Blake Lapthorn Green Breakfast        Southampton, 22nd May 2012 Paul Ciniglio - Sustainability Strategist, First Wessex
About First Wessex:•   Hampshire and Surrey based HA•   19,000 existing homes•   £35m pa RR&PM spend•   1,000+ new homes u...
‘Retrofit South East’ project• First use of 4% European Regional Development  Funding (ERDF) for retrofit of social housin...
To retrofit or build a new community?                  “An Ideal setting for a Council estate.                  This aeria...
‘Retrofit South East’ project centrepiece (14 homes)Solar street community + show home
Environmental strategy• Modelled a 77% – 90% reduction in regulated CO2  emissions post retrofit.• Water efficiency improv...
How C88 was achieved, Show home full SAP modellingScenario                      SAP      EPC /    Annual      Approx cost ...
Continuity of insulation & air tightness              Before        After        Air pressure test Before, REEMA panels   ...
Working with residents• 8 months lead in time / consultation period with residents.• Full time community liaison officer a...
Research and dissemination•   Retrofit pioneers group established.•   SME retrofit network set up.•   Mapping of regional ...
Regional retrofit benefits study• Establish a market worth £460-850m/yr, on top of current RMI.• Create 4,100 - 33,000 job...
Retrofit sustainable financeRevolving Retrofit Guarantee fund
Through life emissions report releaseRetrofit v demolition and new build• Comparison analysed over 50 year period.• Advanc...
Through life emissions report cont’d…               Comparison of Lifetime CO2e emissions over 50 years between build type...
Through life emissions report key findings• Advanced retrofitted homes have lower emissions  than a new home built to CfSH...
Project Summary Report release Other Key learning points and findings• Advanced retrofit is expensive but brings significa...
Project Summary ReportKey learning points & findings cont’d…• A community liaison officer is essential.• Briefing resident...
Project Summary ReportKey learning points & findings cont’d…• Continuity of air tightness and insulation is key – detailin...
Resident feedback:“It’s like having a new home on the same plot ofland, they are so much warmer, before they wereso cold a...
1970’s End of Terrace, Fareham• BREEAM domestic refurbishment  pilot - Very Good rating• 75% reduction regulated emissions...
• Cost: £30,000 for energy efficiency  related works.• Year 1 & 2 feedback on my home.• Over 400 visitors, many taking act...
Targets for new housingcarbon compliance 2016
Introduction and standards• EcoHomes (obsolete EAM for new housing)• Code for Sustainable Homes (current EAM)• Interim rep...
CfSH Energy   Code Level         Energy             Waterand Water –                   % better           Litres per      ...
^Code 6
ZCH recommendations• Interim report considered 70% energy  improvement• Final ZCH report concluded not possible  in all ca...
ZCH recommendations cont’d…• ZCH based on regulated emissions only  – Code 6 covering unregulated emissions defunct  – New...
ZCH recommendations cont’d…• Carbon compliance (steps 1 & 2) compared with  CfSH and Building Regs part L 2006  – Detached...
ZCH recommendations cont’d…• Carbon compliance can also be expressed in terms of  energy use   – Approx 46 kWh/m2/year (de...
ZCH recommendations cont’d…• Allowable solutions (relate to off setting / mitigating emissions  off site between Carbon Co...
Interesting ZCH implications• Averaging to achieve compliance across the development  recommended by ZCH (not all homes wo...
ZCH and Localism agenda• ZCH advocate one standard throughout UK• However, move away from national regulation standards  t...
Projected ZCH extra costs over Building Regs  Cost of Carbon       Semi          Semi          Detached      Detached  Com...
Future role of the CodefSH• Future perhaps uncertain• DCLG are owner of the Code (licensed to BRE) and  Code will continue...
Issues: the town today•   Economic decline•   Poor town centre•   Disconnected town•   Poor public transport links•   Poor...
Future economic roles?Whitehill Bordon needs to plan foreconomic growth following withdrawal ofMoD by 2014/15.            ...
Revised master-plan proposal map                                   4,000 new homes                                   New t...
High level objectives•   Carbon Neutrality - By 2036 the whole town should be carbon    neutral.•   Biodiversity – The tar...
STAGE D   Whitehill Bordon Ecostation
One Planet Living
Early win housing projects:• Area based free loft and cavity insulation  programme – 1,100 measures completed• LCCC fundin...
THANK YOU
Paul Ciniglio presentation for South Coast green breakfast - 22 May
Paul Ciniglio presentation for South Coast green breakfast - 22 May
Paul Ciniglio presentation for South Coast green breakfast - 22 May
Paul Ciniglio presentation for South Coast green breakfast - 22 May
Paul Ciniglio presentation for South Coast green breakfast - 22 May
Paul Ciniglio presentation for South Coast green breakfast - 22 May
Upcoming SlideShare
Loading in …5
×

Paul Ciniglio presentation for South Coast green breakfast - 22 May

907
-1

Published on

Blake Lapthorn, B&Q and KPMG welcomed Paul Ciniglio as their speaker at the final of the first series of South Coast green breakfasts on 22 May 2012.

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
907
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
9
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Paul Ciniglio presentation for South Coast green breakfast - 22 May

  1. 1. Blake Lapthorn Green Breakfast Southampton, 22nd May 2012 Paul Ciniglio - Sustainability Strategist, First Wessex
  2. 2. About First Wessex:• Hampshire and Surrey based HA• 19,000 existing homes• £35m pa RR&PM spend• 1,000+ new homes under 2011-15 AHP• Part of Wayfarer consortium of HA’s – Radian lead development partner• This presentation: – Radian ‘Retrofit South East’ project – First Wessex BREEAM retrofit & Sunpower CO2ttage – New Build 2016 Carbon Compliance standards – Whitehill Bordon Eco-town update
  3. 3. ‘Retrofit South East’ project• First use of 4% European Regional Development Funding (ERDF) for retrofit of social housing in 2009.• £421,000 grant secured for programme of research to build low carbon retrofit capacity.• ERDF project outputs related to retrofit business assistance provided to 85 SME’s.• Partnership project:
  4. 4. To retrofit or build a new community? “An Ideal setting for a Council estate. This aerial picture of part of the Cranford Road estate shows the neat and airy spacing, with pleasant greens between the rows of houses. Although in complete contrast to the old town, with its splendid examples of Georgian architecture, this essential development is probably as tasteful as a Council estate can be”. Local newspaper 1950
  5. 5. ‘Retrofit South East’ project centrepiece (14 homes)Solar street community + show home
  6. 6. Environmental strategy• Modelled a 77% – 90% reduction in regulated CO2 emissions post retrofit.• Water efficiency improved by average 16% to 92 l/p/d.• 85% of waste was recycled off site under SWMP.• BREEAM domestic refurbishment pilot project.
  7. 7. How C88 was achieved, Show home full SAP modellingScenario SAP EPC / Annual Approx cost of Percentage 2005 SAP Regulated measure £ Reduction in Rating Band CO2 Regulated Emissions CO2 Emissions % kgC02/yr - -Baseline as extg (Gas) 49 E 5,868+ 100mm Phenolic foam 10,500EW Insulation 69 C 3,461 41%+ Double loft insulation 250to 300mm thick 70 C 3,284 44%+ 50mm vertical floor raft 1,750edge insulation 71 C 3,219 45%+ A-energy rated windows 6,000and doors 73 C 2,792 52%+ Improved air tightness 3,000& heat recovery ventilation 74 C 2,650 55%+ New ‘A’ rated boiler & 4,500cylinder plus controls 80 C 1,965 67%+ 100% low –e lighting 81 B 1,923 250 67%+ 2.1 kWp solar PV 91 B 972 9,250 83%+ Solar thermal 3msq 92 A 816 5,000 88%+ 20mm aerogel ground 5,500floor insulation 92 A 692 90%Sum of all measures 92 A 692 £46,000 90%
  8. 8. Continuity of insulation & air tightness Before After Air pressure test Before, REEMA panels After retrofit EWI -100mm
  9. 9. Working with residents• 8 months lead in time / consultation period with residents.• Full time community liaison officer appointed.• On-site drop in office available throughout refurbishment.• Decant period was 10-12 weeks.• Community energy efficiency training and 1:1 home visits.
  10. 10. Research and dissemination• Retrofit pioneers group established.• SME retrofit network set up.• Mapping of regional retrofit exemplars.• Conferences, seminars and workshops.
  11. 11. Regional retrofit benefits study• Establish a market worth £460-850m/yr, on top of current RMI.• Create 4,100 - 33,000 jobs in installation, supply and support.• Enhance the asset value of regional homes by up to £22.4 billion.• Liberate over £1 billion a year in energy savings.• Take at least 360,000 people out of fuel poverty.• Save up to £80 million on healthcare and up to 3,700 winter deaths.• Save 3% of total regional water consumption.• Future-proof homes against climate change impacts.• Improve regional energy security.• And cut regional carbon emissions by one fifth!
  12. 12. Retrofit sustainable financeRevolving Retrofit Guarantee fund
  13. 13. Through life emissions report releaseRetrofit v demolition and new build• Comparison analysed over 50 year period.• Advanced retrofit compared with: – Traditional and timber frame construction – Building Regulations Part L 2010, Code 4 & ZCH 2016• Emissions considered: – Embodied energy associated with new and existing materials (‘locked in’), construction processes – The ‘in use’ emissions for heating and power
  14. 14. Through life emissions report cont’d… Comparison of Lifetime CO2e emissions over 50 years between build types Deliveries by third Advanced Retrofit  parties ‐ LGV Deliveries by third parties ‐ HGVTimber Fra me (BRegs  2010)  Materials ‐ Substructures Materials ‐Timber Fra me (CSH Level 4)  Superstructures Removal of waste from site ‐ LGV/HGV Timber Fra me (ZCH 2016) Site energy consumption ‐ gas oil Site energy consumption ‐ Brick & Block (BRegs  2010)  electricity Site energy consumption ‐ natural gas Brick & Block (CSH Level 4) Landfilled waste Brick & Block (ZCH 2016)  In‐use regulated energy sources In‐use appliances & 0 50 100 150 200 cooking  Tonnes of CO2e 
  15. 15. Through life emissions report key findings• Advanced retrofitted homes have lower emissions than a new home built to CfSH level 4 and ZCH 2016.• Considering ‘all in’ costs for similar energy performance: – Advanced retrofit costs almost 40% less – A saving of approx £53,000 per dwelling• Around 20,000 UK homes are demolished every year. If we retrofitted instead: – 422,500 tCO2/year could be saved, – Equivalent of 211,000 new homes.
  16. 16. Project Summary Report release Other Key learning points and findings• Advanced retrofit is expensive but brings significant environmental, economic and social benefits over demolition and new build.• Scaling up retrofit regionally has potentially massive benefits.• Understand the home, select correct whole house strategy.• Follow energy design hierarchy and use proven innovation for more positive carbon value / abatement outcomes.• Energy modelling and targets:– rdSAP is inadequate to model true benefits of advanced retrofit.– kg/m2/yr or CO2/m2/yr makes a better target and gives fairer comparison than % emissions reduction targets against baseline.
  17. 17. Project Summary ReportKey learning points & findings cont’d…• A community liaison officer is essential.• Briefing residents on energy efficiency requires a sustained campaign approach.• Running cost savings of up to 60% post advanced retrofit are possible (be circumspect on predictions given to residents).• Always evaluate the social, economic and environmental aspects of the project.• The construction industry needs to up skill and gain knowledge to sell new services - but where is customer demand?
  18. 18. Project Summary ReportKey learning points & findings cont’d…• Continuity of air tightness and insulation is key – detailing!• Ensure good Project Management – sequencing of work, integration of trades and on-site quality control.• Beware the hidden costs of retrofit – not only capital costs of work.• ERDF / EU project management is very demanding.• The Green deal won’t work for C80 advanced retrofit• Improved resident comfort, well-being and satisfaction is rewarding - Here’s what residents said…
  19. 19. Resident feedback:“It’s like having a new home on the same plot ofland, they are so much warmer, before they wereso cold and damp, we even had mould growing.It’s so much better now.”“ I’ve been running on solar again all day today!”“The bills are so much cheaper. Bearing in mindwhat sort of winter we have had, I was reallysurprised how much I’ve saved.”
  20. 20. 1970’s End of Terrace, Fareham• BREEAM domestic refurbishment pilot - Very Good rating• 75% reduction regulated emissions• Measures applied: – 500mm loft insulation – Cavity + 32mm IW insulation – MVHR – 2 x 1.35kWp PV (East & West)• £30,000 on energy efficiency
  21. 21. • Cost: £30,000 for energy efficiency related works.• Year 1 & 2 feedback on my home.• Over 400 visitors, many taking action!• Total emissions = 545kg year 1, 270kg yr 2.• Running costs = £319 year 1, £274 yr 2.• ASHP £230 year 1, £190 yr 2.• Credit with FIT income +£511 year 1, + £658 yr 2. ☺• Water consumption 68 l/p/d.• Further details at www.sunpowerCO2ttage.co.uk
  22. 22. Targets for new housingcarbon compliance 2016
  23. 23. Introduction and standards• EcoHomes (obsolete EAM for new housing)• Code for Sustainable Homes (current EAM)• Interim report by Zero Carbon Hub (ZCH)• Recommendations of the Zero Carbon Hub (ZCH) task group final report - future standard• Building Regulations 2010 (part L revision due 2013 and 2016 for compliance with ZCH)
  24. 24. CfSH Energy Code Level Energy Waterand Water – % better Litres per than personMandatory 2006 per dayminimum Building (predictedstandards Regs – see also part L* part G) 1 10% 120 2 18% 120 3** 25% 105 4*** 44% 105 5 100% 80 6 Zero Carbon 80 (approx 141%) *DER improvement on TER ** Same as Bldg Regs part L 2010 *** 25% improvement on part L 2010
  25. 25. ^Code 6
  26. 26. ZCH recommendations• Interim report considered 70% energy improvement• Final ZCH report concluded not possible in all cases Code 4 homes• Government has pledged to adopt ZCH final report findings in full through Building Regs by 2016 (further consultation to follow)• By 2016 ‘Zero carbon homes’ – new definition!• First Wessex is currently working in partnership with ZCH at Rowner, Gosport using TSB BPE funding.
  27. 27. ZCH recommendations cont’d…• ZCH based on regulated emissions only – Code 6 covering unregulated emissions defunct – New standard overall is the equivalent of Code 5• 3 steps to demonstrate ZCH compliance First two steps based on carbon compliance also known as Fabric Energy Efficiency Standards – FEES – Step 1: Ensuring an energy efficient approach to design. – Step 2: Reducing CO2 emissions through low & zero carbon technologies and local heat networks. – Step 3: Mitigating remaining emissions through allowable solutions (off site)
  28. 28. ZCH recommendations cont’d…• Carbon compliance (steps 1 & 2) compared with CfSH and Building Regs part L 2006 – Detached house = min 60% improvement – Attached house = min 56% improvement – Low rise apartment/flat = min 44% improvement (approx 25% above Part L 2010) – All above therefore Code 4 compliant• % improvement seen as confusing therefore move away (now an absolute as built limit rather than predicted at the design stage)
  29. 29. ZCH recommendations cont’d…• Carbon compliance can also be expressed in terms of energy use – Approx 46 kWh/m2/year (detached and semi detached) – Approx 39 kWh/m2/year (mid terrace, flat / apartment) – Note that passive house standard is 15 kWh/m2/year• Anticipated 2016 Building Regulations ‘built’ performance for carbon compliance on site – 10 kg CO2(eq) /m2/year for detached houses – 11 kg CO2(eq) /m2/year for attached houses – 14 kg CO2(eq) /m2/year for low rise apartment blocks (four storeys and below). – (A 70% reduction would have equated to 6-8kg/m2/yr)
  30. 30. ZCH recommendations cont’d…• Allowable solutions (relate to off setting / mitigating emissions off site between Carbon Compliance on site level and 100%)• ZCH refer to a financial contribution of £75/tonne over 30 years (could typically be in range of £2,000-2,500 per home)• Compliance on site with Code 5 = no allowable solutions payments• Income could potentially be allocated to energy infrastructure locally or retrofitting existing homes
  31. 31. Interesting ZCH implications• Averaging to achieve compliance across the development recommended by ZCH (not all homes would need to meet CC)• Weather assumptions for different UK locations may be considered• As built in-situ checks for compliance (could be as much as 90% sample, post construction checking at forefront of ZCH report)• Carbon intensity of the grid in coming years• Opportunity exists to exceed compliance
  32. 32. ZCH and Localism agenda• ZCH advocate one standard throughout UK• However, move away from national regulation standards towards local standards• LA’s could potentially set higher standards / introduce standards sooner – ministers may want rigorous technical analysis on alternative standards to maintain flexibility for house builders. – Local plans can potentially be used to set higher standards but independently verified as sound proposals.
  33. 33. Projected ZCH extra costs over Building Regs Cost of Carbon Semi Semi Detached Detached Compliance detached detached 2010 prices 2016 prices 2010 prices 2016 prices Capital costs over 2006 Building £8,500 £4,800 £12,900 £7,600 Regulations Capital Costs over 2010 Building £6,700 £3,500 £9,700 £5,400 Regulations Total cost of Semi Semi Detached Detached zero carbon detached detached (including 2010 prices 2016 prices 2010 prices 2016 prices allowable solutions) Capital costs over 2006 Building £13,700 £10,000 £19,800 £14,500 Regulations Capital Costs over 2010 Building £11,900 £8,700 £16,600 £12,300 Regulations
  34. 34. Future role of the CodefSH• Future perhaps uncertain• DCLG are owner of the Code (licensed to BRE) and Code will continue to operate this year• Likely to be revised to suit ZCH & changes to B Regs• As a holistic EAM operation expected to continue (sets wider and more stretching targets over min standards)• Regulators / public funders requirements not clear e.g. HCA Code 6 homes
  35. 35. Issues: the town today• Economic decline• Poor town centre• Disconnected town• Poor public transport links• Poor range of house types & tenure• Lack of employment and business opportunities• Need to protect habitats and species• Population
  36. 36. Future economic roles?Whitehill Bordon needs to plan foreconomic growth following withdrawal ofMoD by 2014/15. £12million DCLG funding received forPotential roles for Whitehill Bordon to focus quick win projectson:•Sustainable development & green industries•Innovation and technology•Tourism and leisure – South Downs National Park•Technical skills training•Employment
  37. 37. Revised master-plan proposal map 4,000 new homes New town centre Employment Enhanced areas Preserved green space
  38. 38. High level objectives• Carbon Neutrality - By 2036 the whole town should be carbon neutral.• Biodiversity – The target is a net increase in biodiversity.• Water neutrality – By using existing boreholes and wells and by reducing water usage and wastage we plan a completely water neutral development.• Transportation – Our target is to reduce car trips to 50% by 2036 in the entire town.• Economic Development – One local job per new household and jobs to replace those lost by the MoD withdrawal (5,500 in total).
  39. 39. STAGE D Whitehill Bordon Ecostation
  40. 40. One Planet Living
  41. 41. Early win housing projects:• Area based free loft and cavity insulation programme – 1,100 measures completed• LCCC funding: – 35 Eco-fit interest free revolving loans up to £10k• Eco-fit loans phase II – 50 interest free loans• Boiler ‘scrappage’ scheme – Pilot 20 x £500• LEAF funding - £40,000 – Focus on community of 95 solid wall pre-fabs• Exhibition House• Eco-terrace - design competition• Quebec Barracks – 100 homes, ZCH/Code 5
  42. 42. THANK YOU