Your SlideShare is downloading. ×
  • Like
BSCI 1173
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply
Published

 

Published in Education , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
250
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
8
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Installing the Roofing Structure and Membrane
    Dave Nelson
  • 2. Drawings- S2.4 Roof Framing Plan
    http://content.lib.auburn.edu/cdm4/item_viewer.php?CISOROOT=/bscimmgc&CISOPTR=1008&REC=10.
  • 3. Drawings-A2.4 Attic Plan and Roof Plan
    http://content.lib.auburn.edu/cdm4/item_viewer.php?CISOROOT=/bscimmgc&CISOPTR=990&REC=6.
  • 4. Sections-S4.6
    http://content.lib.auburn.edu/cdm4/item_viewer.php?CISOROOT=/bscimmgc&CISOPTR=1012&REC=21.
  • 5. Erecting Steel Roof Trusses
    This is usually done with the help of a hydraulic lift or crane. Laborers secure the trusses in place after they are lifted onto the structure.
  • 6. Corrugated Roof Decking Delivery
    These are the sheets of corrugated steal that were to delivered to be used as decking on the roof of The Gorrie Center.
    Below: A lull forklift unloads the corrugated metal decking to be used on the roof
  • 7. Installation of corrugated roof decking
    Labors fasten the decking to the trusses according to the methods listed in The General Notes.
  • 8. Underside of steel roof decking
    This is the topside of the decking once it has been fastened and nailing strips are being put in place to support a 1 ½ nail-able deck for felt and shingles.
  • 9. Here laborers complete the roofing process by nailing asphalt shingles with the appropriate overlap as stated by code over the # 30 felt used to cover the plywood decking. They must work around any MEP components that penetrate. Precautions have to be taken so there is not any water leakage
  • 10. Completion of the roofing process