Your SlideShare is downloading. ×
Workplace Charging: Filling a Critical Infrastructure Gap
July 31, 2012
Alex Keros
Mngr, Advanced Vehicle and Infrastructu...
GM’s Line-up of Plug-in Vehicles:
Chevrolet Volt
EREV (2010)
Cadillac ELR EREV
(Timing to be announced)
Electric Vehicle a...
3
PEV Charging Installations | GM Workplace
Detroit-Hamtramck (MI) Assembly Plant Company Vehicle Operations (MI) GM Headq...
4
PEV Charging Installations | Torrance, CA
Advanced Technology Center & Advanced Technology Vehicle Center
General Motors - Workplace Charging: Filling a Critical Infrastructure Gap - July 31, 2012
Upcoming SlideShare
Loading in...5
×

General Motors - Workplace Charging: Filling a Critical Infrastructure Gap - July 31, 2012

216

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
216
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "General Motors - Workplace Charging: Filling a Critical Infrastructure Gap - July 31, 2012"

  1. 1. Workplace Charging: Filling a Critical Infrastructure Gap July 31, 2012 Alex Keros Mngr, Advanced Vehicle and Infrastructure Policy
  2. 2. GM’s Line-up of Plug-in Vehicles: Chevrolet Volt EREV (2010) Cadillac ELR EREV (Timing to be announced) Electric Vehicle and Charging| General Motors Chevrolet Spark BEV (2013) GM Workplace Installation Examples • GM GlobalHeadquarters(RenaissanceCenter, Detroit) • Detroit-HamtramckAssembly Plant (includesSolar) • BrownstownBattery AssemblyPlant • GM Tech Center o VEC (Solar) o AEC (Solar) o Design Studios o R&D o Service Operations o Company Vehicle Operations (Solar) • BowlingGreenAssembly Plant (Solar) • LordstownComplex(Solar) • Parma Metal Center (Solar) • BaltimoreTransmission Plant (includesSolar) • MilfordProvingGrounds(includesSolar) • Customer Care & Aftersales, ServicePartsOrganization • AdvancedTechnicalCenters o Palo Alto, CA o Torrance, CA o Honolulu, HI o Honeoye Falls, NY o Washington DC Public Workplace Residential 120V = grid-friendly, easy 240V = faster-charging
  3. 3. 3 PEV Charging Installations | GM Workplace Detroit-Hamtramck (MI) Assembly Plant Company Vehicle Operations (MI) GM Headquarters Warrant Tech Center (MI) Adv. Vehicle Center (VA) Dealerships (including CA)
  4. 4. 4 PEV Charging Installations | Torrance, CA Advanced Technology Center & Advanced Technology Vehicle Center

×