This monthly safety report from a biodiesel plant summarizes safety statistics, inspections, areas for improvement, positive safety initiatives, training, and promotion activities for February 2013. Key details include a slight decrease in the accident frequency rate from the previous month, physical site inspections and subcontractor meetings held, noise nuisance and material storage issues addressed, an emphasis on planning and precautions for high-risk activities, and ongoing safety training, inspections, and circulation of safety information.
2. SAFETY STATISTICS
Jan 2013 Feb 2013
Accumulated Man-hour 445,951 517,794
Days worked from Commencement 449 477
Accumulated Man-day Lost 814 926
Cumulative Accident Frequency Rate 1.03 0.97
Safety :
Contribution from All
Level ( Top to Shop )
C270 Monthly Safety Report – February 2013
3. SAFETY INSPECTION / MEETING
Physical site safety walks
C270 Monthly Safety Report – February 2013
4. SAFETY INSPECTION / MEETING
Weekly Safety Meetings with Safety Representatives of Subcontractors
C270 Monthly Safety Report – February 2013
5. AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
Improvement – Construction
material in transit removed to
maintain safe access
HOUSEKEEPINT – Safe Access
Planning of storage of construction
material in transit
C270 Monthly Safety Report – February 2013
6. AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
Improvement – Construction
material in transit removed to
maintain safe access
HOUSEKEEPINT – Safe Access
Planning of storage of construction
material in transit
C270 Monthly Safety Report – February 2013
7. AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
Improvement – Provision of Acoustic
Barrier to minimize noise nuisance to
protect occupational health of employee
NOISE NUISANCE
Excessive noise generated to employees
working near by
C270 Monthly Safety Report – February 2013
8. POSITIVE SAFETY ATTITUDE
PRE-WORK MEETING
Installation of Pipe Bridge – Integration of safety consideration in
both Planning Stage and Implementation Stage
C270 Monthly Safety Report – February 2013
9. POSITIVE SAFETY ATTITUDE
PRE-WORK MEETING
Installation of Pipe Bridge – Integration of safety consideration in
both Planning Stage and Implementation Stage
C270 Monthly Safety Report – February 2013
10. POSITIVE SAFETY ATTITUDE
SITE SECURITY CONTROL
Security Guard Force + Electronic Recognition System + Managerial
Regular Checking
C270 Monthly Safety Report – February 2013
11. POSITIVE SAFETY ATTITUDE
OCCUPATIONAL HEALTH & SAFETY CONTROL
Regular Physical Checking to Individual’s Safety Helmet
Occupational Health Advice
C270 Monthly Safety Report – February 2013
12. POSITIVE SAFETY ATTITUDE
QUALITY, SAFETY and ENVIRONMENT Inspection by
Government Department
Regular Site Safety Inspection by Labour Department’s District
Occupational Officer
C270 Monthly Safety Report – February 2013
13. SAFETY TRAINING
INDUCTION
TRAINING
Site Specific Safety Accumulate
Current Month
Induction (Oct 2011 – Feb 2013)
No. of class 17 335
No. of Attendee 62 1503
C270 Monthly Safety Report – February 2013
14. TOOL BOX TALK
SAFETY TRAINING
TRAINING
Accumulated Total : 5,294 nos.
Topic No. of attendee
Safety Lifting Safety 76
Safety Before & After Long Holiday 77
Environmental Dust Control Management 62
Safety RA – Working on Jetty 16
Current Month Total 229 nos.
C270 Monthly Safety Report – February 2013
15. SAFETY Promotion
Safety Circulation
3 nos. Safety News / Alert Sharing
9 nos. Safety Reminder to Subcontractors
5 nos. General Safety Advice on Construction Safety
5 nos. Internal – BDI interface
Risk Assessment – Fabrication & Installation of Pipe
1 no.
Bridge
1 no. Safety Promotional Article
C270 Monthly Safety Report – February 2013