Brock Environmental Center - Presentation from July 16, 2013 Open House

2,044 views
1,919 views

Published on

Presentation by Hourigan Construction on construction plans for the Chesapeake Bay Foundation's Brock Environmental Center at Pleasure House Point 7/16/13

Published in: News & Politics
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
2,044
On SlideShare
0
From Embeds
0
Number of Embeds
941
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Brock Environmental Center - Presentation from July 16, 2013 Open House

  1. 1. Primary Construction Route Park Access Park Access Public Parking Secondary Construction Route www.houriganconstruction.com www.cbf.org Park Access
  2. 2. CONSTRUCTION ENTRANCE AND DELIVERY SIGN & PROJECT RENDERING SAFETY RULES SIGN & SECURITY GATE SECURITY CAMERA CONSTRUCTION PARKING HOURIGAN & CBF PROJECT TRAILERS SECURED STORAGE CONSTRUCTION-USE SOLAR ARRAY RECYCLE/LOADING AREA SECURITY LIGHTING DIRECTION OF CONSTRUCTION SECURITY LIGHTING SECURITY LIGHTING EROSION AND SEDIMENT FENCE TEMPORARY POWER/ SANITARY FACILITIES BROCK ENVIRONMENTAL CENTER SITE UTILIZATION PLAN EXISTING SWING-GATE TO REMAIN DURING CONSTRUCTION STRUCTURAL ERECTION ROAD - 8’ STONE WITH GEO TEXTILE FABRIC www.houriganconstruction.com www.cbf.org
  3. 3. Construction Means and Methods www.houriganconstruction.com www.cbf.org Noise Reduction • Activities producing higher levels of noise will be performed between the hours of 9:00 am and 3:30 pm Monday through Friday Green Construction Processes Utilized to Reduce Carbon Footprint • On site water management • No onsite construction parking • Solar panel array for temporary construction power • Water well for temporary construction water • Pollution reduction methods utilized on equipment • Containment areas around temporary toilets • Minimize use of fossil fuel equipment Public Parking and Access to Park • Parking at the City pump house or Marlin Bay Drive • Access to park identified via signage Construction Traffic • Primary construction route: Shore Dr. to E. Stratford • Construction hours: Monday through Friday 6:30 am – 5:00 pm • Construction parking at the City pump house • Dust control methods Safety & Security • 6’ tall security fence • Motion sensor lighting • Web based security camera
  4. 4. Construction Schedule (as of July 16, 2013) Brock Environmental Center Construction Activity Start Date Completion Date Total Construction 08/05/13 07/30/14 Fencing & Gates 08/05/13 08/16/13 Construction Trailers 08/12/13 08/16/13 Clearing & Construction Roads 08/19/13 08/30/13 Concrete Structure 08/28/13 10/18/13 Site Utilities 09/02/13 10/25/13 Steel Structure 10/28/13 11/29/13 Interior Construction 12/30/13 04/04/14 Pier 01/01/14 05/01/14 Site Work 02/17/14 04/11/14 Chesterfield Road Waterline 04/07/14 04/18/14 Marlin Bay Path 05/01/14 08/01/14 Complete Construction 07/30/14 07/30/14 CBF Occupancy Late Summer Early Fall www.houriganconstruction.com www.cbf.org

×