Your SlideShare is downloading. ×
0
BSCI 1173
BSCI 1173
BSCI 1173
BSCI 1173
BSCI 1173
BSCI 1173
BSCI 1173
BSCI 1173
BSCI 1173
BSCI 1173
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

BSCI 1173

264

Published on

Published in: Education, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
264
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
8
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Installing the Roofing Structure and Membrane<br />Dave Nelson<br />
  • 2. Drawings- S2.4 Roof Framing Plan<br />http://content.lib.auburn.edu/cdm4/item_viewer.php?CISOROOT=/bscimmgc&CISOPTR=1008&REC=10.<br />
  • 3. Drawings-A2.4 Attic Plan and Roof Plan<br />http://content.lib.auburn.edu/cdm4/item_viewer.php?CISOROOT=/bscimmgc&CISOPTR=990&REC=6.<br />
  • 4. Sections-S4.6<br />http://content.lib.auburn.edu/cdm4/item_viewer.php?CISOROOT=/bscimmgc&CISOPTR=1012&REC=21.<br />
  • 5. Erecting Steel Roof Trusses<br />This is usually done with the help of a hydraulic lift or crane. Laborers secure the trusses in place after they are lifted onto the structure. <br />
  • 6. Corrugated Roof Decking Delivery<br />These are the sheets of corrugated steal that were to delivered to be used as decking on the roof of The Gorrie Center. <br />Below: A lull forklift unloads the corrugated metal decking to be used on the roof <br />
  • 7. Installation of corrugated roof decking<br />Labors fasten the decking to the trusses according to the methods listed in The General Notes. <br />
  • 8. Underside of steel roof decking<br />This is the topside of the decking once it has been fastened and nailing strips are being put in place to support a 1 ½ nail-able deck for felt and shingles.<br />
  • 9. Here laborers complete the roofing process by nailing asphalt shingles with the appropriate overlap as stated by code over the # 30 felt used to cover the plywood decking. They must work around any MEP components that penetrate. Precautions have to be taken so there is not any water leakage <br />
  • 10. Completion of the roofing process<br />

×