation
    • 19. IBM PSSC - Customer Center Montpellier Cloud Testing Example #4 : Cloud Testing engagement The Customer Needs Access quickly to a test bed environment to perform a functional validation with limited performance tests, of a brand new solution product, prior to integrate it into the final customer production system. The Project • Remote access to a zLinux on Mainframe configuration provisioned within a day • 2 weeks test duration The Results • All product functionalities tested without taking care of sub-systems intallation & configuration • 80% cost savings : no installation cost, reduced labor for configuration, no capital expense • Test cycle time reduced significantly 19 08/02/2010 © 2009 IBM Corporation

    ×