0
Bureau of Land Management Installed 10 grid-tied sites from New Mexico to Oregon 100kW site, Anasazi Heritage Center, Dolo...
Bureau of Land Management 40kW, single inverter, Dolores, Colorado 112 vertical stanchions, 150 modules
Bureau of Land Management 25kW, single inverter, Cody, Wyoming All sites have video and internet monitoring systems
Bureau of Land Management 25kW, redundant inverters, Rock Springs, Wyoming All wiring by in-house electricians
Bureau of Land Management 25kW, single inverter, Rock Springs, Wyoming Provided project scheduling, net metering coordinat...
Bureau of Land Management 40kW, single inverter, Montrose, Colorado
Bureau of Land Management 25kW, single inverter, Grants, New Mexico Ready for fencing
Bureau of Land Management 100kW, single inverter, Salem, Oregon Applying cellular site construction and networking to   ph...
Upcoming SlideShare
Loading in...5
×

BLM project for Johnson Controls

224

Published on

Published in: Travel, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
224
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "BLM project for Johnson Controls"

  1. 1. Bureau of Land Management Installed 10 grid-tied sites from New Mexico to Oregon 100kW site, Anasazi Heritage Center, Dolores, Colorado
  2. 2. Bureau of Land Management 40kW, single inverter, Dolores, Colorado 112 vertical stanchions, 150 modules
  3. 3. Bureau of Land Management 25kW, single inverter, Cody, Wyoming All sites have video and internet monitoring systems
  4. 4. Bureau of Land Management 25kW, redundant inverters, Rock Springs, Wyoming All wiring by in-house electricians
  5. 5. Bureau of Land Management 25kW, single inverter, Rock Springs, Wyoming Provided project scheduling, net metering coordination
  6. 6. Bureau of Land Management 40kW, single inverter, Montrose, Colorado
  7. 7. Bureau of Land Management 25kW, single inverter, Grants, New Mexico Ready for fencing
  8. 8. Bureau of Land Management 100kW, single inverter, Salem, Oregon Applying cellular site construction and networking to photovoltaics
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×