Your SlideShare is downloading. ×

Energy Efficiency Management

318

Published on

Published in: Technology
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
318
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
16
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Energy Efficiency Management Essam AbdElaal Connected Energy Network service Unit© 2011 Cisco and/or its affiliates. All rights reserved.
  • 2. • Energy Market overview • EOS Overview • Sample Reports. • Q&A? Agenda© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 2
  • 3. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 3
  • 4. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 4
  • 5. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 5
  • 6. Source: IDC© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 6
  • 7. ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? how much power is used or where it’s being used© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 7
  • 8. Environment Data Center Regulatory Corporate Requirements Citizenship Escalating Competitive Energy Prices Pressures© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 8
  • 9. • Turkey© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 9
  • 10.  According to the Uptime Institute, the typical data center has an average PUE of 2.5. Transmission Towers Power Sub-Station  The EPA estimates that the typical enterprise dataPower Plant center had a PUE of 2.0 or higher.  Assuming a PUE of 2.5 means for every 1W of ICT load 2.5W is consumed by the building load. Residential  Uptime estimates most facilities could achieve 1.6 PUE using the most efficient equipment and best Transformers Commercial Facility practices. Industrial Facility  Energy usage by ICT asset is typically not networked or managed today Smart Load Implications: Data Center Example Total Facility Power AHU Chiller Cooling 3% Tower 8% 2% Cooling 1% Lighting Plant 1% Unit Sub-Station Medium Voltage 3% 5% 25% Facility Switch Gear XFMR - PDU Pumps Humidifier UPS Sub-Station 2% Lighting Compute Storage IT 3% Data 35% CRAC Equipment Center 1% 1% 45% Medium Voltage Unit Sub-Station Network Stand-By 5% UPS Generator Switch Gear XFMR - PDU © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 10
  • 11. •No single Energy Mgmt across domains •Consuming energy 7x24x365 •Difficult to measure and manage •Users don’t turn off equipment •~30% servers are not used (IDC 2012) •~8-12% average server utilization •Difficult to identify top energy consumers Distributed Office •Power-constrained data centers Data Center Network Facilities© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 11
  • 12. • Energy Market Overview • EOS Overview • Sample Reports. Agenda • Q&A?© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 12
  • 13. • Energy Management Drivers & Trends • What are we offering ? • EOS limited promotion • Call to action Agenda • Q&A© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 13
  • 14. Site VisitEngagement Schedule Service Delivery Schedule Phase 1 Phase 2 Phase 3 Phase 4 Energy Discovery Operations Analysis Domain Creation • Power Billing Program Workshop • Network • Capacity Management • Compute Development • Remote Access • Scoping • Data Centers, Labs, • Storage Required • Organizational Analysis Offices • Reporting • Implement Monitoring • Incentives & Funding • Sustainability Goals • Control Policy • 1-4 Week Sampling • Sponsorship • Demand Response Preferences • Building Management Business Case • Data Analyzed & Architectural Assessment Efficiency Analysis • Presentation of Analysis • Virtualization Delivery Findings • Network • Pilot Results • Shutdown • Compute • Program Dashboard • Spindown • Storage • Domain • Physical Redesigns • Appliances Recommendations • Best Practices • CRAC • Policy • Building Mngmt System Recommendations • 12 Months Licensing Deploy Discovery Interview & Analyze Analyze & Design Develop & Transfer Tools Savings Operations Architecture Infrastructure High Level Pilot Discovery Program Plan Projection Assessment Assessment Assessment Design Implemented© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 14
  • 15. Architectural Overview Enterprise Ent. Energy Energy manage Mobile Reporting Employee Portal r• Cloud and on premise GPS Energy Manager Energy Non-IP Manager PoE Non-PoE - Fieldserver IPMI SNMP - Cisco Mediator • Discovery & Measurement WMI Web BackNET - Echelon • Analysis & Simulation vPro Services Cisco Intel DCM LonWorks • Policy & Control SSH ModBUS EnergyWise • Reporting & Decision Support Devices & Systems Data Center Facilities • Need on premise access Distributed Office Data Center Facilities (i.e. through UCS or ISR) © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 15
  • 16. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 16
  • 17. Different Dashboards for Different Stakeholders © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 17
  • 18. • Laptop/Desktop/Phone ~50W, 200W, 8W• Round the Year Kwh? => Wh*365*24/1000 => 438(PC), 1752(Server), 70(Phone) Cost? ($, 0,1$/kwh) 43,8/175,2/7 Multiply by number of Devices, substract non-running Cooling? => Wx2 Carbon? (~0,15kg/kwh)• Typical Numbers Min. 30% of DO-devices left running, …© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 18
  • 19. Operational SavingsDistributed Campus Devices Per 1000 Employees Working 9 Hours a Day, 5 Days a Week… Annual Energy Cost Annual Savings per Annual Savings Total Savings by Device Device Desktop $95 50-60% $50-60 $33,962 Laptop $35 10–20% $6-8 $1,837 Monitors $30 50-60% $15-18 $10,725 PoE AP $12 50-60% $6-7 $330 IP Phones $7 50-60% $4-5 $3,850Results in up to $50K (~50%) in Savings Annually (per 1000 employees) *Estimates 65% desktops, 35% laptops, 1 AP for every 20 employees, everyone has an IP Phone Results vary based on what, if any, energy management solution is previously in place; Assumes $0.12 per kWh (kilowatt-hour). Based on powering down 10 hours/night, 24 hours on weekends. Laptops are 10-20% based on low percentage left in office at night and weekends. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 19
  • 20. • Energy Market Overview • EOS Overview • Sample Reports. Agenda • Q&A?© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 21
  • 21. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Network CollectorDiscover & Benchmark SNMP, vPro, EnergyWiseAsset Discovery Compute ACTIVE + DYNAMIC Discovery Activities Network Collector Deployment Site Visit Profile Analysis 1. Hosting Service Team Benchmarking a. Identify dedicated or virtual machine Physical Virtual Rob Aldrich Desktops b. Deploy Energy Management ApplicationPhase 2 Servers Servers Team & LeadDomains & Reporting Architect Network Collector 2. Discovery EnergyWise, Statistical Derivation a. Determine aggregation strategy Energy ExpertDomain Creation b. Launch network discovery tool Network Mark Davidson ACTIVE + DYNAMIC Discovery Systems Engineer M&E Alignment 3. Aggregation a. Level 1 domain creation Application Expert Reporting b. Form associations for Parent > Child > Entity Emmanuel Tychon Energy Architect Optimization Switch Route Switch-Route- 4. Access Compute Deployment LeadPhase 3 a. Establish and/or expand credentialsOperate & Transfer Network Collector b. Establish Cisco Service remote access Smart PDU, Branch Circuit Monitoring Operations Storage DYNAMIC + STATIC DiscoveryEMaaS ProgramService Transfer Network Tape Disk Attached © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 22
  • 22. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Network CollectorDiscover & Benchmark SNMP, vPro, EnergyWiseAsset Discovery IT Load and Building Load Electrical Utilization Profile Analysis BenchmarkingPhase 2Domains & ReportingDomain Creation M&E Alignment Reporting OptimizationPhase 3Operate & Transfer OperationsEMaaS ProgramService Transfer Power Usage Effectiveness Report 1.1 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 23
  • 23. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Network CollectorDiscover & Benchmark SNMP, vPro, EnergyWiseAsset Discovery IT Load Power Allocations Electrical Utilization by Hardware Platform Profile Analysis BenchmarkingPhase 2Domains & ReportingDomain Creation M&E Alignment Reporting OptimizationPhase 3Operate & Transfer OperationsEMaaS ProgramService Transfer IT Asset Energy Allocation Report 1.2 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 24
  • 24. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Network CollectorDiscover & Benchmark SNMP, vPro, EnergyWiseAsset Discovery IT Load and Building Load Electrical Utilization Profile Analysis BenchmarkingPhase 2Domains & ReportingDomain Creation M&E Alignment Reporting OptimizationPhase 3Operate & Transfer OperationsEMaaS ProgramService Transfer Establish & Validate Benchmarks Report 1.3 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 25
  • 25. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Network CollectorDiscover & Benchmark SNMP, vPro, EnergyWiseAsset Discovery Compute + Storage + Network Electrical Utilization Profile Analysis BenchmarkingPhase 2Domains & ReportingDomain Creation M&E Alignment Reporting OptimizationPhase 3Operate & Transfer OperationsEMaaS ProgramService Transfer Establish & Validate Benchmarks Report 1.4 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 26
  • 26. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Network CollectorDiscover & Benchmark SNMP, vPro, EnergyWiseAsset Discovery Compute System Utilization Profile Analysis BenchmarkingPhase 2Domains & ReportingDomain Creation M&E Alignment Reporting OptimizationPhase 3Operate & Transfer OperationsEMaaS ProgramService Transfer Establish & Validate Benchmarks Report 1.5 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 27
  • 27. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Energy Manager Set UpDiscover & Benchmark Establishing Logical Energy Domains Cloud Energy ManagementAsset Discovery Monitoring, Reporting & Integration Profile Analysis Considerations Benchmarking CriticalityPhase 2Domains & Reporting ApplicationDomain Creation Use Case M&E Alignment Division Reporting Admin Optimization LocationPhase 3Operate & Transfer OperationsEMaaS ProgramService Transfer Energy Domain Design Report 2.1 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 28
  • 28. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Energy Manager Set UpDiscover & Benchmark Establishing Logical Energy Domains Facilities AlignmentAsset Discovery Associate IT Load to Facilities Load Profile Analysis BenchmarkingPhase 2Domains & ReportingDomain Creation M&E Alignment Reporting OptimizationPhase 3Operate & Transfer OperationsEMaaS ProgramService Transfer Facilities Integration Design Report 2.2 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 29
  • 29. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Energy Reporting Set UpDiscover & Benchmark Energy Monitoring Customized ReportingAsset Discovery Templates Considerations Key Performance Metrics Profile Analysis Benchmarking CostPhase 2 CapacityDomains & Reporting EfficiencyDomain Creation Division M&E Alignment Utilization Reporting Platform OptimizationPhase 3 AdminOperate & Transfer Location Operations GHGEMaaS ProgramService Transfer Energy Reporting Template Report 2.3 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 30
  • 30. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Energy OptimizationDiscover & Benchmark Establishing Governance Efficiency RecommendationsAsset Discovery Capacity & Control Policy Considerations Evaluation Profile Analysis Usage BenchmarkingPhase 2 UtilizationDomains & Reporting CoolingDomain Creation Physical M&E Alignment Load Reporting Adaptive Modeling OptimizationPhase 3Operate & Transfer OperationsEMaaS ProgramService Transfer Systems Utilization Assessment Report 2.4 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 31
  • 31. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Energy ProgramDiscover & Benchmark Establishing Energy as a Service (EaaS)Asset Discovery Programmatic Support Knowledge Transfer Profile Analysis Carbon Accounting Benchmarking Chief Financial OfficePhase 2Domains & ReportingDomain Creation $ $ Energy Manager M&E Alignment IT Department Facilities Department Reporting Cisco Services Optimization Partners BuildingsPhase 3Operate & Transfer Compute Storage Network OperationsEMaaS ProgramService Transfer Organizational Alignment Report 3.1 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 32
  • 32. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Energy ProgramDiscover & Benchmark Establishing Energy as a ServiceAsset Discovery Scaling the Program Strategic Planning Profile Analysis Considerations Benchmarking CampusPhase 2Domains & Reporting BranchesDomain Creation Data Centers M&E Alignment eGRID Reporting Smart Grid Optimization BC/DRPhase 3Operate & Transfer OperationsEMaaS ProgramService Transfer Energy Management Program Strategic Roadmap Report 3.2 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 33
  • 33. Project DeliverablesEOS 0-4 Months 4-8 Months 8-12 MonthsProject Methodology Activities & Deliverables Activities & Deliverables Activities & DeliverablesPhase 1 Energy ProgramDiscover & Benchmark Establishing Energy as a ServiceAsset Discovery Scaling the Program Strategic Planning Profile Analysis Monitoring Control Policies Reporting BenchmarkingPhase 2 Compute Time of Day DivisionDomains & ReportingDomain Creation Storage Location Based Asset Type M&E Alignment Network Event Based Location Reporting Optimization UPS Load Adaptive System UtilizationPhase 3Operate & Transfer Cooling Systems Smart Grid Individual Operations Costs Opt-in Costs & GHGEMaaS ProgramService Transfer Energy Optimization Service Guide Report 3.3 © 2012 Cisco and/or its affiliates. All rights reserved. © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 34
  • 34. Q&A© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 35
  • 35. • Cisco EnergyWise Design Guide http://www.cisco.com/en/US/solutions/ns340/ns414/ns742/ns815/landing_energywise.html• Energy Management “How to” Guide: IP-Enabled Energy Management: A Proven Strategy for Administering Energy as a Service. Rob Aldrich, John Parello, Wiley Press, 2010 www.ipenergyservices.com or Google “IP Energy Book” • Cisco on Cisco Case Study White Paper: Implementing Energy as a Service http://www.cisco.com/en/US/prod/collateral/switches/ps5718/p s10195/CiscoEMSWhitePaper.pdf • Energy Management Services Data Sheet http://wwwin.cisco.com/etg/smartgrid/files/services_energy_ma nagement.pdf© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 36
  • 36. Thank you. www.cisco.com/go/EnergyWise www.cisco.com/go/efficiency

×