Bimal Chandra Das                               Safety Checklist for Conveyor Belt     Department:-Sl.No.               Sa...
Bimal Chandra Das                    Safety Checklist For Conveyor Belt During Shut-Down   Department :-Sl.No.            ...
Upcoming SlideShare
Loading in...5
×

Check list for conveyor belt inspection, B C Das

4,314

Published on

It is sharing of knowledge. By Bimal Chandra Das, Rtd. AGM (Safety), Bokaro Steel Plant,/ Bokaro. Kolkata

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
4,314
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Check list for conveyor belt inspection, B C Das

  1. 1. Bimal Chandra Das Safety Checklist for Conveyor Belt Department:-Sl.No. Safety Check Points Status Remarks1. Is the Pull Cord working Yes / No2. Are the Emergency Switch working Yes / No3. Are The Head End/Tail End Drum Yes / No Guards in Position4. Are The Ramp / Platform & its Steps Yes / No are In good condition5. Is The Protection Guard of Ramp / Yes / No Platform in position6. Is the Siren / Hooter in Working Yes / No Condition Yes / No7. Are The Coupling Guards of The Chutes in position Yes / No8. Is there any Projected Material on the Belt Yes / No9. Is the Side Guard of the Conveyor Belt in position Yes / No10. Is the surrounding Illumination adequate Yes / No11. Is the Dust Concentration within the Limit Yes / No12. Is there any hanging Electrical Cable overhead or by the side of the worker Yes / No13. Are the Workmen wearing PPEs Yes / No14. Are the workmen deployed are in loose dress
  2. 2. Bimal Chandra Das Safety Checklist For Conveyor Belt During Shut-Down Department :-Sl.No. Points To Be Checked Status Remarks 1. Is the Permit To Work/ Shut Down taken Yes/No 2. Is the Main Switch in ‘Off” Condition Yes/No 3. Are the Fuses taken out Yes/No 4. Are the Caution Tags Displayed Yes/No 5. Are the Tools / Materials Removed from Yes/No the Belt after Shut Down 6. Are the Workmen at a Safe Distance Yes/No before Starting of the Belt 7. Are the Coupling Guards fitted back in Yes/No their Position before Starting of Belt ? 8. Is the Siren / Hooter blown before Yes/No Starting

×