  1. 1. C270 (HK BIODIESEL PLANT) Safety Report C270 Monthly Safety Report – July 2013
  2. 2. Safety : Contribution from All Level ( Top to Shop ) SAFETY STATISTICS Jun 2013 Jul 2013 Accumulated Man-hour 724,254 772,884 Days worked from Commencement 599 630 Accumulated Man-day Lost 1357 1446 Cumulative Accident Frequency Rate 0.69 0.78 C270 Monthly Safety Report – July 2013
  3. 3. SAFETY INSPECTION / MEETING Physical site safety walks C270 Monthly Safety Report – July 2013
  4. 4. SAFETY INSPECTION / MEETING Weekly Safety Meetings with Safety Representatives of Subcontractors C270 Monthly Safety Report – July 2013
  5. 5. AREA NEED IMPROVEMENT FALL FROM HEIGHT – Insufficient fencing at floor edge PROMPT RECTIFICATION Improvement – Continuous barriers erected at floor edge C270 Monthly Safety Report – July 2013
  6. 6. AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – Permanent concrete strip cover installed HOUSEKEEPING – Floor opening not properly covered C270 Monthly Safety Report – July 2013
  7. 7. AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – Outrigger of crane lorry fully extended in lifting operation LIFTING SAFETY – Outriggers of crane lorry not fully extended C270 Monthly Safety Report – July 2013
  8. 8. AREA NEED IMPROVEMENT PROMPT RECTIFICATION HOUSEKEEPING – Temporary site luminous facility failure Improvement – Temporary site luminous facility restored C270 Monthly Safety Report – July 2013
  9. 9. POSITIVE SAFETY ATTITUDE PRE-WORK MEETING Installation of Chimney– Site Specific Safety Meeting prior to lifting operation C270 Monthly Safety Report – July 2013
  10. 10. POSITIVE SAFETY ATTITUDE PRE-WORK MEETING Removing Steam Boiler– Site Specific Safety Meeting prior to lifting operation C270 Monthly Safety Report – July 2013
  11. 11. POSITIVE SAFETY ATTITUDE Inspection by Labour Department QUALITY, SAFETY and ENVIRONMENT Inspection by Government Department C270 Monthly Safety Report – July 2013
  12. 12. SAFETY TRAINING Site Specific Safety Induction Current Month Accumulate (Oct 2011 – Jul 2013) No. of class 19 448 No. of Attendee 48 1883 INDUCTION TRAINING C270 Monthly Safety Report – July 2013
  13. 13. TOOL BOX TALK TRAININGSAFETY TRAINING Topic No. of attendee Safety Lifting safety 13 Safety Safe Use of Ladder 10 Environment Dust Control 86 Safety Inclement Weather 86 Safety General Duties 86 Safety Slip & Trip 89 Current Month Total 344 nos. Accumulated Total :6,724 nos. C270 Monthly Safety Report – July 2013
  14. 14. SAFETY Promotion 9 nos. Very Hot Weather Warning 8 nos. Thunderstorm Warning 1 no. Tropical Cyclone Warning 4 nos. Safety News Sharing 20 nos. EC claim communications (HRD/subcontractors) 7 nos. Safety & Health Interface – other main contractors 18 nos. Safety & Health Advice to CHEC subcontractors 3 nos. Safety & Health Advice - internal 5 nos. Communication with CHEC Safety Safety Circulation C270 Monthly Safety Report – July 2013

×