Bowen
Upcoming SlideShare
Loading in...5
×
 

Bowen

on

  • 725 views

 

Statistics

Views

Total Views
725
Views on SlideShare
725
Embed Views
0

Actions

Likes
0
Downloads
6
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Bowen Bowen Presentation Transcript

  • Anne Arundel County Phase II WIP Choose Clean Water Chesapeake Bay Restoration Conference January 11, 2011
  • (1) WWTPs Upgrading WWTPs to Enhanced Nitrogen Removal Capacity (2) Septic Systems Sanitary Sewer Extensions and Satellite Cluster Systems (3) Stormwater Retrofits Stormwater Outfall Restoration Stormwater Pond Restoration (4) Headwater Stream Erosion Prevention Stream Channel Restoration Ephemeral Channel Restoration Anne Arundel County Core Implementation Strategy
  • Degraded Stream Conditions
  • Restored Stream Stability Restored Hydrology within Floodplains and Streams Restored Biological Health of Streams Compliance with Water Quality Standards Ultimate Goals
  • Step Pool Stormwater Conveyance (SPSC) Restoration Strategy
  • County WWTPs ( ≈ $270,000,000) Sanitary Sewer Extensions and Satellite Cluster Systems ( ≈ $800,000,000) Stormwater Retrofits ( ≈ $400,000,000) Headwater Stream Erosion Prevention ( ≈ $400,000,000) TOTAL ESTIMATED COST: $1.87 Billion What is the Potential Cost to Anne Arundel County?