Your SlideShare is downloading. ×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Kondwani Mtalimanja, IT Manager at Save the Children - Current IT situation in Africa and the it strategy work we are currently completing at Save the Children

178
views

Published on

Kondwani Mtalimanja, IT Manager at Save the Children spoke at the CIO Africa Event 2013

Kondwani Mtalimanja, IT Manager at Save the Children spoke at the CIO Africa Event 2013

Published in: Spiritual, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
178
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • We will change the world for children by combining all the elements of our Theory of Change in every program we embark on. We believe that this will help us achieve much more for children, leveraging our resources in a more efficient and sustainable way, and succeeding in inspiring the global breakthroughs we want to see for children.
  • Transcript

    • 1. Kondwani Mtalimanja“CONNECTING AFRICA IN A 21STCENTURY INTERNATIONAL NGO”
    • 2. AgendaIntroduction to the Save the Children International • Vision • Mission • Theory of ChangeIT Support ModelIT Strategy and 2012 DeliverablesChallengesQ&A
    • 3. Save the Children International• WE ARE the world’s leading independent organisation for children.• OUR VISION is a world in which every child attains the right to survival, protection, development and participation.• OUR MISSION is to inspire breakthroughs in the way the world treats children, and to achieve immediate and lasting change in their lives.
    • 4. Our Theory ofChange is…
    • 5. AgendaIntroduction to the Save the Children International • Vision • Mission • Theory of ChangeGlobal IT Support ModelIT Strategy and 2012 DeliverablesChallengesQ&A
    • 6. Total number of IT staff Region 3 MEE 142 Region 1 S&C Asia Iraq 1 Armenia o/s Nepal/Bhutan 3 In Countries / Regions 127 Georgia 1 Afghanistan 7 In Global roles 15 Jordan1 2 Central Asia2 5 Albania o/s Region 5 Kosovo o/s Pakistan 19Most of our staff W&C Africa NW Balkans o/s Bangladesh Sri Lanka 12 2 Yemen 2are based in Senegal 2 oPt 1 Total staff : 48 Sierra Leone 1countries… Burkina Faso 1 Lebanon Egypt 1 o/s DRC 3 Region 6 Region 2 Nigeria 3 East Africa Liberia 1 Total staff : 9 SE&E Asia Ethiopia 7 Cote d’Ivoire 1 Rwanda 1 DPRK - Niger 1 Laos 1 Region 4 LAC Mali 1 Uganda 2 Cambodia 2 Somalia 3 Nicaragua 2 Guinea 1 Region 7 Kenya 2 Philippines 3 Colombia 1 Total staff : 15 Vietnam 1 Peru 1 Southern Africa Tanzania 1 Myanmar 3 South Sudan 2 Ecuador o/s Indonesia 3 Mozambique 2 Sudan 3 El Salvador 1 China 1 Malawi 1 Haiti 4 Singapore 2 Zambia 1 Total staff : 21 Bolivia 3 Total staff : 16 Zimbabwe 1 Total staff : 13 Total staff : 5
    • 7. – Network Team (2)Country, Regional and Global IT Teams all work – FMS Team (4)together to support… – AMS Team (1) – Intranet (1) StC – Servers / storage ( 2)Level 3 Global – Help desk (1) (UK & US) Regional IT (6)Level 2 SCI SCI SCI SCI Asia (2) MEE (1) Africa (2) LAC (1) Country 1 Country 3 Country 5 Country 7Level 1 1 – IT Manager Country IT 2 – IT Assistant (121) Country 2 Country 4 Country 6 Country 8 3 – IT Techs Sub offices
    • 8. AgendaIntroduction to the Save the Children International • Vision • Mission • Theory of ChangeGlobal IT Support ModelIT Strategy and 2012 DeliverablesChallengesQ&A
    • 9. Our IT Strategyis looking at allIT capabilities,fromfoundational tostrategicallydifferentiating
    • 10. In 2012 we Delivered… Transitioned Developed a set of Delivered Phase 1 of 11,000+ standard globalAgresso system to over email accounts to IT Procedures 50 countries globally, including O365 ( being updated) 9 in ESA Built a new global Delivered IT Team Awards Mgmt System 1.0 Delivered SCM Project Built a new template for Launched intranet To 6 Ethiopia Country web sites sites
    • 11. AgendaIntroduction to the Save the Children International • Vision • Mission • Theory of ChangeGlobal IT Support ModelIT Strategy and 2012 DeliverablesChallengesQ&A
    • 12. However there are Challenges that we face… • Network Capacity e.g. VSAT and Government restrictions • IT Skills Capacity e.g. Asia vs. Africa • Getting IT to be seriously taken by Country Office Directors
    • 13. Thank You Very Much Q&A