Filming – sunday 4th march

356 views
308 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
356
On SlideShare
0
From Embeds
0
Number of Embeds
185
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Filming – sunday 4th march

  1. 1.  Today our group did filming in the Park at South Norwood Lakes. One member of our group, Emily, was not able to attend the filming as she had other plans, and so myself, Lauren and Kerry done the filming. We was originally supposed to go to Brighton for our filming and four boys were also supposed to be attending the filming as they are part of our music video. However, three of the boys told as at short notice, a day before filming, that they were no longer able to attend. This then caused a problem but we decided to film without them and thought of other ideas as we needed to get as much filming done as possible. The weather was a bit of a problem as well as it was very windy and heavily raining but we solved this by covering the camera and a tripod with umbrellas and putting the tripod on a blanket. This worked and we managed to get some filming done.

×