• Like

Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

Published

 

Published in Business , Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
250
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Inside risk assesment.cause significant persons hazards at risk identifiedfaulty electrical equipment in risk of electricalclassroom death / fire risk of tripping /trailing cable bruisingheat of film lamp in classroom burn risk risk offire in school death/burnsequipment falling & overhanging risk of bruisingmicrophones in class
  • 2. outside risk assesment.faulty electrical equipment on risk of electricallocation. death/fireequipment falling & overhangingmicrophones on location risk of bruising risk ofFire on location. death/burnsRainy weather may cause slippery risk ofroads. injury/brusing.
  • 3. ssesment. severity likeli-hood risk rating existing controls additional controls/ recommendation s kit regularly checked - close 5 2 10 supervision of participants using kit cables into cable tidys or taped down 2 2 4 close supervision of use, ensure lamps are standing and used 3 2 6 correctly. schools emergency evacuation procedure overseen by participating 10 1 10 teacher who will take responsibility in events of evacuation. camera tripods, and boom equipment set up and operated 2 2 4 correctly - equipment correctly fastened
  • 4. 5 1 5no mains powered equipment to betaken on location. assess locaation.camera tripods and boom equipmentset up and operated correctly - assess location andequipment correctly fastened where equipmentpossible. 2 2 4 beforehand.evacuation procedure fr any interior asses locationlocation to be checked. 9 1 9 beforehand.On rainy days actor and productionmembers mus wear appropriate look at weather reportclothing 4 4 4 prior to filming.