Monthly safety report 2012 11

  1. 1. C270 (HK BIODIESEL PLANT) Safety Report
  2. 2. SAFETY STATISTICSMonth: Oct 2012 Nov 2012Accumulated man-hour: 379,781 413,541Days worked since project commenced: 357 357Accumulated man-day lost: 445 481Cumulative Accident Frequency Rate: 1.05 0.97Safety :From Top Level to Shop Floor C270 Monthly Safety Report – November 2012
  3. 3. SAFETY INSPECTION / MEETING Physical site safety walks C270 Monthly Safety Report – November 2012
  4. 4. SAFETY INSPECTION / MEETING Weekly Safety Meetings C270 Monthly Safety Report – November 2012
  5. 5. AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – Rubbish removed and workplace kept tidy and cleanHOUSEKEEPINGWorkplace should be kept tidyand clean C270 Monthly Safety Report – November 2012
  6. 6. AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – Guard shield of moving parts maintained in placeGUSRDING OF MOVING PARTGuard shield of moving parts should notbe removed C270 Monthly Safety Report – November 2012
  7. 7. AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – Sufficient length ladder + Safety Harness + Co-workerSAFE USE OF LADDERMalpractice of working with ladder C270 Monthly Safety Report – November 2012
  8. 8. POSITIVE SAFETY ATTITUDELaunching of “N” and “P” label system for New Workers to site C270 Monthly Safety Report – November 2012
  9. 9. POSITIVE SAFETY ATTITUDEInspection by Labour Inspector of Labour Department C270 Monthly Safety Report – November 2012
  10. 10. POSITIVE SAFETY ATTITUDEInspection by Occupational Safety Officer of Labour Department C270 Monthly Safety Report – November 2012
  11. 11. POSITIVE SAFETY ATTITUDEInspection by Occupational Safety Officer of Labour Department Follow Up Meeting with Safety Representatives C270 Monthly Safety Report – November 2012
  12. 12. POSITIVE SAFETY ATTITUDERoutine Safety Regularity ActionElimination of Substandard Lifting Gear Elimination of Substandard Electrical Equipment C270 Monthly Safety Report – November 2012
  13. 13. POSITIVE SAFETY ATTITUDETechnical Visit – HKIE on 24/11/2012 C270 Monthly Safety Report – November 2012
  14. 14. POSITIVE SAFETY ATTITUDETechnical Visit – China Light & Power Co Ltd C270 Monthly Safety Report – November 2012
  15. 15. POSITIVE SAFETY ATTITUDESpecific Safety Meeting – Review Safety Deficiency of subcontractor C270 Monthly Safety Report – November 2012
  16. 16. POSITIVE SAFETY ATTITUDESpecific Safety Meeting – Review Safety Deficiency of subcontractor C270 Monthly Safety Report – November 2012
  17. 17. POSITIVE SAFETY ATTITUDESpecific Safety Meeting – Review Safety Deficiency of subcontractor C270 Monthly Safety Report – November 2012
  18. 18. POSITIVE SAFETY ATTITUDESpecific Safety Meeting – Review Safety Deficiency of subcontractor C270 Monthly Safety Report – November 2012
  19. 19. SAFETY TRAINING INDUCTION TRAINING Site Specific Safety Accumulate Current Month Induction (Oct 2011 – Nov 2012) No. of class 21 276 No. of Attendee 82 1296 C270 Monthly Safety Report – November 2012
  20. 20. TOOL BOX TALKSAFETY TRAININGTRAINING Accumulated Total : 4,214 nos. Topic No. of attendee Environmental Waste Management 89 nos. Environmental Dust Control Measure 89 nos. Occupational Safety Fire Prevention 91 nos. Occupational Safety Inclement Weather Safety 89 nos. Occupational Safety Safe Use of Scaffold 6 Occupational Safety Working in Confined Space 23 Occupational Safety Lifting Safety 13 Occupational Safety Electricity Safety 8 Current Month Total 408 nos. C270 Monthly Safety Report – November 2012
  21. 21. SAFETY Promotion Safety Circulation 4 nos. Safety News Sharing 5 nos. Safety Reminder to Subcontractors 5 nos. General Safety Advice on Construction Safety 1 no. Internal – BDI – Damage Bamboo Scaffold 1 no. Risk Assessment – Installation of IC Reactor 1 no. Thunderstorm Warning C270 Monthly Safety Report – November 2012
  22. 22. C270 Monthly Safety Report – November 2012

×