Pcts Proj Service

  • 1,233 views
Uploaded on

PCTS Presentation

PCTS Presentation

More in: Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
No Downloads

Views

Total Views
1,233
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
13
Comments
0
Likes
1

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. First Solutions Limited Data Division
  • 2. PPS Data Solutions History PPS Data Solutions Limited (PDSL), operates as a joint venture company originally formed in 2003 between John Cameron (PCTS Developer) and The PPS Group. The company holds all software rights to the PCTS application. The company was originally formed as a 50 / 50 partnership serving the Chinese Energy Industry and has since partnered in other regions with PPS Group companies. PPS Group companies have supplied PCTS via distribution agreements where the PPS Group Companies issue the PCTS licences to respective clients since 2004. PPS Data solutions provide all support and maintenance to the PPS group companies relating to PCTS supply and servicing..
  • 3. PPS Data Solutions Structure PPS Data Solutions (Software Owner) PPS Group (PCTS Distributor) FSL (Software Licencee) PPS Nigeria Ltd (Software Licencee)
  • 4. FSL Data Division History First Solutions Limited (FSL), operates as a joint venture company originally formed between China Offshore Oil Nanhai East Corp (subsidiary of CNOOC) and The PPS Group. Serving the Chinese Energy Industry, the synergies between these companies brings together proven leading edge technology and expertise, with Chinese knowledge, market insight, and cost advantages. Initially developed in the North Sea by engineers, for engineers, FSL Data Division offers Contractors, Fabricators, and Operators a range of low cost, project control and maintenance management information solutions, designed to deliver real commercial and operational benefits.
  • 5. PCTS modules have previously been adopted by both ELF Exploration (Paris) and Total Fina (Paris) for use on their projects prior to their merger. The system was exclusively used on the Elf Elgin PUQ (UK 2000) and subsequent hook up, Girassol (Angola 2001), Total’s South Pars projects (Korea & Iraq 2001), Enel Power’s Jebil Ali Phase 3 (UAE 2002). 2003 - Devon Energy China Ltd, (Panyu 4-2 and Panyu 5-1), 2004 CNOOC China Ltd, and CCLS (CNOOC Shenzhen) for the HuiZhou Terminal. 2005 – Present: SPDC (Nigeria) for the Okoloma gas to power projects. Main contractors include Barmac/Halliburton/KBR (UK) , Hyundai (Korea)  TPG (Paris), Enel Projects, (Milan), Alcon (Nigeria). Engineering companies having utilized the software to satisfy project deliverables include: MacDermotts, (Wembley and Nigg Bay), TPG Engineering (Technip) (Paris & Nigg), Bougyues Offshore (Paris and Korea), Foster Wheeler (Paris), Impac Offshore (Hamburg), Saipem (Okoloma project, Nigeria). PCTS History
  • 6. Areas of Operation - Modules - Typical Users Vendor Document Control - Europe Project Workscope Co-Ordination - Europe, Africa, Asia Job Carding / Task Management - UK and Caspian Region
  • 7. Areas of Operation - Modules - Typical Users QA/QC Systems Management & Tracking - UK, North Sea, & Norway Maintenance Management - CMMS Modules - UK, North Sea, & China
  • 8. Quotes :
    • “ Your company’s commitment, support and level of service during the onshore phases of the project (Elf Elgin PUQ), including the transition and mobilisation of the Flotel from Norway has proved invaluable to the Alliance. Thank you once again for a job well done”
    • Trevor Hauxwell, Project Business Manager. KBR Caledonia Limited.
    • “ I would like to thank you for all your time, effort, and the expertise you brought to the group, for your quick response in all the development work and delivering a certification system which in real terms gave more benefits than was ever anticipated. Your support to PCTS and the project in general was acknowledged at the highest level, particularly when more and more managers and engineers understood the benefits to be had from the system, especially it's strong and varied reporting / punch-list capabilities..” Jim Hutcheson, QHSE Manager, Halliburton.
    • “ I’d like to thank you for FSL Data Division’s efforts over the past year on our Panyu field. Your commitment to service has delivered real business benefits to Devon Energy China Ltd. And we continue to value your ongoing support in achieving our operational objectives.”
    • T.M. Linehan, Operations Manager DECL .
    •  
    • “ PlanMS is powerful but simple to use and really helps us get the Job Done”
    • Chen Chi, Panyu Field Maintenance Planner .
  • 9. Problem Definition   The following diagrams identify project stages and trace the ultimate root of common problems faced by project management teams during large-scale construction contracts involving plant and equipment.   Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases
  • 10. Major Problem Causes Primary Problem Roots   Typical Problems through the Phases “ Project overruns on initial cost objectives can attain as much as 100%” “ We underestimated the complexity and the technical challenge” “ It is evident that the risk of additional cost overruns has increased dramatically” FSL Data Division provide effective solutions to increase project control and minimise failure. Ultimate Problem Root Quality Control / Information Supply Failures   Vendor Equip. not Installed or inspected to spec.   Rotating Equipment not Installed or inspected to spec.   Vessels, Pipework not Installed or inspected to spec.   Instrument/ Electrical Equipment not installed/ tested to spec   Planning/ Engineering Difficulties   Lack of confidence in general information   Incorrect Maintenance Procedures and lack of Vendor manuals   Invalid Certification and Misinformed Indexes/ Schedules Poor Quality Installation Poor Quality Documentation Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures
  • 11. Impact of Data Problems
  • 12. Solutions   The PCTS solution is a combination of documentation, software, and services, designed to assist Engineering Management teams throughout the project lifecycle or specific phases of a complex contract.         By utilising our implementation experience to assist the delivery process we can ensure that introducing this technology becomes an operational advantage and not a commercial burden. Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations PCTS PlanMS Project Phases Documentation – Training – Applications - Support
  • 13. Solutions Through the Phases * Solutions Supply or Review of Project Completions Management and Organisation Procedures Induction Training for Project Management Teams Implementation Support for Key Project personnel or Supply if necessary Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
  • 14. Solutions Through the Phases * Solutions Basic Quality Induction for Inspectors, Supervision, and General Workforce. Preparation and Planning Induction for Project Management Teams Progress Control and Management Feedback via PCTS Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
  • 15. Solutions Through the Phases Solutions * Co Ordination and Implementation Induction for Project Management Teams Completions Activities Directed by Commissioning Needs via PCTS Scheduling. Outstanding Work (Punchlist) and Acceptance Control via PCTS Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
  • 16. Solutions Through the Phases Solutions * Acceptance and Handover Induction for Project Management Teams Completions Status Feedback and Start Up Work Front Control Via PCTS. Start Up Plan and Co Ordination Assisted Via PCTS Project Status Visibility Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
  • 17. Solutions Through the Phases Solutions * Close Out And administration Induction For Project Management Teams Outstanding Work Control and Completion Managed Via PCTS Data Handover / Transfer from PCTS to CMMS Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
  • 18. PCTS Documentation
    • Methodology for Precommissioning and Commissioning Organisation.
    • Activity Classification for Precommissioning, Commissioning, and Startup.
    • Precommissioning Procedure.
    • Commissioning Procedure.
    • P.C.T.S. Application Specification.
    • Completion Activities Management.
    The PCTS system is backed up by established documentation covering organisation, methodology, and procedures for use during major projects. These are offered to compliment existing procedures or can be tailored to structure activity management for specific situations. The documents also detail and specify software use within a particular project environment. By adopting the documentation a company can immediately standardise their pre-commissioning / commissioning operations both internally and externally covering :
  • 19. Project Training : Basic Project Management Induction
    • Policy & Standards Setting
    • Preparation & Planning
    • Project Status Tracking & Quality Control
    • Commissioning Co-ordination & Implementation
    • Project Completion & Administration
    As well as system user training, we can provide training for Engineering Management covering the following activities during projects:
  • 20. Project Training : Basic Project Quality Induction This is offered to clients to avoid problems encountered during inspection/commissioning activities industry wide. It is primarily aimed at the general workforce with a complimentary equivalent for inspection and supervision teams. The aim is to attempt to get the quality of work improved on a “doing it right first time” approach. Client project specification/procedures and materials to be used are reviewed and incorporated within the course. The subjects covered have been identified as common problems throughout the world. These include:
    • Ex Equipment / Cables & Glanding
    • Instrument support & fixing / Small bore instrument tubing
    • Flange make up & management / Site run piping & pressure testing
    • Trace heating / Insulation
  • 21. PCTS (Project Completions Tracking System)
    • Policy & Standards Setting
    • Preparation & Planning
    • Project Status Tracking & Quality Control
    • Commissioning Co-ordination & Implementation
    • Project Completion & Administration
    The PCTS provides support for Engineering Management through any or all of the following activities during projects: By managing your knowledge base and delivering fully integrated knowledge flows, we ensure that data disconnects are bridged and sub-optimal information silos are replaced.
  • 22.
    • Efficient data collation
    • Automation of tasks
    • Minimised workflow processes
    • Key Performance Indicator (KPI ) feedback
    • Informed decision making
    PCTS (Project Completions Tracking System) The overall function of the system shall be to monitor / control construction and commissioning status, progress and QA/QC handover / acceptance data. The system shall deliver cost and time savings to management teams through;
  • 23. PCTS Contact Details FSL Data Division, 4K2 Times Plaza, No. 1 Taizi Road, Shekou, Shenzhen. Guangdon. People’s Republic of China [email_address] [email_address] [email_address] E-mail E-mail E-mail Nig. Mob. +234 (0) 805 827 6556 Ch Tel +86 (0)13410172172 Tel + 44 (0) 7880800220 Tel +234 (0)84 461587 FSL Data Division Systems Consultant PPS Data Solutions Ltd. Commercial Director PPS Nigeria Ltd. Managing Director John Cameron David Hemphill Sunday Omueti