New gl migration 1
Upcoming SlideShare
Loading in...5
×
 

New gl migration 1

on

  • 11,516 views

 

Statistics

Views

Total Views
11,516
Views on SlideShare
11,508
Embed Views
8

Actions

Likes
6
Downloads
720
Comments
3

1 Embed 8

http://www.linkedin.com 8

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel

13 of 3 Post a comment

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    New gl migration 1 New gl migration 1 Presentation Transcript

    • Johannes Le RouxLeroux@jari-consuling.com
    • New G/L Migration Roadmap andCockpitJohannes Le Roux, Satreno North America(USA)
    • Main Message• Introduction – SAP New General Ledger• Migration to SAP New General Ledger• Migration Cockpit• Key Points to Take Home• Summary• Questions
    • Introduction - Migration to New G/L Business Drivers why to move to the New GL…….. • Need single general ledger for company-wide financial reporting and decision making • Improve management reporting at the profit-center level with real-time balance sheets using the document-splitting feature • Need better visibility across all reporting units • Need Reporting in different accounting standard and Multiple Currencies across the world • Need a faster closing process • Need Multiple Fiscal year variants
    • Introduction - Migration to New G/L SAP New General Ledger will combine three ledgers into one Legal Reporting Classic • Company code General • Account Ledger • Business area Legal & Management Management Reporting New Reporting • Company code General • Company code Profit • Account • Account Center • Profit center Ledger • Business area Ledger • Plant • Prot center • Trading partner • Trading partner • Functional area Products Management • Destination country Special Reporting Purpose • Company code Ledger • Account • Business area • Profit center • Trading partner • Destination country
    • Introduction - Migration to New G/L Parallel Ledger/Valuation Leading Ledger - 0L Accounting Standard can No Ledger not Change LATER. Specified Company 1 Ledger Specified Local Ledger – 0A Futures in Parallel Ledger Local - GAAP Company 2• Separate ledger for each accounting standard• Multiple Valuations – Based on Company Code/Local Ledger• Parallel valuation Display Local Ledger – 0B• Specific Postings to Ledgers Based on accounting standard IAS• Statements By Accounting Standard Company 3Classic ledger – Accounts, Special ledger and in in some Local Ledger – 0Ccases Company codes was used to allow parallel valuation IFRS• Multi-Ledger/ Multi Currency Updates Local Ledger – 0D• Multi- Dimensional reporting (Segment, Profit center, etc) IASB
    • Introduction - Migration to New G/L Benefits…….. • Single source of financial information • Enriched profit-center balance sheet reporting • Balance sheet analytics with real-time document splitting • Better financial closing efficiency achieved by reducing errors, manual rework, and cycle times • Foundation for simplifying accounting, improving efficiency, increasing working capital visibility, and cutting IT costs • All reporting done from a single source of data • Reporting in multi currencies • New General Ledger no longer requires Ledger reconciliations
    • Migration to New G/L • This Scenario is straightforward and can beScenario 1 • Merging FI, PCA and SPL completed in the least amount of time. • This Scenario is used where there is not splitting or parallel valuation, and no financial statement below company codeScenario 2 • Includes document splitting level • Includes parallel ledgers withScenario 3 no splitting • This is the Complex Migration Scenarios • This Scenario includes document splitting and adding of Parallel ledgers. • Includes document splitting • This Scenario is normally used where thereScenario 4 and parallel ledgers is splitting or parallel valuation used to produce balanced financial statements below company code level • Adding splitting after initialScenario 5 migration • You choose Scenario 1,2 & 4 and then want to do a subsequent implementation with • Adding splitting after initialScenario 6 migration document splitting this will require an additional migration project
    • Migration to New G/L • This Scenario allow Companies already on New GL to add a Parallel ledgers. • NOTE: This is only required if the Company • Add Parallel ledger on already in production with data posted toScenario 7 current New GL system it. • This Scenario allows companies already on • Switch from Parallel using Parallel accounting to switch to parallel Ledgers.Scenario 8 accounting to Parallel • EXAMPLE: Companies using account base Ledger to split localized reporting and know they are required to do IFRS as well. By splitting the ledger will safe them from adding additional accounts
    • Migration to New G/L RoadmapUpgrade Project New Ledger Implementation/Migration Phase 0 Phase1 Phase 2 Planning & Blueprint Customize Go-liveSAP ECC New G/L and Test New Migrate to G/L New G/L• Complete Upgrade before • Planning of migration • Year-end close of • Perform migration starting Migration project • Analyze business old fiscal year • Transfer Data into new tables: • Define Customizing • Customize new G/L FAGLFLEXA/FAGLFLEXT • Define Processes change • Customize migration • Run carry forward of fiscal year into new • Define document splitting if • Activate split check totals table: FAGLFLEXT needed • Test Migration • Update of split Info if needed.Migration principles:• Recommendation is that Date of migration is at the beginning of a fiscal year• Year-end closing of old fiscal year must be completed prior to activation of new G/L• Source ledger of migration data must be determined by company code and account
    • Migration to New G/L New Ledger Implementation/Migration Phase 0 Phase 1 Phase 2 Planning/Blueprint Migration and Testing GO-Live Old Fiscal Year New Fiscal Year Run Classic G/L Run Classic G/L Run New G/L Year-end close of old fiscal year Date of Migration of Fiscal Date of Activation Year change De-activate Classic Ledger ALL Data Migrated
    • Migration to New G/L It is required to use SAP’s Migration service for the migration to New G/L Phase 0 Phase 1 Phase 2 Planning/Blueprint Migration and Testing GO-Live SAP Migration ServicesQuestionnaire Scenario Service Test Service Production Validation Session 1 Validation Session 2 Support Customer Configuration Review Review Review & Testing Session Session Session Customer Migration project Site – Satreno/Client Team
    • Migration to New G/LSAP 2 Service Sessions……Service session 1: Scenario Validation• Assure correct migration approach –Selection of Scenario• Data Check – Support pack level, Currencies, Organizational structures.• Transactional Data Check – Tables, document and line items and document types used.• Checks of migration customizing against target customizing of new G/LThis Service session is to help the client select the correctmigration package and to validate the fit for the package selected.
    • Migration to New G/LSAP 2 Service Sessions……Service session 2: Test Validation• Validate that the testing was done as required from a technical standpoint• Check Components in use• Validating process of migration• Validate and review all data migration log and tables.This Service session is to help the client validate that all data willmigrate as required based on new configuration.
    • Migration to New G/LWhat about History Data……• Historical data from the classic GL tables, PCA tables, and any SPL is not migrated.• Only Open items, and non-open item account balances are migrated to the new tables.• New GL Statements will only have current fiscal Year Data and account balances rolled forward from previous fiscal year – No detail available for Previous Fiscal Year.
    • Migration to New G/LWhat does other companies do to bridgereporting GAP?• For historical comparison reporting in BW to combine the detailed data from the past year and current year.• Use Excel base reporting Tools like E-Server and Spreadsheet Server• Business Object consolidation reporting
    • Migration Cockpit• Migration Cockpit is used to assist you in managing and guiding you through the tree phases of the project.• The tool enable project management to see tasks and monitor progress of the migration project Notes to apply to load Cockpit• 1138250 – NMI_CONT: Information about Support Pack• 1041066 – Installation of NMI Content 2006_1 When Cockpit is loaded access with transaction CNV_MBT_NGLM
    • Migration Cockpit Migration CockpitStep to setup Cockpit:1 . Access migration Cockpit
    • Migration Cockpit Migration CockpitSteps to setup Cockpit:2. Create project
    • Migration Cockpit Migration CockpitSteps to setup Cockpit:3. Select Migration Package Scenario • Each Scenario has it own migration cockpit package – Once you defined the Scenario you will load the pack and follow the step for the specific Scenario.
    • Migration Cockpit Migration CockpitSteps to setup Cockpit:4. Process TREE – Provide step by step process to complete migration
    • Migration Cockpit Migration CockpitStep to setup Cockpit:5. Create Migration plan6. Set Migration Date - Migration Cockpit will select a date based on the migration plandefined
    • Migration Cockpit Migration CockpitStep to setup Cockpit:7. Assign Company Codes and ledgers required – This can only be done afterconfiguration is completed for New GL in ECC
    • Migration Cockpit Migration CockpitStep to setup Cockpit:8. Check to be done before migration can start.
    • Key Points to Take Home• New GL is not just a data migration project• Significant effort needed for business process testing• Strong communication required with Basis and ABAP• Never underestimate the importance of your data• Look for inconsistencies in your data now• Guidance from New GL experienced SAP consultants essential to project success• Strong business sponsorship an absolute must• Practice makes perfect• Start cutover plan as early as possible• Perform at least one full “Dry Run”Cutover• Create data validation plan and convene SAP FI-CO and Business Validation teams during migration• Make log of Ledger differences during migration weekend and take action later
    • Summary• Plan a Timeline for your migration project around six-eight months depending on you company culture.• SAP’s New G/L migration support service is mandatory for all new G/L migrations.• Upgrade to ECC must be completed prior to the new G/L migration• SAP will continue to support the classic G/L• New G/L migration process is a consulting project – Only use Consultant with New Ledger Experience• NEW GL – Faster Closing of book – Better integration and lest steps – Improved reporting and analysis – Improved Productivity
    • Questions